RERA registered PM1260002601747 Active
C3 Chandani Chowk Central
Bavdhan Khurd, Pune · Mixed by Aarambh Developers
Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.
In short
C3 Chandani Chowk Central in Bavdhan Khurd is MahaRERA-registered (PM1260002601747) and still under construction, with possession filed for December 2029. No sales are registered in this project yet. Units the same size elsewhere in Bavdhan Khurd have registered at ₹5,044 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Aarambh Developers is the promoter.
- Nearby at
- ₹5,044
- per sq ft, same sizes in Bavdhan Khurd
- Available
- 1 BHK, Duplex
- 4 left · 450–2,383 sq ft
- Possession
- Dec 2029
- as filed with MahaRERA
Where this is
Bavdhan Khurd, PMC, Pune, 411021
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 6 units are filed unit by unit with the authority, the highest on floor 3. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 2 units · all available
Duplex 2 units · all available
Office Space 2 units · not for sale
0 / 6
0% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 2 units · 2 available
450 sq ft carpet as drawn, from 450–455 sq ft filed in this configuration
- Carpet, filed
- 450 sq ft
- Built-up
- about 540 sq ft
- Super built-up
- about 630 sq ft
Every room in this unit
Living and dining about 169 sq ft, Master bedroom about 112 sq ft, Kitchen about 68 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Passage about 22 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What units like these cost nearby
No sale has been registered at C3 Chandani Chowk Central yet. The promoter has filed no agreement values, so nothing below is this project's own price.
| On sale here | Registered in Bavdhan Khurd | Which for this size is |
|---|---|---|
| 1 BHK 450–455 sq ft | ₹5,044/sq ft 109 sales, 3 projects | ₹22.7 lakh–₹23 lakh middle half ₹4,989–5,107/sq ft |
Duplex is also on sale here, and Bavdhan Khurd has not registered enough sales of that to quote a rate for it.
Each rate is what buyers contracted to pay for the same configuration in Bavdhan Khurd, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Bavdhan Khurd.
The government's valuation of the unsold units
| On sale here | Carpet | Valued at no less than |
|---|---|---|
| 1 BHK 2 unsold | 450–455 sq ft | ₹34.4 lakh–₹34.8 lakh ₹7,638/sq ft |
| Duplex 2 unsold | 2,218–2,383 sq ft | ₹2.2 crore–₹2.3 crore ₹9,729/sq ft |
This is the Annual Statement of Rates value the promoter filed against each unsold unit — the state's valuation, not an asking price and not a discount. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Bavdhan Khurd |
|---|---|
| Taluka | Mulshi |
| Street, as filed | CTS No. 20 Hissa No. 4/3 Chandani Chowk |
| Bounded north by | DP Road to Pashan Lake |
| Bounded east by | Hotel Viva Inn |
| Bounded south by | National Highway |
| Bounded west by | DP Road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Aarambh Developers |
|---|---|
| Registered office | Flat No 4, 2nd Floor, Sneh Avenue, Bhonde Colony, Prabhat Road, Erandwane, Pune 411004 |
Professionals named on the filing
| Chartered Accountant | Nikhil Patankar & Associates 135981 |
|---|
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Revised merged Title Report with Supplementary.pdf | 27 August 2026 1 older version on file |
|---|---|
| Conveyance deed 7-12 extract of the property.pdf | 14 July 2026 |
| Promoter's declaration, Form B Form B - Aarambh Developer - C3.pdf | 27 August 2026 |
| Annexure A declaration Annexure A_Declaration cum Undertaking.pdf | 29 April 2026 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PM1260002601747 |
| Promoter | Aarambh Developers |
| Project type | Mixed · Building development |
| Locality | Bavdhan Khurd — Mulshi taluka, pincode 411021 |
| Applied on | 12 May 2026 |
| Registered on | 02 September 2026 |
| Completion, as first filed | 31 December 2029 |
| Due | 31 December 2029 |
| Units declared | 6 |
| Units sold | None sold yet, all 6 on the market |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 02 September 2026 |
| Application reference | ACK29042600571 |
| Current status | Active |
| Record last changed | 02 September 2026 · 22 days ago |
Nothing has sold yet. The promoter's quarterly progress report says none of the 6 units are gone, and the unit-by-unit list they file separately says the same: all 6 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 02 September 2026.
Common questions
- Is C3 Chandani Chowk Central registered with MahaRERA?
- Yes. It is registered as PM1260002601747, filed on 02 September 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is C3 Chandani Chowk Central due to be handed over?
- The promoter has told MahaRERA December 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has C3 Chandani Chowk Central been delayed?
- No. December 2029 is the date first filed with the authority and it has not moved since.
- What does a unit in C3 Chandani Chowk Central cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Bavdhan Khurd have registered at ₹5,044 per square foot of carpet — the neighbourhood, not this building.
- How many units are left in C3 Chandani Chowk Central?
- 4 of 6 were still unsold at the promoter's last filing, in 1 BHK + duplex, from 450–2,383 sq ft of carpet.
- Are there complaints against C3 Chandani Chowk Central?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building C3 Chandani Chowk Central?
- Aarambh Developers, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 24 September 2026. The authority's own page for PM1260002601747 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Bavdhan Khurd
Stock image
- Nearby
- ₹5,044–11,860
- On offer
- 1, 4 BHK
- Due
- Apr 2030
- Units
- 4
- Carpet
- 725–2,210
- Typical flat
- ~₹1.9 crore
Stock image
- Registered here
- ₹11,126
- On offer
- 1, 2, 3, 4 BHK
2 complaints
- Due
- Jul 2029
- Units
- 457
- Carpet
- 660–1,469
- Sold at
- ₹1 crore
Stock image
- Registered here
- ₹9,089
- Due
- Apr 2028
- Units
- 12
- Carpet
- 1,692
- Sold at
- ₹1.5 crore