RERA registered PR1260002601082 Active
Janki - Shreyas CHS
Erandwane, Pune · Residential / Group Housing by Citadel Group
Official record Updated from the register 21 November 2026. Anything filed since then is not here yet.
In short
Janki - Shreyas CHS in Erandwane is MahaRERA-registered (PR1260002601082) and still under construction, with possession filed for September 2029. No sales are registered in this project yet. Units the same size elsewhere in Erandwane have registered at ₹22,434–28,166 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Citadel Group is the promoter.
- Nearby at
- ₹22,434–28,166
- per sq ft, same sizes in Erandwane
- Available
- 1, 2, 3, 4 BHK
- 47 left · 423–1,531 sq ft
- Now due
- Sep 2029
- 4 months later than first promised
Erandwane, PMC, Pune, 411004
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 47 flats are filed unit by unit with the authority, the highest on floor 9. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK Residences
2 BHK Residences
3 BHK Residences
4 BHK Residences
Carpet Area vs. Loading Factor Arithmetic
How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)
| Unit Configuration | Statutory RERA Carpet (Actual) | Approx Built-up (+20%) | Super Built-up (+40% Loading) | Available Inventory |
|---|---|---|---|---|
| 1 BHK | 423 – 450 sq ft (39.32 – 41.84 sq m) | ~508 – 540 sq ft | ~592 – 630 sq ft | 11 left of 11 |
| 2 BHK | 664 – 925 sq ft (61.67 – 85.97 sq m) | ~797 – 1110 sq ft | ~930 – 1295 sq ft | 9 left of 9 |
| 3 BHK | 983 – 1150 sq ft (91.35 – 106.8 sq m) | ~1180 – 1380 sq ft | ~1376 – 1610 sq ft | 18 left of 18 |
| 4 BHK | 983 – 1531 sq ft (91.35 – 142.23 sq m) | ~1180 – 1837 sq ft | ~1376 – 2143 sq ft | 9 left of 9 |
0 / 47
0% absorption rate
Visual area guide See what the filed sizes feel like 4 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 11 flats · 11 available
436 sq ft carpet as drawn, from 423–450 sq ft filed in this configuration
- Carpet, filed
- 436 sq ft
- Built-up
- about 523 sq ft
- Super built-up
- about 610 sq ft
Every room in this flat
Living and dining about 164 sq ft, Master bedroom about 109 sq ft, Kitchen about 65 sq ft, Bath about 38 sq ft, Balcony about 38 sq ft, Passage about 22 sq ft.
2 BHK 9 flats · 9 available
881 sq ft carpet as drawn, from 664–925 sq ft filed in this configuration
- Carpet, filed
- 881 sq ft
- Built-up
- about 1,057 sq ft
- Super built-up
- about 1,233 sq ft
Every room in this flat
Living and dining about 257 sq ft, Master bedroom about 171 sq ft, Second bedroom about 137 sq ft, Kitchen about 103 sq ft, Bath about 60 sq ft, Balcony about 60 sq ft, Second bath about 51 sq ft, Passage about 43 sq ft.
3 BHK 18 flats · 18 available
1,150 sq ft carpet as drawn, from 983–1,150 sq ft filed in this configuration
- Carpet, filed
- 1,150 sq ft
- Built-up
- about 1,380 sq ft
- Super built-up
- about 1,610 sq ft
Every room in this flat
Living and dining about 283 sq ft, Master bedroom about 189 sq ft, Second bedroom about 151 sq ft, Third bedroom about 123 sq ft, Kitchen about 113 sq ft, Bath about 66 sq ft, Balcony about 66 sq ft, Second bath about 57 sq ft, Passage about 57 sq ft, Third bath about 47 sq ft.
4 BHK 9 flats · 9 available
1,531 sq ft carpet as drawn, from 983–1,531 sq ft filed in this configuration
- Carpet, filed
- 1,531 sq ft
- Built-up
- about 1,837 sq ft
- Super built-up
- about 2,143 sq ft
Every room in this flat
Living and dining about 340 sq ft, Master bedroom about 227 sq ft, Second bedroom about 181 sq ft, Third bedroom about 147 sq ft, Kitchen about 136 sq ft, Fourth bedroom about 136 sq ft, Bath about 79 sq ft, Balcony about 79 sq ft, Passage about 79 sq ft, Second bath about 68 sq ft, Third bath about 57 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What flats like these cost nearby
No sale has been registered at Janki - Shreyas CHS yet. The promoter has filed no agreement values, so nothing below is this project's own price.
