Z Zomefy

RERA registered P52100048594 Active

Casa Skyline

Dapodi, Pune · Residential / Group Housing by Star Reality Group

Official record Updated from the register 10 October 2026. Anything filed since then is not here yet.

In short

Casa Skyline in Dapodi is MahaRERA-registered (P52100048594) and still under construction, with possession filed for April 2028. Buyers have already registered 15 sales here at a median ₹8,598 per sq ft of carpet — not an asking price. Star Reality Group is the promoter.

Stock image, not a photograph of Casa Skyline Stock image
Where
Dapodi
pincode 411031
Sold here at
₹8,598
per sq ft, 15 registered sales
Available
1 BHK
1 left · 345 sq ft
Now due
Apr 2028
2.3 years later than first promised
A stock photograph, not Casa Skyline. We have no picture of this site yet.

Where this is

Dapodi, Pune, 411031

Village
Pimpri Chinchawad (M Corp.)
Taluka
Haveli
Pincode
411031
Coordinates
18.593591, 73.848078

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 21 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 14 units · 1 available

7 units 328 sq ft 30.47 sq m as filed
7 units 345 sq ft 32.04 sq m as filed

2 BHK 7 units · none available

7 units 496 sq ft 46.06 sq m as filed
Units sold

12 / 21

Selling steadily

57% absorption rate · the promoter's two filings disagree

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 14 flats · 1 available

328 sq ft carpet as drawn, from 328–345 sq ft filed in this configuration

Carpet, filed
328 sq ft
Built-up
about 394 sq ft
Super built-up
about 459 sq ft
Every room in this flat

Living and dining about 123 sq ft, Master bedroom about 82 sq ft, Kitchen about 49 sq ft, Bath about 29 sq ft, Balcony about 29 sq ft, Passage about 16 sq ft.

2 BHK 7 flats · none available

496 sq ft carpet as drawn

Carpet, filed
496 sq ft
Built-up
about 595 sq ft
Super built-up
about 694 sq ft
Every room in this flat

Living and dining about 144 sq ft, Master bedroom about 96 sq ft, Second bedroom about 77 sq ft, Kitchen about 58 sq ft, Bath about 34 sq ft, Balcony about 34 sq ft, Second bath about 29 sq ft, Passage about 24 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹8,598 per sq ft of carpet, median of 15 registered sales
Range across those sales ₹6,354 to ₹10,214 per sq ft
Sold and booked 15 sold, 0 booked
Still available 1 flat, 328–496 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2025
Current status Due Apr 2028

Revised projection

The completion date has moved from December 2025 to April 2028, 2.3 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S No 148 Hissa No 1/1/29 and 30 Bopkhel is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Dapodi
TalukaHaveli
Street, as filed Bopkhel
Bounded north by Plot boundary
Bounded east by PLot Boundary
Bounded south by 7 Meter proposed road
Bounded west by 12 Meter DP road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerStar Reality Group
Registered officeS No 207/2/1 Office 502, Muktai Heights, Alandi Road, Behind Gavhane Petrol Pump, Bhosari, Pune 411039

Professionals named on the filing

Architect A Square Architects pcmc-/las/0549
Architect Atul Bapurao Ranpise pcmc-/las/0549
Engineer Aadi Associates PCMC/LE/1011/2022
Engineer Hrishikesh Suryakant Kale EN21-27846
Engineer RCC Consultants Vijay Rangari 00000000000
Chartered Accountant CA Yogesh Kabra and Co 168410
Chartered Accountant Deepak C Kshirsagar 196448
Chartered Accountant Govind Murarilal Chomal 137644
Chartered Accountant Yogeshkumar Thanvi 402325

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

8 December 2022 is when an advocate last certified the title to this land
Title report Legal Format A star realty compressed.pdf 8 December 2022
Promoter's declaration, Form B Self declaration form B builder.pdf 8 December 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100048594
Promoter Star Reality Group
Project typeResidential / Group Housing · Building development
LocalityDapodi — Haveli taluka, pincode 411031
Applied on08 December 2022
Registered on10 January 2023
Completion, as first filed31 December 2025
Due30 April 2028 2.3 years later
Units declared21
Units sold 12 of 21 sold (57%), 9 still unsoldfilings disagree
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 19 August 2026
Application referenceREA52100125830
Current statusActive
Record last changed 14 August 2026 · 2 months ago

Where the sold count comes from, and whether it holds up. 12 of 21 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 12 of 21 sold, leaving 9. The unit-by-unit list they file separately covers 21 flats and marks 15 sold with 1 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 14 August 2026.

Common questions

Is Casa Skyline registered with MahaRERA?
Yes. It is registered as P52100048594, filed on 10 January 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Casa Skyline due to be handed over?
The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Casa Skyline been delayed?
Yes. The first date filed was December 2025. It now stands at April 2028, 2.3 years later.
What did buyers actually pay in Casa Skyline?
A median of ₹8,598 per square foot of carpet, across 15 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Casa Skyline?
1 of 21 were still unsold at the promoter's last filing, in 1 BHK, from 345 sq ft of carpet.
Are there complaints against Casa Skyline?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Casa Skyline?
Star Reality Group, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 10 October 2026. The authority's own page for P52100048594 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Dapodi

Stock image, not a photograph of Sunway Stock image
Registered here
₹6,603
Under construction

Sunway

Siddhi Builders · Dapodi

56 sold
Slipped 1.6 years
Due
Mar 2027
Units
16
Carpet
348–476
Sold at
₹28.9 lakh
P52100053281
Stock image, not a photograph of Swami Shrushti Stock image
Under construction

Swami Shrushti

Pruthviraj Developers Through Sagar Hanumant Ghule · Dapodi

Slipped 4 months
Due
Apr 2027
Units
—
Carpet
—
Typical flat
—
P52100053188