In short

Kalpataru Jade Skyline in Baner is MahaRERA-registered (P52100033791) and still under construction, with possession filed for December 2026. Buyers have already registered 327 sales here at a median ₹16,062 per sq ft of carpet — not an asking price. About 70% of the 465 units are sold. 3 complaints sit on the filing. Astrum Developments Private Limited is the promoter.

Stock image, not a photograph of Kalpataru Jade Skyline Stock image
Where
Baner
pincode 411045
Sold here at
₹16,062
per sq ft, 327 registered sales
Available
2 BHK
10 left · 314–737 sq ft
Possession
Dec 2026
as filed with MahaRERA
A stock photograph, not Kalpataru Jade Skyline. We have no picture of this site yet.

Where this is

Baner, PMC, Pune, 411045

Village
Baner
Taluka
Haveli
Pincode
411045
Coordinates
18.555620, 73.784757

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 465 flats are filed unit by unit with the authority, the highest on floor 21. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 38 units · none available

38 units 300 sq ft 27.85–27.86 sq m as filed

2 BHK 89 units · 2 available

9 units 664 sq ft 61.68 sq m as filed
18 units 668 sq ft 62.08–62.09 sq m as filed
17 units 737 sq ft 68.48 sq m as filed
21 units 738 sq ft 68.53 sq m as filed
4 units 815 sq ft 75.68 sq m as filed
8 units 846 sq ft 78.56–78.57 sq m as filed
12 units 849 sq ft 78.88–78.89 sq m as filed

3 BHK 262 units · none available

21 units 956 sq ft 88.85 sq m as filed
17 units 958 sq ft 89.02 sq m as filed
20 units 1019 sq ft 94.66 sq m as filed
92 units 1022 sq ft 94.92–94.95 sq m as filed
20 units 1026 sq ft 95.3 sq m as filed
92 units 1029 sq ft 95.58–95.59 sq m as filed

4 BHK 4 units · none available

4 units 1195 sq ft 110.98 sq m as filed

Configuration not filed 72 units · 8 available

24 units 314 sq ft 29.2 sq m as filed
24 units 315 sq ft 29.24–29.3 sq m as filed
24 units 317 sq ft 29.49 sq m as filed
Units sold

327 / 465

Selling steadily

70% absorption rate

Visual area guide See what the filed sizes feel like 4 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 38 flats · none available

300 sq ft carpet as drawn

Carpet, filed
300 sq ft
Built-up
about 360 sq ft
Super built-up
about 420 sq ft
Every room in this flat

Living and dining about 112 sq ft, Master bedroom about 75 sq ft, Kitchen about 45 sq ft, Bath about 26 sq ft, Balcony about 26 sq ft, Passage about 15 sq ft.

2 BHK 89 flats · 2 available

738 sq ft carpet as drawn, from 664–849 sq ft filed in this configuration

Carpet, filed
738 sq ft
Built-up
about 886 sq ft
Super built-up
about 1,033 sq ft
Every room in this flat

Living and dining about 215 sq ft, Master bedroom about 143 sq ft, Second bedroom about 115 sq ft, Kitchen about 86 sq ft, Bath about 50 sq ft, Balcony about 50 sq ft, Second bath about 43 sq ft, Passage about 36 sq ft.

3 BHK 262 flats · none available

1,022 sq ft carpet as drawn, from 956–1,029 sq ft filed in this configuration

Carpet, filed
1,022 sq ft
Built-up
about 1,226 sq ft
Super built-up
about 1,431 sq ft
Every room in this flat

Living and dining about 251 sq ft, Master bedroom about 168 sq ft, Second bedroom about 134 sq ft, Third bedroom about 109 sq ft, Kitchen about 101 sq ft, Bath about 59 sq ft, Balcony about 59 sq ft, Second bath about 50 sq ft, Passage about 50 sq ft, Third bath about 42 sq ft.