43 registered sale agreements across 3 nearby developments.
119 registered sale agreements across 10 nearby developments.
123 registered sale agreements across 15 nearby developments.
76 registered sale agreements across 5 nearby developments.
Each rate is what buyers contracted to pay for the same configuration in Erandwane, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Erandwane.
The state values these at ₹17,500 per sq ft of carpet — one rate across all 20 still available, which puts the smallest at ₹74.1 lakh and the largest at ₹2.7 crore. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Revised delivery projection
The completion date has moved from May 2029 to September 2029, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Erandwane South · shown on this site as Erandwane |
|---|---|
| Taluka | Haveli |
| Street, as filed | Prabhat road lane no 9 |
| Bounded north by | Existing road 6 m wide |
| Bounded east by | Plot no 47/9A |
| Bounded south by | Plot no 47/2B |
| Bounded west by | Plot no 47/4 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Citadel Group |
|---|---|
| Registered office | Apt 2, 35/13+14C, Flat No 6, Swapnapurti Apartments, Prabhat Road, Lane No. 8, Opp. President Hotel, Erandwane, Pune 411004 |
Professionals named on the filing
| Architect | Kaustubh Sandip Bawdekar CA/2016/73957 |
|---|---|
| Engineer | Ashish Ravindra Amale CE/BP/32526/25 |
| Chartered Accountant | Shyam Davawala 104929 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report RERA Legal Title Report_11zon.pdf | 26 February 2026 |
|---|---|
| Conveyance deed PRC.pdf | 1 July 2026 |
| Promoter's declaration, Form B Affidavit Cum Declaration - Developer.pdf | 27 February 2026 |
| Annexure A declaration Annexure A - Declaration cum Undertaking.pdf | 27 February 2026 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PR1260002601082 |
| Promoter | Citadel Group |
| Project type | Residential / Group Housing · Building development |
| Locality | Erandwane — Haveli taluka, pincode 411004 |
| Applied on | 30 April 2026 |
| Registered on | 08 July 2026 |
| Completion, as first filed | 01 May 2029 |
| Due | 01 September 2029 4 months later |
| Units declared | 47 |
| Units sold | None sold yet, all 47 on the market |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 12 October 2026 |
| Application reference | ACK12022606630 |
| Current status | Active |
| Record last changed | 08 July 2026 · 4 months ago |
Nothing has sold yet. The promoter's quarterly progress report says none of the 47 flats are gone, and the unit-by-unit list they file separately says the same: all 47 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 08 July 2026.
- Is Janki - Shreyas CHS registered with MahaRERA?
- Yes. It is registered as PR1260002601082, filed on 08 July 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Janki - Shreyas CHS due to be handed over?
- The promoter has told MahaRERA September 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Janki - Shreyas CHS been delayed?
- Yes. The first date filed was May 2029. It now stands at September 2029, 4 months later.
- What does a flat in Janki - Shreyas CHS cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Erandwane have registered at ₹22,434–28,166 per square foot of carpet — the neighbourhood, not this building.
- How many flats are left in Janki - Shreyas CHS?
- 47 of 47 were still unsold at the promoter's last filing, in 1, 2, 3, 4 BHK, from 423–1,531 sq ft of carpet.
- Are there complaints against Janki - Shreyas CHS?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Janki - Shreyas CHS?
- Citadel Group, as the promoter named on the registration.
Verify Government Filings Yourself
This dossier restates public records as filed on 21 November 2026. The authority's own registry page for PR1260002601082 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.
MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.
Other projects in Erandwane
Stock image
- Nearby
- ₹22,570–25,763
- On offer
- 2, 3 BHK
- Due
- Jun 2028
- Units
- 21
- Carpet
- 673–1,246
- Typical flat
- ~₹2.2 crore
Stock image
- Nearby
- ₹22,434–25,763
- On offer
- 1, 2, 3 BHK + 1 RK
- Due
- Jul 2028
- Units
- 11
- Carpet
- 439–807
- Typical flat
- ~₹1.5 crore
Stock image
- Nearby
- ₹22,434–28,166
- On offer
- 1, 2, 3, 4 BHK +2 more
- Due
- Oct 2030
- Units
- 44
- Carpet
- 451–2,052
- Typical unit
- ~₹2.7 crore