Z Zomefy

RERA registered P52100055978 Active

Om Krushnay Namaha

Baner, Pune · Residential / Group Housing by Jagdish Universal Promoters

Official record Updated from the register 14 October 2026. Anything filed since then is not here yet.

In short

Om Krushnay Namaha in Baner is MahaRERA-registered (P52100055978) and still under construction, with possession filed for August 2027. Buyers have already registered 3 sales here at a median ₹10,562 per sq ft of carpet — not an asking price. About 50% of the 6 units are sold. Jagdish Universal Promoters is the promoter.

Stock image, not a photograph of Om Krushnay Namaha Stock image
Where
Baner
pincode 411045
Sold here at
₹10,562
per sq ft, 3 registered sales
Available
2 BHK
1 left · 919 sq ft
Now due
Aug 2027
4 months later than first promised
A stock photograph, not Om Krushnay Namaha. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Pune (M Corp.) · Pune City

Baner, PMC, Pune, 411045

Village Pune (M Corp.)
Taluka Pune City
Pincode 411045

The promoter filed a coordinate that falls outside Pune district, so it is not used here. The link above searches Maps by name and locality instead.

Flat sizes on file

All 6 flats are filed unit by unit with the authority, the highest on floor 3. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
6 Total Licenced Units
Residential Typology • 100.0% of tower

2 BHK Residences

1 Available 6 registered total
Estimated Market Window ₹96 lakh – ₹97.1 lakh
Locality Benchmark ₹10,562 / sq ft
Carpet Variations as Filed Span: 909 to 919 sq ft
909 sq ft 84.44 sq m 3 units
919 sq ft 85.38 sq m 3 units
Govt ASR Base: ₹96 lakh 1 of 6 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
2 BHK 909 – 919 sq ft (84.44 – 85.38 sq m) ~1091 – 1103 sq ft ~1273 – 1287 sq ft 1 left of 6
Units sold

3 / 6

Selling steadily

50% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 6 flats · 1 available

909 sq ft carpet as drawn, from 909–919 sq ft filed in this configuration

Carpet, filed
909 sq ft
Built-up
about 1,091 sq ft
Super built-up
about 1,273 sq ft
Every room in this flat

Living and dining about 265 sq ft, Master bedroom about 177 sq ft, Second bedroom about 141 sq ft, Kitchen about 106 sq ft, Bath about 62 sq ft, Balcony about 62 sq ft, Second bath about 53 sq ft, Passage about 44 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹10,562 per sq ft of carpet, median of 3 registered sales
Range across those sales ₹10,446 to ₹10,562 per sq ft
Sold and booked 3 sold, 0 booked
Still available 1 flat, 909–919 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State Revised (+4 months)
Original Baseline
Apr 2027
Declared at registration
Current Statutory Date
Due
Aug 2027
4 months later than filed

Revised delivery projection

The completion date has moved from April 2027 to August 2027, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Plot No D-1 S No 94/1P 95 96/1/1 96/1/2 96/2 96/3 96/4 97 is the plot this project is built on, as filed
Revenue village Pune (M Corp.) · shown on this site as Baner
TalukaPune City
Street, as filed -
Bounded north by S NO 96
Bounded east by PLOT NO D1
Bounded south by 12 MTR SOCIETY INTERNAL ROAD
Bounded west by 18 MTR WIDE ROAD

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerJagdish Universal Promoters
Registered office549/2, Shree Bhagawati Niwas, Nh4, Near Shree Bhagwati Annapurna Restaurant, Panchwad, Satara 415513

Professionals named on the filing

Architect D O Nikam CA/92/15160
Engineer Nikhil D Nikam
Chartered Accountant S A N D And Associates 171292

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

19 March 2024 is when an advocate last certified the title to this land
Title report Search Report- As per RERA_compressed.pdf 19 March 2024
Promoter's declaration, Form B Form B- Affidavit - Promoter.pdf 21 March 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100055978
Promoter Jagdish Universal Promoters
Project typeResidential / Group Housing · Building development
LocalityBaner — Pune City taluka, pincode 411045
Applied on22 March 2024
Registered on02 May 2024
Completion, as first filed01 April 2027
Due01 August 2027 4 months later
Units declared6
Units sold 3 of 6 sold (50%), 3 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 02 May 2024
Application referenceREA52100155563
Current statusActive
Record last changed 02 May 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 3 of 6 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 6 flats and reaches the same answer — 3 sold, every one with money recorded as received against a named flat, and 1 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 02 May 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Om Krushnay Namaha registered with MahaRERA?
Yes. It is registered as P52100055978, filed on 02 May 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Om Krushnay Namaha due to be handed over?
The promoter has told MahaRERA August 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Om Krushnay Namaha been delayed?
Yes. The first date filed was April 2027. It now stands at August 2027, 4 months later.
What did buyers actually pay in Om Krushnay Namaha?
A median of ₹10,562 per square foot of carpet, across 3 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Om Krushnay Namaha?
1 of 6 were still unsold at the promoter's last filing, in 2 BHK, from 919 sq ft of carpet.
Are there complaints against Om Krushnay Namaha?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Om Krushnay Namaha?
Jagdish Universal Promoters, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 14 October 2026. The authority's own registry page for P52100055978 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Baner