RERA registered P52100079359 Active
Parshwa Palazzo
Chikhali, Pune · Residential / Group Housing by Jp Realtors
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Parshwa Palazzo in Chikhali is MahaRERA-registered (P52100079359) and still under construction, with possession filed for December 2028. Buyers have already registered 23 sales here at a median ₹6,981 per sq ft of carpet — not an asking price. Jp Realtors is the promoter.
- Sold here at
- ₹6,981
- per sq ft, 23 registered sales
- Available
- 2, 3 BHK
- 26 left · 643–983 sq ft
- Possession
- Dec 2028
- as filed with MahaRERA
Where this is
Chikhali, PCMC, Pune, 411062
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 49 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 24 units · 3 available
3 BHK 25 units · 23 available
13 / 49
27% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 24 flats · 3 available
643 sq ft carpet as drawn
- Carpet, filed
- 643 sq ft
- Built-up
- about 772 sq ft
- Super built-up
- about 900 sq ft
Every room in this flat
Living and dining about 187 sq ft, Master bedroom about 125 sq ft, Second bedroom about 100 sq ft, Kitchen about 75 sq ft, Bath about 44 sq ft, Balcony about 44 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.
3 BHK 25 flats · 23 available
983 sq ft carpet as drawn, from 753–983 sq ft filed in this configuration
- Carpet, filed
- 983 sq ft
- Built-up
- about 1,180 sq ft
- Super built-up
- about 1,376 sq ft
Every room in this flat
Living and dining about 242 sq ft, Master bedroom about 161 sq ft, Second bedroom about 129 sq ft, Third bedroom about 105 sq ft, Kitchen about 97 sq ft, Bath about 56 sq ft, Balcony about 56 sq ft, Second bath about 48 sq ft, Passage about 48 sq ft, Third bath about 40 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹6,841 to ₹8,326 per sq ft |
|---|---|
| Sold and booked | 23 sold, 0 booked |
| Still available | 26 flats, 643–983 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Chikhali |
|---|---|
| Taluka | Haveli |
| Street, as filed | CHIKHALI |
| Bounded north by | BY PROPERTY OF GAT NOS 105 106 AND 107 |
| Bounded east by | BY GAT NO 129 |
| Bounded south by | BY 12 MTR ROAD |
| Bounded west by | BY REMAINING LAND OUT OF GAT NO 128 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Jp Realtors |
|---|---|
| Registered office | Sr. No. 1138 Flat No. 3, Vijay Bunglow, Hirabag Road, Shukrawar Peth, Pune 411002 |
Professionals named on the filing
| Architect | Arcon Associates CA/2010/48607 |
|---|---|
| Engineer | Datta Kadam |
| Engineer | Navnath Rambhau Zine |
| Engineer | Rahul Kapse & Associates PCMC/STE/0018 |
| Engineer | Sangram Kalse |
| Chartered Accountant | Nitish Vaidya & Associates 631350 |
| Chartered Accountant | Pgmj & Associates 134039 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Legal Title Final.pdf | 1 February 2025 |
|---|---|
| Promoter's declaration, Form B FORM B.pdf | 29 January 2025 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100079359 |
| Promoter | Jp Realtors |
| Project type | Residential / Group Housing · Building development |
| Locality | Chikhali — Haveli taluka, pincode 411062 |
| Applied on | 01 February 2025 |
| Registered on | 28 February 2025 |
| Completion, as first filed | 31 December 2028 |
| Due | 31 December 2028 |
| Units declared | 49 |
| Units sold | 13 of 49 sold (27%), 36 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 28 February 2025 |
| Application reference | REA52100167701 |
| Current status | Active |
| Record last changed | 26 September 2025 · 12 months ago |
Where the sold count comes from, and whether it holds up. 13 of 49 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 13 of 49 sold, leaving 36. The unit-by-unit list they file separately covers 49 flats and marks 23 sold with 26 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 26 September 2025.
Common questions
- Is Parshwa Palazzo registered with MahaRERA?
- Yes. It is registered as P52100079359, filed on 28 February 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Parshwa Palazzo due to be handed over?
- The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Parshwa Palazzo been delayed?
- No. December 2028 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Parshwa Palazzo?
- A median of ₹6,981 per square foot of carpet, across 23 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Parshwa Palazzo?
- 26 of 49 were still unsold at the promoter's last filing, in 2, 3 BHK, from 643–983 sq ft of carpet.
- Are there complaints against Parshwa Palazzo?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Parshwa Palazzo?
- Jp Realtors, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100079359 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Chikhali
Stock image
- Registered here
- ₹6,808
- On offer
- 1, 2 BHK + 1 RK
- Due
- Dec 2026
- Units
- 180
- Carpet
- 233–658
- Sold at
- ₹41.8 lakh
Stock image
- Registered here
- ₹9,010
- On offer
- 1, 2 BHK
- Due
- Apr 2030
- Units
- 108
- Carpet
- 351–529
- Sold at
- ₹32.1 lakh
Stock image
- Due
- Apr 2028
- Units
- —
- Carpet
- —
- Typical unit
- —