RERA registered P52100080803 Active
Shreeyash
Deccan Gymkhana, Pune · Residential / Group Housing by Lagoo Apte Properties LLP
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Shreeyash in Deccan Gymkhana is MahaRERA-registered (P52100080803) and still under construction, with possession filed for January 2029. Buyers have already registered 7 sales here at a median ₹14,916 per sq ft of carpet — not an asking price. About 24% of the 29 units are sold. Lagoo Apte Properties LLP is the promoter.
- Sold here at
- ₹14,916
- per sq ft, 7 registered sales
- Available
- 3 BHK
- 11 left · 1,133–1,267 sq ft
- Now due
- Jan 2029
- 4 months later than first promised
Where this is
Deccan Gymkhana, Pune, 411004
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Flat sizes on file
All 29 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 1 unit · not for sale
2 BHK 1 unit · all sold
3 BHK 27 units · 11 available
7 / 29
24% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 1 flat · none available
373 sq ft carpet as drawn
- Carpet, filed
- 373 sq ft
- Built-up
- about 448 sq ft
- Super built-up
- about 522 sq ft
Every room in this flat
Living and dining about 140 sq ft, Master bedroom about 93 sq ft, Kitchen about 56 sq ft, Bath about 33 sq ft, Balcony about 33 sq ft, Passage about 19 sq ft.
2 BHK 1 flat · none available
770 sq ft carpet as drawn
- Carpet, filed
- 770 sq ft
- Built-up
- about 924 sq ft
- Super built-up
- about 1,078 sq ft
Every room in this flat
Living and dining about 224 sq ft, Master bedroom about 150 sq ft, Second bedroom about 120 sq ft, Kitchen about 90 sq ft, Bath about 52 sq ft, Balcony about 52 sq ft, Second bath about 45 sq ft, Passage about 37 sq ft.
3 BHK 27 flats · 11 available
1,133 sq ft carpet as drawn, from 1,133–1,267 sq ft filed in this configuration
- Carpet, filed
- 1,133 sq ft
- Built-up
- about 1,360 sq ft
- Super built-up
- about 1,586 sq ft
Every room in this flat
Living and dining about 279 sq ft, Master bedroom about 186 sq ft, Second bedroom about 149 sq ft, Third bedroom about 121 sq ft, Kitchen about 111 sq ft, Bath about 65 sq ft, Balcony about 65 sq ft, Second bath about 56 sq ft, Passage about 56 sq ft, Third bath about 46 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹10,390 to ₹33,070 per sq ft |
|---|---|
| Sold and booked | 5 sold, 2 booked |
| Still available | 11 flats, 373–1267 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from September 2028 to January 2029, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Street, as filed | Pune |
|---|---|
| Bounded north by | By Plot No 65 |
| Bounded east by | By 30 ft Road of Society |
| Bounded south by | By Plot No 67 |
| Bounded west by | By S No 28 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Lagoo Apte Properties LLP |
|---|---|
| Registered office | Flat No 101, Prasad Apartment, Cts No 41/8, Final Plot No 62/8, Tarate Colony, Opp. Sonal Hall, Erandwane, Pune 411004 |
Professionals named on the filing
| Architect | Pushan Anand Limaye CA/1013/1678 |
|---|---|
| Engineer | Rahul D Hankare 0549/17 |
| Chartered Accountant | G S Tapdiya And Co 151197 |
| Chartered Accountant | YAP and Co. 136647 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Format A Search Report Merged.pdf | 7 April 2025 1 older version on file |
|---|---|
| Promoter's declaration, Form B Form-B-Lagoo Apte Properties LLP.pdf | 19 April 2025 1 older version on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100080803 |
| Promoter | Lagoo Apte Properties LLP |
| Project type | Residential / Group Housing · Building development |
| Locality | Deccan Gymkhana — Haveli taluka, pincode 411004 |
| Applied on | 21 April 2025 |
| Registered on | 10 July 2025 |
| Completion, as first filed | 30 September 2028 |
| Due | 30 January 2029 4 months later |
| Units declared | 29 |
| Units sold | 7 of 29 sold (24%), 22 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 03 September 2026 |
| Application reference | REA52100168735 |
| Current status | Active |
| Record last changed | 24 December 2025 · 9 months ago |
Where the sold count comes from, and whether it holds up. 7 of 29 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 29 flats and reaches the same answer — 5 sold, every one with money recorded as received against a named flat, 2 booked with a price agreed but nothing received yet, and 11 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 24 December 2025.
Common questions
- Is Shreeyash registered with MahaRERA?
- Yes. It is registered as P52100080803, filed on 10 July 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Shreeyash due to be handed over?
- The promoter has told MahaRERA January 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Shreeyash been delayed?
- Yes. The first date filed was September 2028. It now stands at January 2029, 4 months later.
- What did buyers actually pay in Shreeyash?
- A median of ₹14,916 per square foot of carpet, across 7 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Shreeyash?
- 11 of 29 were still unsold at the promoter's last filing, in 3 BHK, from 1,133–1,267 sq ft of carpet.
- Are there complaints against Shreeyash?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Shreeyash?
- Lagoo Apte Properties LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100080803 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Deccan Gymkhana
Stock image
- Due
- Apr 2027
- Units
- —
- Carpet
- —
- Typical flat
- —
Stock image
- Registered here
- ₹28,099
- On offer
- 2, 3, 4 BHK
- Due
- Jun 2028
- Units
- 54
- Carpet
- 676–1,817
- Sold at
- ₹2.1 crore
Stock image
- Registered here
- ₹15,530
- On offer
- 1 BHK
- Due
- Jul 2027
- Units
- 91
- Carpet
- 546–963
- Sold at
- ₹95 lakh