Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

Sunway in Dapodi is MahaRERA-registered (P52100053281). Possession was filed for August 2026, and that date has passed without a handover on the register. Buyers have already registered 9 sales here at a median ₹6,603 per sq ft of carpet — not an asking price. About 56% of the 16 units are sold. Siddhi Builders is the promoter.

Stock image, not a photograph of Sunway Stock image
Where
Dapodi
pincode 411031
Sold here at
₹6,603
per sq ft, 9 registered sales
Available
None left
every flat filed as sold or held
Was due
Aug 2026
16 days past its date, not handed over
A stock photograph, not Sunway. We have no picture of this site yet.

Where this is

Dapodi, Pune, 411031

Street map of Dapodi centred on the coordinate filed for Sunway, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Pimpri Chinchawad (M Corp.)
Taluka
Haveli
Pincode
411031
Coordinates
18.594212, 73.846491

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 16 flats are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 8 units · none available

8 units 348 sq ft 32.32 sq m as filed

2 BHK 8 units · none available

5 units 454 sq ft 42.21 sq m as filed
3 units 476 sq ft 44.21 sq m as filed
Units sold

9 / 16

Selling steadily

56% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 8 flats · none available

348 sq ft carpet as drawn

Carpet, filed
348 sq ft
Built-up
about 418 sq ft
Super built-up
about 487 sq ft
Every room in this flat

Living and dining about 130 sq ft, Master bedroom about 87 sq ft, Kitchen about 52 sq ft, Bath about 30 sq ft, Balcony about 30 sq ft, Passage about 17 sq ft.

2 BHK 8 flats · none available

454 sq ft carpet as drawn, from 454–476 sq ft filed in this configuration

Carpet, filed
454 sq ft
Built-up
about 545 sq ft
Super built-up
about 636 sq ft
Every room in this flat

Living and dining about 132 sq ft, Master bedroom about 88 sq ft, Second bedroom about 71 sq ft, Kitchen about 53 sq ft, Bath about 31 sq ft, Balcony about 31 sq ft, Second bath about 26 sq ft, Passage about 22 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹6,603 per sq ft of carpet, median of 9 registered sales
Range across those sales ₹5,749 to ₹9,464 per sq ft
Sold and booked 9 sold, 0 booked
Still available 0 flats, 348–476 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Aug 2025
Current status Was due Aug 2026

Revised projection

The completion date has moved from August 2025 to August 2026, a year later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

148/1/1/70, Bopkhel is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Dapodi
TalukaHaveli
Bounded north by By Property of Vasin Banglow
Bounded east by By Property of Varghese
Bounded south by By 16 mtrs Road
Bounded west by By Property of Supe Building

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerSiddhi Builders
Registered officeZhapke Wada, Cme, Bopkhel,, Pune 411031

Professionals named on the filing

Architect A Square Architects PCMC/LAS/0549
Engineer Rohinee Engineers PCMC/LE/0651/2017
Engineer Tejas Namdev Zapke NA
Chartered Accountant Bansal Garg and Associates 149496
Chartered Accountant Shruti Agarwal 170121

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

20 September 2023 is when an advocate last certified the title to this land
Title report Format A 20 9 23.pdf 20 September 2023 1 older version on file
Promoter's declaration, Form B Final Form B Promoter.pdf 5 September 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100053281
Promoter Siddhi Builders
Project typeResidential / Group Housing · Building development
LocalityDapodi — Haveli taluka, pincode 411031
Applied on26 September 2023
Registered on23 October 2023
Completion, as first filed31 August 2025
Was due31 August 2026 a year later
Units declared16
Units sold 9 of 16 sold (56%), 7 still unsold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 14 August 2026
Application referenceREA52100147041
Current statusActive
Record last changed 02 December 2025 · 9 months ago

Where the sold count comes from, and whether it holds up. 9 of 16 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 16 flats and reaches the same answer — 9 sold, every one with money recorded as received against a named flat, and 0 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 02 December 2025.

Common questions

Is Sunway registered with MahaRERA?
Yes. It is registered as P52100053281, filed on 23 October 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When was Sunway due to be handed over?
August 2026, and that date has passed without a handover being filed — 16 days ago. Section 18 of the Act gives an allottee a remedy when a promoter misses the date in the agreement.
What did buyers actually pay in Sunway?
A median of ₹6,603 per square foot of carpet, across 9 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Sunway?
None. All 16 are filed as sold or booked.
Are there complaints against Sunway?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Sunway?
Siddhi Builders, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100053281 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Dapodi

Stock image, not a photograph of Ghule Pride Stock image
Registered here
₹5,280
On offer
2 BHK
Ready to move

Ghule Pride

Shravya Developers · Dapodi

35 sold
Slipped 9 months
Done
Sep 2026
Units
17
Carpet
310–384
Sold at
₹20.2 lakh
P52100050890