RERA registered P52100047453 Completed
Amanora Ascent Avenue
Hadapsar, Pune · Commercial by City Corporation Limited
Official record Updated from the register 10 October 2026. Anything filed since then is not here yet.
In short
Amanora Ascent Avenue in Hadapsar is MahaRERA-registered (P52100047453) and was handed over in September 2025. No registered sales are on file here yet. The government values the units from ₹9,103 per sq ft of carpet, a stamp-duty floor rather than a market price. About 69% of the 131 units are sold. City Corporation Limited is the promoter.
- Valued from
- ₹9,103
- per sq ft, the government’s floor
- Available
- Office Space, Shops, Showroom
- 40 left · 452–6,182 sq ft
- Now due
- Sep 2025
- 2 months later than first promised
Where this is
Hadapsar, PMC, Pune, 411028
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 131 units are filed unit by unit with the authority, the highest on floor 6. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
Nothing filed here is a home. Every unit is registered as non-residential — shops, offices or similar — which is the promoter's own answer on the register rather than anything read off the areas below.
Configuration not filed 2 units · all available
Office Space 117 units · 29 available
5 further sizes, 17 units between them
Shops 10 units · 7 available
Showroom 2 units · all available
91 / 131
69% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.
Office Space 117 units · 29 available
523 sq ft carpet as drawn, from 312–1,544 sq ft filed in this configuration
- Carpet, filed
- 523 sq ft
- Built-up
- about 628 sq ft
- Super built-up
- about 732 sq ft
Shops 10 units · 7 available
1,112 sq ft carpet as drawn, from 348–1,933 sq ft filed in this configuration
- Carpet, filed
- 1,112 sq ft
- Built-up
- about 1,334 sq ft
- Super built-up
- about 1,557 sq ft
Showroom 2 units · 2 available
5,830 sq ft carpet as drawn, from 5,830–6,182 sq ft filed in this configuration
- Carpet, filed
- 5,830 sq ft
- Built-up
- about 6,996 sq ft
- Super built-up
- about 8,162 sq ft
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What these units are valued at
No sale has been registered at Amanora Ascent Avenue yet. The promoter has filed no agreement values, so nothing below is this project's own price.
| On sale here | Carpet | Valued at no less than |
|---|---|---|
| Not named 2 unsold | 1,612–4,398 sq ft | ₹1.5 crore–₹4 crore ₹9,103/sq ft |
| Office Space 29 unsold | 456–1,544 sq ft | ₹41.5 lakh–₹1.4 crore ₹9,103/sq ft |
| Shops 7 unsold | 452–1,933 sq ft | ₹41.2 lakh–₹2.4 crore ₹9,103/sq ft |
| Showroom 2 unsold | 5,830–6,182 sq ft | ₹5.6 crore–₹7.3 crore ₹10,795/sq ft |
This is the Annual Statement of Rates value the promoter filed against each unsold unit — the state's valuation, not an asking price and not a discount. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Revised projection
The completion date has moved from June 2025 to September 2025, 2 months later, on the promoter's own revised filing.
Buyers who took possession late here may still have had a claim under section 18 of the Real Estate (Regulation and Development) Act, which entitles them to interest for every month of delay beyond the date in their agreement. More usefully for anyone buying today, this is a record of how this promoter performed against their own filed date.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Hadapsar |
|---|---|
| Taluka | Haveli |
| Street, as filed | Hadapsar-Kharadi Byepass |
| Bounded north by | 24 M wide Road |
| Bounded east by | Proposed Sector G19 |
| Bounded south by | Sector R6 |
| Bounded west by | Amanora Internal Road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | City Corporation Limited |
|---|---|
| Registered office | 917/19 A, City Chambers, F.C. Road, Near British Library, Pune 411004 |
Professionals named on the filing
| Architect | GNA Architects |
|---|---|
| Engineer | Mr. Ankush Mahajan |
| Chartered Accountant | R V Porwal and Associates |
| Chartered Accountant | SPCM and Associates 038607 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Sector C8 Title Report.pdf | 27 October 2022 |
|---|---|
| Promoter's declaration, Form B Form B Declaration.pdf | 20 September 2022 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100047453 |
| Promoter | City Corporation Limited |
| Project type | Commercial · Building development |
| Locality | Hadapsar — Haveli taluka, pincode 411028 |
| Applied on | 24 September 2022 |
| Registered on | 31 October 2022 |
| Completion, as first filed | 30 June 2025 |
| Handed over | 12 September 2025 2 months later |
| Units declared | 131 |
| Units sold | 91 of 131 sold (69%), 40 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 13 August 2026 |
| Application reference | REA52100120625 |
| Current status | Completed |
| Record last changed | 13 August 2026 · 2 months ago |
Where the sold count comes from, and whether it holds up. 91 of 131 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 131 units and reaches the same answer — 75 sold, 74 of them with money recorded as received against a named unit, 16 booked with a price agreed but nothing received yet, and 40 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 13 August 2026.
Common questions
- Is Amanora Ascent Avenue registered with MahaRERA?
- Yes. It is registered as P52100047453, filed on 31 October 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- Has Amanora Ascent Avenue been handed over?
- Yes. The completion date on the register is September 2025.
- Has Amanora Ascent Avenue been delayed?
- Yes. The first date filed was June 2025. It now stands at September 2025, 2 months later.
- What does a unit in Amanora Ascent Avenue cost?
- Nothing has been registered here yet. The government values the units at ₹9,103 per square foot of carpet, which is the floor stamp duty is charged on and is normally below what anyone pays.
- How many units are left in Amanora Ascent Avenue?
- 40 of 131 were still unsold at the promoter's last filing, in Offices +2 more, from 452–6,182 sq ft of carpet.
- Are there complaints against Amanora Ascent Avenue?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Amanora Ascent Avenue?
- City Corporation Limited, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 10 October 2026. The authority's own page for P52100047453 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Hadapsar
Stock image
- Registered here
- ₹11,542
- Done
- Dec 2025
- Units
- 225
- Carpet
- 204–1506
- Sold at
- ₹82.3 lakh
Stock image
- Done
- Sep 2018
- Units
- 88
- Carpet
- —
- Typical unit
- —
Stock image
- Done
- Jun 2025
- Units
- —
- Carpet
- —
- Typical flat
- —