Yadgar Shine Building D

Baramati, Pune · Residential / Group Housing by Yadgar Builders.

Official record Updated from the register 30 October 2026. Anything filed since then is not here yet.

In short

Yadgar Shine Building D in Baramati is MahaRERA-registered (PR1260002602488) and still under construction, with possession filed for December 2029. No sales are registered in this project yet. Units the same size elsewhere in Baramati have registered at ₹3,501–3,633 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Yadgar Builders. is the promoter.

Stock image, not a photograph of Yadgar Shine Building D Stock image
Where
Baramati
pincode 413102
Nearby at
₹3,501–3,633
per sq ft, same sizes in Baramati
Available
1, 2 BHK
56 left · 512–679 sq ft
Possession
Dec 2029
as filed with MahaRERA
A stock photograph, not Yadgar Shine Building D. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Baramati (M Cl) · Baramati

Baramati, Pune, 413102

Village Baramati (M Cl)
Taluka Baramati
Pincode 413102
Promoter Pin Coordinates 18.169726, 74.575620

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 56 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
56 Total Licenced Units
Dominant Typology • 50.0% of tower

1 BHK Residences

28 Available 28 registered total
Estimated Market Window ₹18.3 lakh
Locality Benchmark ₹3,567 / sq ft
Carpet Variations as Filed Span: 512 sq ft
512 sq ft 47.6 sq m 28 units
Govt ASR Base: ₹13.1 lakh 28 of 28 available
Dominant Typology • 50.0% of tower

2 BHK Residences

28 Available 28 registered total
Estimated Market Window ₹24.2 lakh
Locality Benchmark ₹3,567 / sq ft
Carpet Variations as Filed Span: 679 sq ft
679 sq ft 63.1 sq m 28 units
Govt ASR Base: ₹17.4 lakh 28 of 28 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
1 BHK 512 sq ft (47.6 sq m) ~614 sq ft ~717 sq ft 28 left of 28
2 BHK 679 sq ft (63.1 sq m) ~815 sq ft ~951 sq ft 28 left of 28
Units sold

0 / 56

Pre-launch / early phase

0% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 28 flats · 28 available

512 sq ft carpet as drawn

Carpet, filed
512 sq ft
Built-up
about 614 sq ft
Super built-up
about 717 sq ft
Every room in this flat

Living and dining about 192 sq ft, Master bedroom about 128 sq ft, Kitchen about 77 sq ft, Bath about 45 sq ft, Balcony about 45 sq ft, Passage about 26 sq ft.

2 BHK 28 flats · 28 available

679 sq ft carpet as drawn

Carpet, filed
679 sq ft
Built-up
about 815 sq ft
Super built-up
about 951 sq ft
Every room in this flat

Living and dining about 198 sq ft, Master bedroom about 132 sq ft, Second bedroom about 105 sq ft, Kitchen about 79 sq ft, Bath about 46 sq ft, Balcony about 46 sq ft, Second bath about 40 sq ft, Passage about 33 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What flats like these cost nearby

No sale has been registered at Yadgar Shine Building D yet. The promoter has filed no agreement values, so nothing below is this project's own price.

Independent Market Intelligence

Registered Agreement Rates in Baramati

Based on 486 government-stamped sale deeds registered for identical carpet bands across nearby developments.

1 BHK 512 sq ft
₹3,633 / sq ft

64 registered sale agreements across 13 nearby developments.

Estimated Unit Market Window ₹18.6 lakh
Middle Half (IQR) ₹2,972 – ₹4,239 / sq ft
25th percentile: ₹2,972 75th percentile: ₹4,239
2 BHK 679 sq ft
₹3,501 / sq ft

422 registered sale agreements across 41 nearby developments.

Estimated Unit Market Window ₹23.8 lakh
Middle Half (IQR) ₹3,102 – ₹4,157 / sq ft
25th percentile: ₹3,102 75th percentile: ₹4,157

Each rate is what buyers contracted to pay for the same configuration in Baramati, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Baramati.

The state values these at ₹2,559 per sq ft of carpet — one rate across all 56 still available, which puts the smallest at ₹13.1 lakh and the largest at ₹17.4 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State On Scheduled Baseline
Original Baseline
Dec 2029
Declared at registration
Current Statutory Date
Due
Dec 2029
Identical to original baseline

Stable delivery projection

Stable project schedule. Zero slippage or revision requests reported since initial registration. Construction is recorded against the original baseline date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Gut No. 17/1/A is the plot this project is built on, as filed
Revenue village Baramati (M Cl) · shown on this site as Baramati
TalukaBaramati
Plot No.6,9,10
Road or street, as filed9.00
Society.
Street, as filed plot_no 6,9,10 city_survey_gut_no 17/1/A
Bounded north by survey no 18
Bounded east by survey no 17/2 and 17/3A
Bounded south by survey no 17/1/survey no 17B
Bounded west by survey no 11

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerYadgar Builders.
Registered officeSurvey Number 171/A, Yadgar City, Jannat Manzil, Baramati, Harikrupa Nagar, Pune 413102

Professionals named on the filing

Architect Architect and interior designer COA/11/52317
Chartered Accountant Butala Trivedi & Associates LLP 173355

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

18 October 2026 is when an advocate last certified the title to this land
Title report Legal Title Report with surch .pdf 18 October 2026
Conveyance deed ilovepdf_merged (1).pdf 16 October 2026 1 older version on file
Promoter's declaration, Form B Rera document.pdf 16 October 2026
Annexure A declaration Annexure A.pdf 17 October 2026

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1260002602488
Promoter Yadgar Builders.
Project typeResidential / Group Housing · Building development
LocalityBaramati — Baramati taluka, pincode 413102
Applied on18 October 2026
Registered on21 October 2026
Completion, as first filed31 December 2029
Due31 December 2029
Units declared56
Units sold None sold yet, all 56 on the market
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 21 October 2026
Application referenceACK16102603886
Current statusActive
Record last changed 21 October 2026 · 10 days ago

Nothing has sold yet. The promoter's quarterly progress report says none of the 56 flats are gone, and the unit-by-unit list they file separately says the same: all 56 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 21 October 2026.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Yadgar Shine Building D registered with MahaRERA?
Yes. It is registered as PR1260002602488, filed on 21 October 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Yadgar Shine Building D due to be handed over?
The promoter has told MahaRERA December 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Yadgar Shine Building D been delayed?
No. December 2029 is the date first filed with the authority and it has not moved since.
What does a flat in Yadgar Shine Building D cost?
Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Baramati have registered at ₹3,501–3,633 per square foot of carpet — the neighbourhood, not this building.
How many flats are left in Yadgar Shine Building D?
56 of 56 were still unsold at the promoter's last filing, in 1, 2 BHK, from 512–679 sq ft of carpet.
Are there complaints against Yadgar Shine Building D?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Yadgar Shine Building D?
Yadgar Builders., as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 30 October 2026. The authority's own registry page for PR1260002602488 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Baramati

Stock image, not a photograph of Yashoda Pride Stock image
Nearby
₹3,501
On offer
2 BHK
Under construction

Yashoda Pride

Vijay Eknath Kalange · Baramati

18 sold
Slipped 4 months
Due
May 2027
Units
28
Carpet
195–1,112
Sold at
₹30 lakh
P52100053940