Om Raj Paradise

Baramati, Pune · Others by S And K Construction

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Om Raj Paradise in Baramati is MahaRERA-registered (P52100079617) and still under construction, with possession filed for July 2027. No sales are registered in this project yet. Units the same size elsewhere in Baramati have registered at ₹4,667 per sq ft of carpet — the neighbourhood, not this building. About 8% of the 13 units are sold. S And K Construction is the promoter.

Stock image, not a photograph of Om Raj Paradise Stock image
Where
Baramati
pincode 413102
Nearby at
₹4,667
per sq ft, same sizes in Baramati
Available
3 BHK, Shops
12 left · 110–1,617 sq ft
Now due
Jul 2027
4 months later than first promised
A stock photograph, not Om Raj Paradise. We have no picture of this site yet.

Where this is

Baramati, Pune, 413102

Street map of Baramati centred on the coordinate filed for Om Raj Paradise, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Baramati (M Cl)
Taluka
Baramati
Pincode
413102
Coordinates
18.154276, 74.582487

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 13 units are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

3 BHK 10 units · 9 available

2 units 800 sq ft 74.34 sq m as filed
4 units 886 sq ft 82.34 sq m as filed
2 units 936 sq ft 86.92 sq m as filed
1 unit 1539 sq ft 142.96 sq m as filed
1 unit 1617 sq ft 150.24 sq m as filed

Shops 3 units · all available

1 unit 110 sq ft 10.18 sq m as filed
2 units 288 sq ft 26.74–26.75 sq m as filed
Units sold

1 / 13

Early sales

8% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

3 BHK 10 units · 9 available

886 sq ft carpet as drawn, from 800–1,617 sq ft filed in this configuration

Carpet, filed
886 sq ft
Built-up
about 1,063 sq ft
Super built-up
about 1,240 sq ft
Every room in this unit

Living and dining about 218 sq ft, Master bedroom about 145 sq ft, Second bedroom about 116 sq ft, Third bedroom about 94 sq ft, Kitchen about 87 sq ft, Bath about 51 sq ft, Balcony about 51 sq ft, Second bath about 44 sq ft, Passage about 44 sq ft, Third bath about 36 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What units like these cost nearby

No sale has been registered at Om Raj Paradise yet. 1 agreement has been filed, which is too few to divide into a rate anyone should act on.

₹4,667 per sq ft of carpet, median of 66 registered sales of the same configuration in Baramati
On sale here Registered in Baramati Which for this size is
3 BHK 800–1,617 sq ft ₹4,667/sq ft 66 sales, 12 projects ₹37.3 lakh–₹75.5 lakh middle half ₹3,499–5,037/sq ft

Shops is also on sale here, and Baramati has not registered enough sales of that to quote a rate for it.

Each rate is what buyers contracted to pay for the same configuration in Baramati, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Baramati.

The government's valuation of the unsold units

On sale here Carpet Valued at no less than
3 BHK 9 unsold 800–1,617 sq ft ₹28 lakh–₹56.6 lakh ₹3,499/sq ft
Shops 3 unsold 110–288 sq ft ₹4.4 lakh–₹11.5 lakh ₹3,999/sq ft

This is the Annual Statement of Rates value the promoter filed against each unsold unit — the state's valuation, not an asking price and not a discount. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Timeline audit

Original proposed Mar 2027
Current status Due Jul 2027

Revised projection

The completion date has moved from March 2027 to July 2027, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

C.T.S NO. 858/A6 is the plot this project is built on, as filed
Revenue village Baramati (M Cl) · shown on this site as Baramati
TalukaBaramati
Street, as filed C.T.S NO 858/A6
Bounded north by Road
Bounded east by CTS No 858 A7
Bounded south by Part ofSurvey No 280
Bounded west by CTS No 858 A5

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerS And K Construction
Registered officeGroung Floor, ,, Bajar Peth, Nira Baramati Road, Near Abhayananda Hospital, Vadgao Nimbalkar, Pune 412103

Professionals named on the filing

Architect Gopal Suthar COA/11/52317
Engineer Vikas Gawade 038/CE3S/S0499/905360/96081303
Chartered Accountant Akshay Kadam 182482
Chartered Accountant CA Dnyaneshwar Shelar 176545

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

14 February 2025 is when an advocate last certified the title to this land
Title report Legal title Report Form A.pdf 14 February 2025
Promoter's declaration, Form B Form B Signed Final.pdf 28 February 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100079617
Promoter S And K Construction
Project typeOthers · Building development
LocalityBaramati — Baramati taluka, pincode 413102
Applied on24 February 2025
Registered on17 March 2025
Completion, as first filed31 March 2027
Due31 July 2027 4 months later
Units declared13
Units sold 1 of 13 sold (8%), 12 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 17 March 2025
Application referenceREA52100167982
Current statusActive
Record last changed 17 March 2025 · 18 months ago

Where the sold count comes from, and whether it holds up. 1 of 13 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 13 units and reaches the same answer — 1 sold, every one with money recorded as received against a named unit, and 12 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 17 March 2025.

Common questions

Is Om Raj Paradise registered with MahaRERA?
Yes. It is registered as P52100079617, filed on 17 March 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Om Raj Paradise due to be handed over?
The promoter has told MahaRERA July 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Om Raj Paradise been delayed?
Yes. The first date filed was March 2027. It now stands at July 2027, 4 months later.
What does a unit in Om Raj Paradise cost?
Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Baramati have registered at ₹4,667 per square foot of carpet — the neighbourhood, not this building.
How many units are left in Om Raj Paradise?
12 of 13 were still unsold at the promoter's last filing, in 3 BHK + shops, from 110–1,617 sq ft of carpet.
Are there complaints against Om Raj Paradise?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Om Raj Paradise?
S And K Construction, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100079617 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Baramati