In short

Anant Homes in Hadapsar is MahaRERA-registered (P52100030724) and still under construction, with possession filed for December 2028. No sales are registered in this project yet. Units the same size elsewhere in Hadapsar have registered at ₹10,354 per sq ft of carpet — the neighbourhood, not this building. About 2% of the 80 units are sold. Nilesh Construction is the promoter.

Stock image, not a photograph of Anant Homes Stock image
Where
Hadapsar
pincode 411028
Nearby at
₹10,354
per sq ft, same sizes in Hadapsar
Available
1 BHK
78 left · 367–488 sq ft
Now due
Dec 2028
3.2 years later than first promised
A stock photograph, not Anant Homes. We have no picture of this site yet.

Where this is

Hadapsar, PMC, Pune, 411028

Village
Hadapsar
Taluka
Haveli
Pincode
411028

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 80 flats are filed unit by unit with the authority, the highest on floor 5. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 80 units · 78 available

60 units 367 sq ft 34.09 sq m as filed
20 units 488 sq ft 45.36 sq m as filed
Units sold

2 / 80

Pre-launch / early phase

2% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 80 flats · 78 available

367 sq ft carpet as drawn, from 367–488 sq ft filed in this configuration

Carpet, filed
367 sq ft
Built-up
about 440 sq ft
Super built-up
about 514 sq ft
Every room in this flat

Living and dining about 138 sq ft, Master bedroom about 92 sq ft, Kitchen about 55 sq ft, Bath about 32 sq ft, Balcony about 32 sq ft, Passage about 18 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What flats like these cost nearby

No sale has been registered at Anant Homes yet. 2 agreements have been filed, which is too few to divide into a rate anyone should act on.

₹10,354 per sq ft of carpet, median of 534 registered sales of the same configuration in Hadapsar
On sale here Registered in Hadapsar Which for this size is
1 BHK 367–488 sq ft ₹10,354/sq ft 534 sales, 18 projects ₹38 lakh–₹50.5 lakh middle half ₹6,662–12,355/sq ft

Each rate is what buyers contracted to pay for the same configuration in Hadapsar, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Hadapsar.

The state values these at ₹5,301 per sq ft of carpet — one rate across all 78 still available, which puts the smallest at ₹19.5 lakh and the largest at ₹25.9 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Timeline audit

Original proposed Oct 2025
Current status Due Dec 2028

Revised projection

The completion date has moved from October 2025 to December 2028, 3.2 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S No 59/1/4/6 is the plot this project is built on, as filed
Revenue village Hadapsar
TalukaHaveli
Street, as filed Handewadi Road
Bounded north by Celebration Society
Bounded east by Adj S No 59 Part
Bounded south by Proposed 9 Mtr Wide Road
Bounded west by Adj S No 59 Part

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerNilesh Construction
Registered office202, Sn 162, Lp Classic, Solapur Road, S No 162, Hadapsar, Pune 411028

Professionals named on the filing

Architect Cubix Architects Associates CA/2016/74325
Engineer Shravan Rathi LE0054
Engineer Structure Vizion
Chartered Accountant A S Jangada & Associates 619738
Chartered Accountant Abhijit Khade and Associates 048770
Chartered Accountant Jeevan Prakash Chouhan 137922

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

21 August 2021 is when an advocate last certified the title to this land
Title report Title Search Report Annexure.pdf 21 August 2021
Promoter's declaration, Form B Form B.pdf 19 August 2021

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100030724
Promoter Nilesh Construction
Project typeResidential / Group Housing · Building development
LocalityHadapsar — Haveli taluka, pincode 411028
Applied on21 August 2021
Registered on08 September 2021
Completion, as first filed31 October 2025
Due31 December 2028 3.2 years later
Units declared80
Units sold 2 of 80 sold (2%), 78 still unsold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 02 March 2026
Application referenceREA52100093525
Current statusActive
Record last changed 06 May 2026 · 4 months ago

Where the sold count comes from, and whether it holds up. 2 of 80 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 80 flats and reaches the same answer — 2 sold, every one with money recorded as received against a named flat, and 78 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 06 May 2026.

Common questions

Is Anant Homes registered with MahaRERA?
Yes. It is registered as P52100030724, filed on 08 September 2021, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Anant Homes due to be handed over?
The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Anant Homes been delayed?
Yes. The first date filed was October 2025. It now stands at December 2028, 3.2 years later.
What does a flat in Anant Homes cost?
Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Hadapsar have registered at ₹10,354 per square foot of carpet — the neighbourhood, not this building.
How many flats are left in Anant Homes?
78 of 80 were still unsold at the promoter's last filing, in 1 BHK, from 367–488 sq ft of carpet.
Are there complaints against Anant Homes?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Anant Homes?
Nilesh Construction, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100030724 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Hadapsar