Z Zomefy

RERA registered PR1261012500749 Active

Amanora Gateway Towers 2 – Tower 101

Hadapsar, Pune · Residential / Group Housing by City Corporation Limited

Official record Updated from the register 14 October 2026. Anything filed since then is not here yet.

In short

Amanora Gateway Towers 2 – Tower 101 in Hadapsar is MahaRERA-registered (PR1261012500749) and still under construction, with possession filed for April 2031. Buyers have already registered 57 sales here at a median ₹24,915 per sq ft of carpet — not an asking price. About 34% of the 170 units are sold. 1 complaint sits on the filing. City Corporation Limited is the promoter.

Stock image, not a photograph of Amanora Gateway Towers 2 – Tower 101 Stock image
Where
Hadapsar
pincode 411028
Sold here at
₹24,915
per sq ft, 57 registered sales
Available
1 BHK, 2 BHK, 3 BHK, 4 BHK, 5 BHK, Duplex
113 left · 723–4,523 sq ft
Now due
Apr 2031
4 months later than first promised
A stock photograph, not Amanora Gateway Towers 2 – Tower 101. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Hadapsar · Haveli

Hadapsar, PMC, Pune, 411028

Street map of Hadapsar centred on the coordinate filed for Amanora Gateway Towers 2 – Tower 101, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village Hadapsar
Taluka Haveli
Pincode 411028
Promoter Pin Coordinates 18.518980, 73.940437

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 170 flats are filed unit by unit with the authority, the highest on floor 42. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
170 Total Licenced Units
Residential Typology • 0.6% of tower

1 BHK Residences

1 Available 1 registered total
Estimated Market Window ₹1.8 crore
Locality Benchmark ₹24,915 / sq ft
Carpet Variations as Filed Span: 723 sq ft
723 sq ft 67.13 sq m 1 unit
Govt ASR Base: ₹88.5 lakh 1 of 1 available
Residential Typology • 2.4% of tower

2 BHK Residences

1 Available 4 registered total
Estimated Market Window ₹2.2 crore – ₹2.5 crore
Locality Benchmark ₹24,915 / sq ft
Carpet Variations as Filed Span: 863 to 1014 sq ft
863 sq ft 80.15 sq m 1 unit
970 sq ft 90.07 sq m 2 units
1014 sq ft 94.22 sq m 1 unit
Govt ASR Base: ₹1.2 crore 1 of 4 available
Executive Typology • 30.6% of tower

3 BHK Residences

32 Available 52 registered total
Estimated Market Window ₹3.2 crore – ₹5.2 crore
Locality Benchmark ₹24,915 / sq ft
Carpet Variations as Filed Span: 1266 to 2099 sq ft
1266 sq ft 117.57 sq m 12 units
1276 sq ft 118.58 sq m 14 units
1315 sq ft 122.14 sq m 2 units
1318 sq ft 122.4 sq m 4 units
1339 sq ft 124.42 sq m 7 units
1454 sq ft 135.11 sq m 1 unit
1458 sq ft 135.45 sq m 9 units
1468 sq ft 136.41 sq m 1 unit
1477 sq ft 137.2 sq m 1 unit
2099 sq ft 194.97 sq m 1 unit
Govt ASR Base: ₹1.5 crore – ₹2 crore 32 of 52 available
Executive Typology • 21.2% of tower

4 BHK Residences

28 Available 36 registered total
Estimated Market Window ₹4.2 crore – ₹7.6 crore
Locality Benchmark ₹24,915 / sq ft
Carpet Variations as Filed Span: 1677 to 3043 sq ft
1677 sq ft 155.76 sq m 5 units
1753 sq ft 162.82 sq m 8 units
1855 sq ft 172.37 sq m 7 units
1922 sq ft 178.56 sq m 1 unit
1928 sq ft 179.14 sq m 1 unit
1953 sq ft 181.46 sq m 1 unit
1984 sq ft 184.35 sq m 1 unit
2060 sq ft 191.37 sq m 1 unit
2081 sq ft 193.32 sq m 2 units
2165 sq ft 201.09 sq m 3 units
2267 sq ft 210.65 sq m 1 unit
2366 sq ft 219.78 sq m 1 unit
2381 sq ft 221.17 sq m 1 unit
2461 sq ft 228.62 sq m 1 unit
2793 sq ft 259.51 sq m 1 unit
3043 sq ft 282.72 sq m 1 unit
Govt ASR Base: ₹2 crore – ₹3.8 crore 28 of 36 available
Residential Typology • 3.5% of tower

