RERA registered P52100052019 Active
Amanora Arbano Towers 73,74,75 and 76
Hadapsar, Pune · Residential / Group Housing by City Corporation Limited
Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.
In short
Amanora Arbano Towers 73,74,75 and 76 in Hadapsar is MahaRERA-registered (P52100052019) and still under construction, with possession filed for May 2028. Buyers have already registered 823 sales here at a median ₹12,871 per sq ft of carpet — not an asking price. About 98% of the 843 units are sold. 1 complaint sits on the filing. City Corporation Limited is the promoter.
- Sold here at
- ₹12,871
- per sq ft, 823 registered sales
- Available
- 1, 2, 3 BHK
- 20 left · 324–1,522 sq ft
- Possession
- May 2028
- as filed with MahaRERA
Where this is
Hadapsar, PMC, Pune, 411028
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 843 flats are filed unit by unit with the authority, the highest on floor 33. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 142 units · 6 available
2 BHK 321 units · 11 available
3 BHK 217 units · 1 available
Configuration not filed 163 units · 2 available
823 / 843
98% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 142 flats · 6 available
448 sq ft carpet as drawn, from 429–502 sq ft filed in this configuration
- Carpet, filed
- 448 sq ft
- Built-up
- about 538 sq ft
- Super built-up
- about 627 sq ft
Every room in this flat
Living and dining about 168 sq ft, Master bedroom about 112 sq ft, Kitchen about 67 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Passage about 22 sq ft.
2 BHK 321 flats · 11 available
682 sq ft carpet as drawn, from 682–852 sq ft filed in this configuration
- Carpet, filed
- 682 sq ft
- Built-up
- about 818 sq ft
- Super built-up
- about 955 sq ft
Every room in this flat
Living and dining about 199 sq ft, Master bedroom about 132 sq ft, Second bedroom about 106 sq ft, Kitchen about 79 sq ft, Bath about 46 sq ft, Balcony about 46 sq ft, Second bath about 40 sq ft, Passage about 33 sq ft.
3 BHK 217 flats · 1 available
982 sq ft carpet as drawn, from 982–1,130 sq ft filed in this configuration
- Carpet, filed
- 982 sq ft
- Built-up
- about 1,178 sq ft
- Super built-up
- about 1,375 sq ft
Every room in this flat
Living and dining about 241 sq ft, Master bedroom about 161 sq ft, Second bedroom about 129 sq ft, Third bedroom about 105 sq ft, Kitchen about 97 sq ft, Bath about 56 sq ft, Balcony about 56 sq ft, Second bath about 48 sq ft, Passage about 48 sq ft, Third bath about 40 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹10,597 to ₹16,781 per sq ft |
|---|---|
| Sold and booked | 775 sold, 48 booked |
| Still available | 20 flats, 324–1538 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Hadapsar |
|---|---|
| Taluka | Haveli |
| Street, as filed | Hadapsar Kharadi Byepass road |
| Bounded north by | Plot B Sector R18 by 1 |
| Bounded east by | Sector PG9 |
| Bounded south by | 15 M Road |
| Bounded west by | 12 M Road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | City Corporation Limited |
|---|---|
| Registered office | 917/19 A, City Chambers, F.C. Road, Near British Library, Pune 411004 |
Professionals named on the filing
| Architect | Gna Architects CA/2011/51343 |
|---|---|
| Architect | GNA Architects |
| Engineer | Mr. Ankush Mahajan |
| Engineer | Rahul Kulkarni |
| Chartered Accountant | A S Jinturkar and Company 163038 |
| Chartered Accountant | SPCM & Associates |
| Chartered Accountant | SPCM and Associates 038607 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
1 case against this project, 0 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC12604473 | Jul 2026 | No order on record |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report Final legal title report with flow Arbano Towers.pdf | 8 July 2023 |
|---|---|
| Promoter's declaration, Form B Final RERA FORM B with BR Amanora Arbano Towers 73 to 76.pdf | 24 May 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100052019 |
| Promoter | City Corporation Limited |
| Project type | Residential / Group Housing · Building development |
| Locality | Hadapsar — Haveli taluka, pincode 411028 |
| Applied on | 08 June 2023 |
| Registered on | 19 July 2023 |
| Completion, as first filed | 31 May 2028 |
| Due | 31 May 2028 |
| Units declared | 843 |
| Units sold | 823 of 843 sold (98%), 20 still unsold |
| Complaints | 1 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 19 July 2023 |
| Application reference | REA52100140380 |
| Current status | Active |
| Record last changed | 19 July 2023 · over 3 years ago 3 years untouched |
Where the sold count comes from, and whether it holds up. 823 of 843 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 843 flats and reaches the same answer — 775 sold, 773 of them with money recorded as received against a named flat, 48 booked with a price agreed but nothing received yet, and 20 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 19 July 2023.
MahaRERA has not recorded a change to this project's record in 3 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is Amanora Arbano Towers 73,74,75 and 76 registered with MahaRERA?
- Yes. It is registered as P52100052019, filed on 19 July 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Amanora Arbano Towers 73,74,75 and 76 due to be handed over?
- The promoter has told MahaRERA May 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Amanora Arbano Towers 73,74,75 and 76 been delayed?
- No. May 2028 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Amanora Arbano Towers 73,74,75 and 76?
- A median of ₹12,871 per square foot of carpet, across 823 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Amanora Arbano Towers 73,74,75 and 76?
- 20 of 843 were still unsold at the promoter's last filing, in 1, 2, 3 BHK, from 324–1,522 sq ft of carpet.
- Are there complaints against Amanora Arbano Towers 73,74,75 and 76?
- 1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Amanora Arbano Towers 73,74,75 and 76?
- City Corporation Limited, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100052019 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Hadapsar
Stock image
- Registered here
- ₹6,240
- On offer
- 2 BHK
- Due
- Dec 2026
- Units
- 80
- Carpet
- 625–783
- Sold at
- ₹44.5 lakh
Stock image
- Nearby
- ₹10,354–10,578
- On offer
- 1, 2 BHK + shops
- Due
- Apr 2030
- Units
- 151
- Carpet
- 255–540
- Typical unit
- ~₹34.4 lakh
Stock image
- Nearby
- ₹10,354–12,198
- On offer
- 1, 2, 3 BHK + shops
- Due
- Dec 2029
- Units
- 90
- Carpet
- 336–917
- Typical unit
- ~₹82.3 lakh