4 BHK 4 flats · none available

1,195 sq ft carpet as drawn

Carpet, filed
1,195 sq ft
Built-up
about 1,434 sq ft
Super built-up
about 1,673 sq ft
Every room in this flat

Living and dining about 266 sq ft, Master bedroom about 177 sq ft, Second bedroom about 142 sq ft, Third bedroom about 115 sq ft, Kitchen about 106 sq ft, Fourth bedroom about 106 sq ft, Bath about 62 sq ft, Balcony about 62 sq ft, Passage about 62 sq ft, Second bath about 53 sq ft, Third bath about 44 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹16,062 per sq ft of carpet, median of 327 registered sales
Range across those sales ₹12,624 to ₹19,652 per sq ft
Sold and booked 276 sold, 51 booked
Still available 10 flats, 300–1195 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2026
Current status Due Dec 2026

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S No 12 Part Baner Tal Haveli District Pune is the plot this project is built on, as filed
Revenue village Baner
TalukaHaveli
Street, as filed Off Pan Card Road
Bounded north by 24 meter wide DP road
Bounded east by Remaining portion of S No 12
Bounded south by Remaining portion of S No 12
Bounded west by Amenity Space

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerAstrum Developments Private Limited
Registered office101, Kalpataru Synergy, Vakola, Opp. Grand Hyatt, Santacruz East, Mumbai Suburban 400055
Registered agents 10 licensed agents may sell this project

Professionals named on the filing

Architect Minaj Magdum CA/2016/7667
Architect Swapnil Potdar (Architect Certificate-Form 1 and Form 4)
Architect Swapnil Potdar (Architect Certificate-Form 1) CA/2002/29969
Engineer Swapnil Wagh NA
Engineer Vishwas Kadam ( Engineer Certificate-Form 2)
Chartered Accountant C R Mohnot & Co ( CA Certificate-Form 3) 059594
Chartered Accountant C R Mohnot & Co ( CA Certificate-Form 3)
Chartered Accountant Singhi & Co. 204936

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

3 cases against this project, 0 with an order on record, filed between Jun 2026 and Jul 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12604254 Jul 2026 No order on record
CC12603912 Jun 2026 No order on record
CC12603913 Jun 2026 No order on record

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

1 March 2022 is when an advocate last certified the title to this land
Title report 3408_001 Final.pdf 1 March 2022 1 older version on file
Promoter's declaration, Form B B Form - Neo Pharma.pdf 11 February 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100033791
Promoter Astrum Developments Private Limited
Project typeResidential / Group Housing · Building development
LocalityBaner — Haveli taluka, pincode 411045
Applied on16 February 2022
Registered on08 March 2022
Completion, as first filed31 December 2026
Due31 December 2026
Units declared465
Units sold 327 of 465 sold (70%), 138 still unsold
Complaints3 on record with MahaRERA
Certificate on file Original registration certificate, issued 29 May 2024
Application referenceREA52100103560
Current statusActive
Record last changed 07 January 2026 · 9 months ago

Where the sold count comes from, and whether it holds up. 327 of 465 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 465 flats and reaches the same answer — 276 sold, every one with money recorded as received against a named flat, 51 booked with a price agreed but nothing received yet, and 10 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 07 January 2026.

Common questions

Is Kalpataru Jade Skyline registered with MahaRERA?
Yes. It is registered as P52100033791, filed on 08 March 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Kalpataru Jade Skyline due to be handed over?
The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Kalpataru Jade Skyline been delayed?
No. December 2026 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Kalpataru Jade Skyline?
A median of ₹16,062 per square foot of carpet, across 327 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Kalpataru Jade Skyline?
10 of 465 were still unsold at the promoter's last filing, in 2 BHK, from 314–737 sq ft of carpet.
Are there complaints against Kalpataru Jade Skyline?
3 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Kalpataru Jade Skyline?
Astrum Developments Private Limited, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100033791 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Baner

Stock image, not a photograph of Elegance Vega Stock image
Registered here
₹8,857
On offer
2 BHK + shops
Under construction

Elegance Vega

Elegance Landmarks · Baner

96 sold
Slipped 10 months
Due
Apr 2027
Units
74
Carpet
412–788
Sold at
₹68.5 lakh
P52100049473
Stock image, not a photograph of Elements Stock image
Nearby
₹11,116
On offer
2 BHK
Under construction

Elements

Star Pioneers Construction Private Limited · Baner

0 sold

1 complaint

Slipped 4 months
Due
Apr 2030
Units
196
Carpet
636–1,280
Typical flat
~₹96.7 lakh
PR1260002502240
Stock image, not a photograph of Emisphere Stock image
Valued from
₹9,042
On offer
Offices + shops
Under construction

Emisphere

G M Kenjale Developers · Baner

16 sold
Slipped 4 months
Due
Apr 2028
Units
56
Carpet
319–962
Sold at
₹75 lakh