RERA registered P52100047518 Active
Casaverde
Ghorpadi, Pune · Residential / Group Housing by Skyboat Infrastructure Unit 1 LLP
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Casaverde in Ghorpadi is MahaRERA-registered (P52100047518) and still under construction, with possession filed for December 2026. Buyers have already registered 14 sales here at a median ₹11,902 per sq ft of carpet — not an asking price. Skyboat Infrastructure Unit 1 LLP is the promoter.
- Sold here at
- ₹11,902
- per sq ft, 14 registered sales
- Available
- 2, 3 BHK
- 3 left · 701–1,048 sq ft
- Now due
- Dec 2026
- a year later than first promised
Where this is
Ghorpadi, PMC, Pune, 411001
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 21 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 14 units · 2 available
3 BHK 7 units · 1 available
15 / 21
71% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 14 flats · 2 available
701 sq ft carpet as drawn, from 701–786 sq ft filed in this configuration
- Carpet, filed
- 701 sq ft
- Built-up
- about 841 sq ft
- Super built-up
- about 981 sq ft
Every room in this flat
Living and dining about 204 sq ft, Master bedroom about 136 sq ft, Second bedroom about 109 sq ft, Kitchen about 82 sq ft, Bath about 48 sq ft, Balcony about 48 sq ft, Second bath about 41 sq ft, Passage about 34 sq ft.
3 BHK 7 flats · 1 available
1,048 sq ft carpet as drawn
- Carpet, filed
- 1,048 sq ft
- Built-up
- about 1,258 sq ft
- Super built-up
- about 1,467 sq ft
Every room in this flat
Living and dining about 258 sq ft, Master bedroom about 172 sq ft, Second bedroom about 137 sq ft, Third bedroom about 112 sq ft, Kitchen about 103 sq ft, Bath about 60 sq ft, Balcony about 60 sq ft, Second bath about 52 sq ft, Passage about 52 sq ft, Third bath about 43 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹7,063 to ₹16,295 per sq ft |
|---|---|
| Sold and booked | 14 sold, 0 booked |
| Still available | 3 flats, 701–1048 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2025 to December 2026, a year later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Ghorpadi |
|---|---|
| Taluka | Haveli |
| Street, as filed | Ghorpadi |
| Bounded north by | By S no 70 1 |
| Bounded east by | By DP Road |
| Bounded south by | By S no 70 1 |
| Bounded west by | By Canal |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Skyboat Infrastructure Unit 1 LLP |
|---|---|
| Registered office | Flat No 05, Shri Tower, S No 156 3, Magarpatta Road, Hadapasar, Pune 411028 |
Professionals named on the filing
| Architect | Ar Atit Admulwar CA/2008/41887 |
|---|---|
| Architect | Harshvardhan Kunjir CA/2019/117674 |
| Engineer | Mr Kailas Sarode |
| Engineer | Rohinee Badgujar PCMC/LE/0651/2017 |
| Engineer | Rupesh Pawar ER.ADP-C3/147 |
| Chartered Accountant | CA Yogesh Mali 194796 |
| Chartered Accountant | RSPH & Associates 119544 |
| Chartered Accountant | Ritesh Shah 147907 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Format A (2)_compressed.pdf | 23 September 2022 1 older version on file |
|---|---|
| Promoter's declaration, Form B Form B - Promoter.pdf | 23 September 2022 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100047518 |
| Promoter | Skyboat Infrastructure Unit 1 LLP |
| Project type | Residential / Group Housing · Building development |
| Locality | Ghorpadi — Haveli taluka, pincode 411001 |
| Applied on | 28 September 2022 |
| Registered on | 07 November 2022 |
| Completion, as first filed | 31 December 2025 |
| Due | 31 December 2026 a year later |
| Units declared | 21 |
| Units sold | 15 of 21 sold (71%), 6 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 14 August 2026 |
| Application reference | REA52100120824 |
| Current status | Active |
| Record last changed | 14 August 2026 · 2 months ago |
Where the sold count comes from, and whether it holds up. 15 of 21 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 15 of 21 sold, leaving 6. The unit-by-unit list they file separately covers 21 flats and marks 14 sold with 3 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 14 August 2026.
Common questions
- Is Casaverde registered with MahaRERA?
- Yes. It is registered as P52100047518, filed on 07 November 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Casaverde due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Casaverde been delayed?
- Yes. The first date filed was December 2025. It now stands at December 2026, a year later.
- What did buyers actually pay in Casaverde?
- A median of ₹11,902 per square foot of carpet, across 14 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Casaverde?
- 3 of 21 were still unsold at the promoter's last filing, in 2, 3 BHK, from 701–1,048 sq ft of carpet.
- Are there complaints against Casaverde?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Casaverde?
- Skyboat Infrastructure Unit 1 LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100047518 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Ghorpadi
Stock image
- Nearby
- ₹13,307
- On offer
- 2 BHK + offices
- Due
- Nov 2027
- Units
- 14
- Carpet
- 697–2,775
- Typical unit
- ~₹68.1 lakh
Stock image
- Nearby
- ₹10,750–13,307
- On offer
- 2, 3 BHK
- Due
- Jul 2027
- Units
- 8
- Carpet
- 710–1,158
- Typical flat
- ~₹1 crore
Stock image
- Done
- Dec 2025
- Units
- —
- Carpet
- —
- Typical flat
- —