Z Zomefy

RERA registered P52100055473 Active

Krystal One Phase IV

Chikhali, Pune · Residential / Group Housing by Rama Spaces

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Krystal One Phase IV in Chikhali is MahaRERA-registered (P52100055473) and still under construction, with possession filed for April 2028. Buyers have already registered 201 sales here at a median ₹7,066 per sq ft of carpet — not an asking price. About 91% of the 222 units are sold. 1 complaint sits on the filing. Rama Spaces is the promoter.

Stock image, not a photograph of Krystal One Phase IV Stock image
Where
Chikhali
pincode 411062
Sold here at
₹7,066
per sq ft, 201 registered sales
Available
2 BHK
21 left · 581–584 sq ft
Now due
Apr 2028
4 months later than first promised
A stock photograph, not Krystal One Phase IV. We have no picture of this site yet.

Where this is

Chikhali, PCMC, Pune, 411062

Village
Chikhali
Taluka
Haveli
Pincode
411062
Coordinates
18.684204, 73.834586

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 222 flats are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 4 units · all sold

4 units 476 sq ft 44.22 sq m as filed

2 BHK 218 units · 21 available

2 units 479 sq ft 44.54 sq m as filed
2 units 481 sq ft 44.73 sq m as filed
28 units 581 sq ft 53.97 sq m as filed
56 units 582 sq ft 54.03–54.04 sq m as filed
14 units 584 sq ft 54.27 sq m as filed
12 units 635 sq ft 58.99 sq m as filed
38 units 636 sq ft 59.04–59.08 sq m as filed
40 units 637 sq ft 59.16–59.19 sq m as filed
13 units 673 sq ft 62.53 sq m as filed
13 units 674 sq ft 62.61 sq m as filed
Units sold

201 / 222

Nearly sold out

91% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 4 flats · none available

476 sq ft carpet as drawn

Carpet, filed
476 sq ft
Built-up
about 571 sq ft
Super built-up
about 666 sq ft
Every room in this flat

Living and dining about 178 sq ft, Master bedroom about 119 sq ft, Kitchen about 71 sq ft, Bath about 42 sq ft, Balcony about 42 sq ft, Passage about 24 sq ft.

2 BHK 218 flats · 21 available

582 sq ft carpet as drawn, from 479–674 sq ft filed in this configuration

Carpet, filed
582 sq ft
Built-up
about 698 sq ft
Super built-up
about 815 sq ft
Every room in this flat

Living and dining about 170 sq ft, Master bedroom about 113 sq ft, Second bedroom about 90 sq ft, Kitchen about 68 sq ft, Bath about 40 sq ft, Balcony about 40 sq ft, Second bath about 34 sq ft, Passage about 28 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹7,066 per sq ft of carpet, median of 201 registered sales
Range across those sales ₹6,647 to ₹9,388 per sq ft
Sold and booked 195 sold, 6 booked
Still available 21 flats, 476–674 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2027
Current status Due Apr 2028

Revised projection

The completion date has moved from December 2027 to April 2028, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Plot No. B, Gat No.96 (P) and Gat No.97 (P) is the plot this project is built on, as filed
Revenue village Chikhali
TalukaHaveli
Street, as filed Adjacent to Dehu- Alandi Road
Bounded north by Gat No 94 P
Bounded east by Part of future Phase to the East
Bounded south by Open space of Krystal One to the South
Bounded west by Part of Phase 3 - D Wing to the West

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerRama Spaces
Registered office10th Floor, Rama Equator, Morwadi - Ajmera Road, Near City International School, Morwadi, Pimpri, Pune 411018

Professionals named on the filing

Architect Landmark Design Group CA/90/13423
Engineer Akshay Nigade EN16-32269
Engineer Deepak Sansare
Chartered Accountant L. B. Laddha & Co 010550
Chartered Accountant Madhusudan Jhanwar 121450

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 0 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12605102 Aug 2026 No order on record

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

29 January 2024 is when an advocate last certified the title to this land
Title report Title and Search report_compressed.pdf 29 January 2024 2 older versions on file
Promoter's declaration, Form B Form - B_compressed.pdf 2 February 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100055473
Promoter Rama Spaces
Project typeResidential / Group Housing · Building development
LocalityChikhali — Haveli taluka, pincode 411062
Applied on02 February 2024
Registered on02 April 2024
Completion, as first filed31 December 2027
Due30 April 2028 4 months later
Units declared222
Units sold 201 of 222 sold (91%), 21 still unsold
Complaints1 on record with MahaRERA
Certificate on file Original registration certificate, issued 02 April 2024
Application referenceREA52100152935
Current statusActive
Record last changed 12 August 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 201 of 222 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 222 flats and reaches the same answer — 195 sold, every one with money recorded as received against a named flat, 6 booked with a price agreed but nothing received yet, and 21 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 12 August 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Krystal One Phase IV registered with MahaRERA?
Yes. It is registered as P52100055473, filed on 02 April 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Krystal One Phase IV due to be handed over?
The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Krystal One Phase IV been delayed?
Yes. The first date filed was December 2027. It now stands at April 2028, 4 months later.
What did buyers actually pay in Krystal One Phase IV?
A median of ₹7,066 per square foot of carpet, across 201 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Krystal One Phase IV?
21 of 222 were still unsold at the promoter's last filing, in 2 BHK, from 581–584 sq ft of carpet.
Are there complaints against Krystal One Phase IV?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Krystal One Phase IV?
Rama Spaces, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100055473 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Chikhali

Stock image, not a photograph of DLC Kashi Nagri Stock image
Registered here
₹7,174
On offer
2 BHK + shops
Under construction

DLC Kashi Nagri

Aadhar Mangalam Buildcorp LLP · Chikhali

16 sold
Due
Jun 2028
Units
93
Carpet
265–603
Sold at
₹41 lakh
P52100077848