Z Zomefy

RERA registered PR1261012400049 Active

Pune Baner Project-Tower 4 and 5

Baner, Pune · Residential / Group Housing by Goel Ganga Ventures India Private Limited

Official record Updated from the register 23 October 2026. Anything filed since then is not here yet.

In short

Pune Baner Project-Tower 4 and 5 in Baner is MahaRERA-registered (PR1261012400049) and still under construction, with possession filed for June 2030. Buyers have already registered 246 sales here at a median ₹19,047 per sq ft of carpet — not an asking price. 2 complaints sit on the filing. Goel Ganga Ventures India Private Limited is the promoter.

Stock image, not a photograph of Pune Baner Project-Tower 4 and 5 Stock image
Where
Baner
pincode 411038
Sold here at
₹19,047
per sq ft, 246 registered sales
Available
24 flats
24 left · 1,375–3,372 sq ft
Now due
Jun 2030
a year later than first promised
A stock photograph, not Pune Baner Project-Tower 4 and 5. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Baner · Haveli

Baner, PMC, Pune, 411038

Village Baner
Taluka Haveli
Pincode 411038
Promoter Pin Coordinates 18.552221, 73.779745

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 270 flats are filed unit by unit with the authority, the highest on floor 34. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
270 Total Licenced Units
Residential Typology • 100.0% of tower

Other Residences

24 Available 270 registered total
Estimated Market Window ₹2.6 crore – ₹7.9 crore
Locality Benchmark ₹19,047 / sq ft
Carpet Variations as Filed Span: 1375 to 4131 sq ft
1375 sq ft 127.75 sq m 2 units
1548 sq ft 143.78 sq m 125 units
1561 sq ft 144.99 sq m 12 units
1699 sq ft 157.81 sq m 2 units
1776 sq ft 165.0 sq m 2 units
1871 sq ft 173.85 sq m 24 units
1872 sq ft 173.91 sq m 90 units
2987 sq ft 277.5 sq m 1 unit
3086 sq ft 286.7 sq m 1 unit
3372 sq ft 313.31 sq m 2 units
3373 sq ft 313.36 sq m 2 units
3427 sq ft 318.38 sq m 1 unit
3673 sq ft 341.25 sq m 2 units
4131 sq ft 383.74 sq m 4 units
Govt ASR Base: ₹1.1 crore – ₹2.7 crore 24 of 270 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
Other 1375 – 4131 sq ft (127.75 – 383.78 sq m) ~1650 – 4957 sq ft ~1925 – 5783 sq ft 24 left of 270
Units sold

244 / 270

Nearly sold out

90% absorption rate · the promoter's two filings disagree

What buyers actually paid

₹19,047 per sq ft of carpet, median of 246 registered sales
Range across those sales ₹14,205 to ₹27,850 per sq ft
Sold and booked 228 sold, 18 booked
Still available 24 flats, 1375–4131 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State Revised (+a year)
Original Baseline
Jun 2029
Declared at registration
Current Statutory Date
Due
Jun 2030
a year later than filed

Revised delivery projection

The completion date has moved from June 2029 to June 2030, a year later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

17/2A/46 Part to 17/2A/50 Part,17/2A/56 Part to 17/2A/58 Part,17/2A/59 to 17/2A/61,17/2A/64,17/2A/65,17/2A/66 Part is the plot this project is built on, as filed
Revenue village Baner
TalukaHaveli
Street, as filed BANER
Bounded north by Open Space
Bounded east by 1 Resi
Bounded south by Tower 3
Bounded west by DP Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerGoel Ganga Ventures India Private Limited
Registered officeFm Office, Lodha Belmondo, Mawal, Vadagaon, Gahunje, Pune 412106

Professionals named on the filing

Architect Pradeep Kamble CA/87/10471
Architect Vilas Desai & Associates CA/2008/43203
Engineer K C Shah Designs LLP STR/S/270 & STR/840025361
Engineer Pravakar Sahoo NA
Engineer Pravin Patil NA
Chartered Accountant Chirag Sarvaiya 128378
Chartered Accountant M S K A & Associates 105047

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

2 cases against this project, 2 with an order on record, filed between Nov 2025 and Jan 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12600268 Jan 2026 Order passed Jan 2026
CC12504078 Nov 2025 Order passed Nov 2025

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

21 September 2024 is when an advocate last certified the title to this land
Title report Legal Report on Title-Baner Land, Pune.pdf 21 September 2024
Promoter's declaration, Form B Goel Ganga Form 3.pdf 25 September 2024
Disclosure of secured and unsecured loans Disclosure finance avail.pdf 27 September 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1261012400049
Promoter Goel Ganga Ventures India Private Limited
Project typeResidential / Group Housing · Building development
LocalityBaner — Haveli taluka, pincode 411038
Applied on27 September 2024
Registered on03 October 2024
Completion, as first filed30 June 2029
Due29 June 2030 a year later
Units declared270
Units sold 244 of 270 sold (90%), 26 still unsoldfilings disagree
Complaints2 on record with MahaRERA
Certificate on file Extension certificate, issued 21 August 2026
Application referenceACK17092401087
Current statusActive
Record last changed 03 July 2026 · 4 months ago

Where the sold count comes from, and whether it holds up. 244 of 270 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 244 of 270 sold, leaving 26. The unit-by-unit list they file separately covers 270 flats and marks 228 sold with 24 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 03 July 2026.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Pune Baner Project-Tower 4 and 5 registered with MahaRERA?
Yes. It is registered as PR1261012400049, filed on 03 October 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Pune Baner Project-Tower 4 and 5 due to be handed over?
The promoter has told MahaRERA June 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Pune Baner Project-Tower 4 and 5 been delayed?
Yes. The first date filed was June 2029. It now stands at June 2030, a year later.
What did buyers actually pay in Pune Baner Project-Tower 4 and 5?
A median of ₹19,047 per square foot of carpet, across 246 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Pune Baner Project-Tower 4 and 5?
24 of 270 were still unsold at the promoter's last filing, from 1,375–3,372 sq ft of carpet.
Are there complaints against Pune Baner Project-Tower 4 and 5?
2 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Pune Baner Project-Tower 4 and 5?
Goel Ganga Ventures India Private Limited, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 23 October 2026. The authority's own registry page for PR1261012400049 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Baner

Stock image, not a photograph of 34 Western Pavillion Stock image
Registered here
₹10,968
On offer
Offices
Overdue

34 Western Pavillion

Blue Pearl Promoters And Developers · Baner

74 sold
Slipped 2.4 years
Was due
Sep 2026
Units
53
Carpet
217–409
Sold at
₹43.7 lakh
P52100027431