Z Zomefy

RERA registered P52100049533 Active

Trimurti Residency

Chikhali, Pune · Residential / Group Housing by Trimurti Construction And Developers

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Trimurti Residency in Chikhali is MahaRERA-registered (P52100049533) and still under construction, with possession filed for May 2027. Buyers have already registered 7 sales here at a median ₹5,445 per sq ft of carpet — not an asking price. About 32% of the 22 units are sold. Trimurti Construction And Developers is the promoter.

Stock image, not a photograph of Trimurti Residency Stock image
Where
Chikhali
pincode 411062
Sold here at
₹5,445
per sq ft, 7 registered sales
Available
1 BHK
4 left · 446–468 sq ft
Now due
May 2027
16 months later than first promised
A stock photograph, not Trimurti Residency. We have no picture of this site yet.

Where this is

Chikhali, PCMC, Pune, 411062

Village
Chikhali
Taluka
Haveli
Pincode
411062

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 22 flats are filed unit by unit with the authority, the highest on floor 5. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 14 units · 4 available

5 units 446 sq ft 41.4 sq m as filed
9 units 468 sq ft 43.51 sq m as filed

2 BHK 8 units · not for sale

8 units 777 sq ft 72.22 sq m as filed
Units sold

7 / 22

Early sales

32% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 14 flats · 4 available

468 sq ft carpet as drawn, from 446–468 sq ft filed in this configuration

Carpet, filed
468 sq ft
Built-up
about 562 sq ft
Super built-up
about 655 sq ft
Every room in this flat

Living and dining about 176 sq ft, Master bedroom about 117 sq ft, Kitchen about 70 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Passage about 23 sq ft.

2 BHK 8 flats · none available

777 sq ft carpet as drawn

Carpet, filed
777 sq ft
Built-up
about 932 sq ft
Super built-up
about 1,088 sq ft
Every room in this flat

Living and dining about 226 sq ft, Master bedroom about 151 sq ft, Second bedroom about 121 sq ft, Kitchen about 91 sq ft, Bath about 53 sq ft, Balcony about 53 sq ft, Second bath about 45 sq ft, Passage about 38 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹5,445 per sq ft of carpet, median of 7 registered sales
Range across those sales ₹5,231 to ₹6,192 per sq ft
Sold and booked 4 sold, 3 booked
Still available 4 flats, 446–777 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Feb 2026
Current status Due May 2027

Revised projection

The completion date has moved from February 2026 to May 2027, 16 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

1648 P AT CHIKHALI is the plot this project is built on, as filed
Revenue village Chikhali
TalukaHaveli
Street, as filed CHIKHALI
Bounded north by PROPERTY OF MRS SUREKHA KUNDLIK KANGANE
Bounded east by PROPERTY OF MR RAMCHANDRA PARANDE
Bounded south by PROPERTY OF MR GAWARE AND MR MORE
Bounded west by BY ROAD

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerTrimurti Construction And Developers
Registered officeShop No 4, No 4, Vishnu Park, Kalbhornagar, Chinchwad, Pune 411019

Professionals named on the filing

Architect Ap Architect Interiorand Landscape Designers CA/2026/73956
Engineer Vaibhav Phadture
Chartered Accountant Pgmj And Associates 134039
Chartered Accountant Priyanka Sumeet Shingi 173577

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

6 February 2023 is when an advocate last certified the title to this land
Title report Trimurti developers Titile Report.pdf 6 February 2023
Promoter's declaration, Form B FORM B PROMOTER.pdf 9 January 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100049533
Promoter Trimurti Construction And Developers
Project typeResidential / Group Housing · Building development
LocalityChikhali — Haveli taluka, pincode 411062
Applied on23 January 2023
Registered on15 February 2023
Completion, as first filed04 February 2026
Due31 May 2027 16 months later
Units declared22
Units sold 7 of 22 sold (32%), 15 still unsold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 19 August 2026
Application referenceREA52100129511
Current statusActive
Record last changed 21 April 2026 · 5 months ago

Where the sold count comes from, and whether it holds up. 7 of 22 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 22 flats and reaches the same answer — 4 sold, every one with money recorded as received against a named flat, 3 booked with a price agreed but nothing received yet, and 4 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 21 April 2026.

Common questions

Is Trimurti Residency registered with MahaRERA?
Yes. It is registered as P52100049533, filed on 15 February 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Trimurti Residency due to be handed over?
The promoter has told MahaRERA May 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Trimurti Residency been delayed?
Yes. The first date filed was February 2026. It now stands at May 2027, 16 months later.
What did buyers actually pay in Trimurti Residency?
A median of ₹5,445 per square foot of carpet, across 7 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Trimurti Residency?
4 of 22 were still unsold at the promoter's last filing, in 1 BHK, from 446–468 sq ft of carpet.
Are there complaints against Trimurti Residency?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Trimurti Residency?
Trimurti Construction And Developers, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100049533 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Chikhali

Stock image, not a photograph of Sai Aashiyana Stock image
Registered here
₹6,808
On offer
1, 2 BHK + 1 RK
Under construction

Sai Aashiyana

Ssd Erectors · Chikhali

93 sold
Due
Dec 2026
Units
180
Carpet
233–658
Sold at
₹41.8 lakh
P52100046123
Stock image, not a photograph of Sai Suvarna Stock image
Registered here
₹9,010
On offer
1, 2 BHK
Under construction

Sai Suvarna

Shree Sai Buildcon · Chikhali

3 sold
Slipped 1.8 years
Due
Apr 2030
Units
108
Carpet
351–529
Sold at
₹32.1 lakh
PR1260002502520