5 BHK Residences

5 Available 6 registered total
Estimated Market Window ₹5.7 crore – ₹7.3 crore
Locality Benchmark ₹24,915 / sq ft
Carpet Variations as Filed Span: 2301 to 2938 sq ft
2301 sq ft 213.77 sq m 2 units
2388 sq ft 221.86 sq m 2 units
2938 sq ft 272.96 sq m 2 units
Govt ASR Base: ₹2.8 crore – ₹4.3 crore 5 of 6 available
Residential Typology • 7.1% of tower

Duplex Residences

9 Available 12 registered total
Estimated Market Window ₹3.4 crore – ₹8.6 crore
Locality Benchmark ₹24,915 / sq ft
Carpet Variations as Filed Span: 1359 to 3463 sq ft
1359 sq ft 126.26 sq m 1 unit
1438 sq ft 133.58 sq m 1 unit
1961 sq ft 182.22 sq m 6 units
2269 sq ft 210.84 sq m 1 unit
2831 sq ft 263.05 sq m 1 unit
3004 sq ft 279.04 sq m 1 unit
3463 sq ft 321.7 sq m 1 unit
Govt ASR Base: ₹1.5 crore – ₹4.7 crore 9 of 12 available
Dominant Typology • 34.7% of tower

Other Residences

37 Available 59 registered total
Estimated Market Window ₹2.5 crore – ₹11.3 crore
Locality Benchmark ₹24,915 / sq ft
Carpet Variations as Filed Span: 1022 to 4523 sq ft
1022 sq ft 94.94 sq m 5 units
1034 sq ft 96.1 sq m 9 units
1111 sq ft 103.18 sq m 6 units
2401 sq ft 223.03 sq m 38 units
4523 sq ft 420.24 sq m 1 unit
Govt ASR Base: ₹1.2 crore – ₹7.7 crore 37 of 59 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
1 BHK 723 sq ft (67.13 sq m) ~868 sq ft ~1012 sq ft 1 left of 1
2 BHK 863 – 1014 sq ft (80.15 – 94.22 sq m) ~1036 – 1217 sq ft ~1208 – 1420 sq ft 1 left of 4
3 BHK 1266 – 2099 sq ft (117.57 – 194.97 sq m) ~1519 – 2519 sq ft ~1772 – 2939 sq ft 32 left of 52
4 BHK 1677 – 3043 sq ft (155.76 – 282.72 sq m) ~2012 – 3652 sq ft ~2348 – 4260 sq ft 28 left of 36
5 BHK 2301 – 2938 sq ft (213.77 – 272.96 sq m) ~2761 – 3526 sq ft ~3221 – 4113 sq ft 5 left of 6
Duplex 1359 – 3463 sq ft (126.26 – 321.7 sq m) ~1631 – 4156 sq ft ~1903 – 4848 sq ft 9 left of 12
Other 1022 – 4523 sq ft (94.94 – 420.24 sq m) ~1226 – 5428 sq ft ~1431 – 6332 sq ft 37 left of 59
Units sold

57 / 170

Early sales

34% absorption rate

Visual area guide See what the filed sizes feel like 5 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 1 flat · 1 available

723 sq ft carpet as drawn

Carpet, filed
723 sq ft
Built-up
about 868 sq ft
Super built-up
about 1,012 sq ft
Every room in this flat

Living and dining about 271 sq ft, Master bedroom about 181 sq ft, Kitchen about 108 sq ft, Bath about 63 sq ft, Balcony about 63 sq ft, Passage about 36 sq ft.

2 BHK 4 flats · 1 available

970 sq ft carpet as drawn, from 863–1,014 sq ft filed in this configuration

Carpet, filed
970 sq ft
Built-up
about 1,164 sq ft
Super built-up
about 1,358 sq ft
Every room in this flat

Living and dining about 283 sq ft, Master bedroom about 188 sq ft, Second bedroom about 151 sq ft, Kitchen about 113 sq ft, Bath about 66 sq ft, Balcony about 66 sq ft, Second bath about 57 sq ft, Passage about 47 sq ft.

3 BHK 52 flats · 32 available

1,276 sq ft carpet as drawn, from 1,266–2,099 sq ft filed in this configuration

Carpet, filed
1,276 sq ft
Built-up
about 1,531 sq ft
Super built-up
about 1,786 sq ft
Every room in this flat

Living and dining about 314 sq ft, Master bedroom about 209 sq ft, Second bedroom about 167 sq ft, Third bedroom about 136 sq ft, Kitchen about 126 sq ft, Bath about 73 sq ft, Balcony about 73 sq ft, Second bath about 63 sq ft, Passage about 63 sq ft, Third bath about 52 sq ft.

4 BHK 36 flats · 28 available

1,753 sq ft carpet as drawn, from 1,677–3,043 sq ft filed in this configuration

Carpet, filed
1,753 sq ft
Built-up
about 2,104 sq ft
Super built-up
about 2,454 sq ft
Every room in this flat

Living and dining about 390 sq ft, Master bedroom about 260 sq ft, Second bedroom about 208 sq ft, Third bedroom about 169 sq ft, Kitchen about 156 sq ft, Fourth bedroom about 156 sq ft, Bath about 91 sq ft, Balcony about 91 sq ft, Passage about 91 sq ft, Second bath about 78 sq ft, Third bath about 65 sq ft.

