Pinewood Phase II
Baner, Pune · Residential / Group Housing by Sainath Buildcon
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Pinewood Phase II in Baner is MahaRERA-registered (P52100055098) and still under construction, with possession filed for December 2027. Buyers have already registered 38 sales here at a median ₹9,500 per sq ft of carpet — not an asking price. Sainath Buildcon is the promoter.
- Sold here at
- ₹9,500
- per sq ft, 38 registered sales
- Available
- 2, 3 BHK
- 60 left · 351–1,358 sq ft
- Possession
- Dec 2027
- as filed with MahaRERA
Where this is
Baner, PMC, Pune, 411045
The promoter filed a coordinate that falls outside Pune district, so it is not used here. The link above searches Maps by name and locality instead.
Flat sizes on file
All 98 flats are filed unit by unit with the authority, the highest on floor 13. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 2 units · all sold
2 BHK 70 units · 56 available
3 BHK 26 units · 4 available
35 / 98
36% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 2 flats · none available
351 sq ft carpet as drawn
- Carpet, filed
- 351 sq ft
- Built-up
- about 421 sq ft
- Super built-up
- about 491 sq ft
Every room in this flat
Living and dining about 132 sq ft, Master bedroom about 88 sq ft, Kitchen about 53 sq ft, Bath about 31 sq ft, Balcony about 31 sq ft, Passage about 18 sq ft.
2 BHK 70 flats · 56 available
928 sq ft carpet as drawn, from 351–928 sq ft filed in this configuration
- Carpet, filed
- 928 sq ft
- Built-up
- about 1,114 sq ft
- Super built-up
- about 1,299 sq ft
Every room in this flat
Living and dining about 270 sq ft, Master bedroom about 180 sq ft, Second bedroom about 144 sq ft, Kitchen about 108 sq ft, Bath about 63 sq ft, Balcony about 63 sq ft, Second bath about 54 sq ft, Passage about 45 sq ft.
3 BHK 26 flats · 4 available
1,358 sq ft carpet as drawn, from 1,237–1,358 sq ft filed in this configuration
- Carpet, filed
- 1,358 sq ft
- Built-up
- about 1,630 sq ft
- Super built-up
- about 1,901 sq ft
Every room in this flat
Living and dining about 334 sq ft, Master bedroom about 223 sq ft, Second bedroom about 178 sq ft, Third bedroom about 145 sq ft, Kitchen about 134 sq ft, Bath about 78 sq ft, Balcony about 78 sq ft, Second bath about 67 sq ft, Passage about 67 sq ft, Third bath about 56 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹4,264 to ₹21,892 per sq ft |
|---|---|
| Sold and booked | 35 sold, 3 booked |
| Still available | 60 flats, 351–1358 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pune (M Corp.) · shown on this site as Baner |
|---|---|
| Taluka | Pune City |
| Street, as filed | Baner |
| Bounded north by | S No 59 of village Baner |
| Bounded east by | SNo60 Alakriti Society |
| Bounded south by | Rohan Leher S No57part |
| Bounded west by | S No 57part |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Sainath Buildcon |
|---|---|
| Registered office | 2nd Floor, Cts No. 11/B/2, Padale Palace, Off Karve Road, Opp Hotel Nisarg, Erandwane, Pune 411004 |
Professionals named on the filing
| Architect | Mangesh Bhandekar CA/94/17553 |
|---|---|
| Engineer | Umesh Madhukar Inamdar |
| Chartered Accountant | Phule Wagh & Associates LLP 180704 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report final search upload 13022024.pdf | 13 February 2024 |
|---|---|
| Promoter's declaration, Form B Declaration of Form B.pdf | 30 November 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100055098 |
| Promoter | Sainath Buildcon |
| Project type | Residential / Group Housing · Building development |
| Locality | Baner — Pune City taluka, pincode 411045 |
| Applied on | 25 November 2023 |
| Registered on | 29 February 2024 |
| Completion, as first filed | 31 December 2027 |
| Due | 31 December 2027 |
| Units declared | 98 |
| Units sold | 35 of 98 sold (36%), 63 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 15 September 2026 |
| Application reference | REA52100149849 |
| Current status | Active |
| Record last changed | 20 May 2026 · 4 months ago |
Where the sold count comes from, and whether it holds up. 35 of 98 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 35 of 98 sold, leaving 63. The unit-by-unit list they file separately covers 98 flats and marks 35 sold with 60 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 20 May 2026.
Common questions
- Is Pinewood Phase II registered with MahaRERA?
- Yes. It is registered as P52100055098, filed on 29 February 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Pinewood Phase II due to be handed over?
- The promoter has told MahaRERA December 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Pinewood Phase II been delayed?
- No. December 2027 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Pinewood Phase II?
- A median of ₹9,500 per square foot of carpet, across 38 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Pinewood Phase II?
- 60 of 98 were still unsold at the promoter's last filing, in 2, 3 BHK, from 351–1,358 sq ft of carpet.
- Are there complaints against Pinewood Phase II?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Pinewood Phase II?
- Sainath Buildcon, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100055098 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Baner
Stock image
- Registered here
- ₹14,278
- On offer
- 2, 3 BHK
- Due
- Sep 2026
- Units
- 8
- Carpet
- 783–1,012
- Sold at
- ₹1.3 crore
Stock image
- Registered here
- ₹12,108
- On offer
- 3, 4 BHK
1 Presidential Sereno Building F
NOW Realty Promoters and Builders Private Limited · Baner
- Due
- Apr 2030
- Units
- 40
- Carpet
- 1,667–2,266
- Sold at
- ₹2.4 crore
Stock image
- Nearby
- ₹5,160
- On offer
- 1 BHK
- Due
- Mar 2029
- Units
- 84
- Carpet
- 219–305
- Typical flat
- ~₹15.7 lakh