5 BHK 6 flats · 5 available

2,301 sq ft carpet as drawn, from 2,301–2,938 sq ft filed in this configuration

Carpet, filed
2,301 sq ft
Built-up
about 2,761 sq ft
Super built-up
about 3,221 sq ft
Every room in this flat

Living and dining about 470 sq ft, Master bedroom about 313 sq ft, Second bedroom about 250 sq ft, Third bedroom about 203 sq ft, Kitchen about 188 sq ft, Fourth bedroom about 188 sq ft, Fifth bedroom about 172 sq ft, Passage about 125 sq ft, Bath about 110 sq ft, Balcony about 110 sq ft, Second bath about 94 sq ft, Third bath about 78 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹24,915 per sq ft of carpet, median of 57 registered sales
Range across those sales ₹16,841 to ₹33,806 per sq ft
Sold and booked 28 sold, 29 booked
Still available 113 flats, 723–4523 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State Revised (+4 months)
Original Baseline
Dec 2030
Declared at registration
Current Statutory Date
Due
Apr 2031
4 months later than filed

Revised delivery projection

The completion date has moved from December 2030 to April 2031, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S. NO. 138/18 and others, Sector R7/1, Amanora Park Town, Hadapsar is the plot this project is built on, as filed
Revenue village Hadapsar
TalukaHaveli
Street, as filed Hadapsar-Kharadi Byepass
Bounded north by 24 Mtr Road
Bounded east by Sector G4
Bounded south by 18 Mtr Road and Sector ATC
Bounded west by 24 Mtr Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerCity Corporation Limited
Registered office917/19 A, City Chambers, F.C. Road, Near British Library, Pune 411004

Professionals named on the filing

Architect GNA Architects CA/2011/51343
Engineer City Corporation Limited
Chartered Accountant A S Jinturkar and Company 163038
Chartered Accountant SPCM and Associates 038607

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
SM12500181 Nov 2025 Order passed Nov 2025

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

28 August 2025 is when an advocate last certified the title to this land
Title report Title Certificate 28082025.pdf 28 August 2025
Conveyance deed CCL Amalgamated 7-12.pdf 28 August 2025
Promoter's declaration, Form B Form B Declaration Tower 101.pdf 5 August 2025
Annexure A declaration Annexure A.pdf 28 August 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1261012500749
Promoter City Corporation Limited
Project typeResidential / Group Housing · Building development
LocalityHadapsar — Haveli taluka, pincode 411028
Applied on29 August 2025
Registered on10 September 2025
Completion, as first filed31 December 2030
Due30 April 2031 4 months later
Units declared170
Units sold 57 of 170 sold (34%), 113 still unsold
Complaints1 on record with MahaRERA
Certificate on file Original registration certificate, issued 10 September 2025
Application referenceACK05082502556
Current statusActive
Record last changed 10 September 2025 · 13 months ago

Where the sold count comes from, and whether it holds up. 57 of 170 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 170 flats and reaches the same answer — 28 sold, every one with money recorded as received against a named flat, 29 booked with a price agreed but nothing received yet, and 113 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 10 September 2025.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Amanora Gateway Towers 2 – Tower 101 registered with MahaRERA?
Yes. It is registered as PR1261012500749, filed on 10 September 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Amanora Gateway Towers 2 – Tower 101 due to be handed over?
The promoter has told MahaRERA April 2031. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Amanora Gateway Towers 2 – Tower 101 been delayed?
Yes. The first date filed was December 2030. It now stands at April 2031, 4 months later.
What did buyers actually pay in Amanora Gateway Towers 2 – Tower 101?
A median of ₹24,915 per square foot of carpet, across 57 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Amanora Gateway Towers 2 – Tower 101?
113 of 170 were still unsold at the promoter's last filing, in 1, 2, 3, 4, 5 BHK + duplex, from 723–4,523 sq ft of carpet.
Are there complaints against Amanora Gateway Towers 2 – Tower 101?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Amanora Gateway Towers 2 – Tower 101?
City Corporation Limited, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 14 October 2026. The authority's own registry page for PR1261012500749 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Hadapsar

Stock image, not a photograph of The High Gates Stock image
Registered here
₹11,370
On offer
1, 2, 3 BHK +2 more
Under construction

The High Gates

Pr Associates · Hadapsar

60 sold

1 complaint

Slipped 4 months
Due
Apr 2027
Units
271
Carpet
263–3,271
Sold at
₹93.6 lakh
P52100049093