Mahalaxmi Heights

Amboli, Pune · Residential / Group Housing by Mahalaxmi Developers

Official record Updated from the register 10 October 2026. Anything filed since then is not here yet.

In short

Mahalaxmi Heights in Amboli is MahaRERA-registered (P52100010556) and was handed over in December 2026. Buyers have already registered 42 sales here at a median ₹3,867 per sq ft of carpet — not an asking price. About 58% of the 80 units are sold. Mahalaxmi Developers is the promoter.

Stock image, not a photograph of Mahalaxmi Heights Stock image
Where
Amboli
pincode 410505
Sold here at
₹3,867
per sq ft, 42 registered sales
Available
1 BHK
3 left · 480 sq ft
Now due
Dec 2026
2 years later than first promised
A stock photograph, not Mahalaxmi Heights. We have no picture of this site yet.

Where this is

Amboli, Pune, 410505

Village
Holewadi
Taluka
Khed
Pincode
410505
Coordinates
18.845935, 73.892180

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 80 flats are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 80 units · 3 available

40 units 480 sq ft 44.6 sq m as filed
40 units 497 sq ft 46.18 sq m as filed
Units sold

46 / 80

Selling steadily

58% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 80 flats · 3 available

480 sq ft carpet as drawn, from 480–497 sq ft filed in this configuration

Carpet, filed
480 sq ft
Built-up
about 576 sq ft
Super built-up
about 672 sq ft
Every room in this flat

Living and dining about 180 sq ft, Master bedroom about 120 sq ft, Kitchen about 72 sq ft, Bath about 42 sq ft, Balcony about 42 sq ft, Passage about 24 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹3,867 per sq ft of carpet, median of 42 registered sales
Range across those sales ₹2,350 to ₹4,819 per sq ft
Sold and booked 45 sold, 1 booked
Still available 3 flats, 480–497 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

4 further sales are set aside. They divide out beyond ₹9,556 per sq ft, more than two and a half times this project's own median. A flat does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.

Timeline audit

Original proposed Dec 2024
Current status Handed over Dec 2026

Revised projection

The completion date has moved from December 2024 to December 2026, 2 years later, on the promoter's own revised filing.

Buyers who took possession late here may still have had a claim under section 18 of the Real Estate (Regulation and Development) Act, which entitles them to interest for every month of delay beyond the date in their agreement. More usefully for anyone buying today, this is a record of how this promoter performed against their own filed date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

87 / 1A and 87 / 1B is the plot this project is built on, as filed
Revenue village Holewadi · shown on this site as Amboli
TalukaKhed
Street, as filed Pabal road
Bounded north by Gat no 86
Bounded east by Gat no 87 part 2 and Pabal road SH 103
Bounded south by Gat no 87 part 2
Bounded west by Gat No 100

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerMahalaxmi Developers
Registered office87, Gat No. 87/1A And 87/1B, Mahalaxmi Heights, Pabal Road, Holewadi, Chavanmala, Pune 410505

Professionals named on the filing

Architect Mr Gurudev B Borhade PMRDA/ENG/803/2025-27
Engineer Mr Gurudev B Borhade PMRDA/ENG/803/2025-27
Chartered Accountant Morde & Retwade 174859

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

24 August 2017 is when an advocate last certified the title to this land
Title report tittle.pdf 24 August 2017
Promoter's declaration, Form B FORM B_compressed.pdf 21 May 2025 1 older version on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100010556
Promoter Mahalaxmi Developers
Project typeResidential / Group Housing · Building development
LocalityAmboli — Khed taluka, pincode 410505
Applied on29 August 2017
Registered on31 August 2017
Completion, as first filed30 December 2024
Handed over30 December 2026 2 years later
Units declared80
Units sold 46 of 80 sold (58%), 34 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 09 September 2021
Application referenceREA52100022500
Current statusCompleted
Record last changed 02 June 2025 · 16 months ago

Where the sold count comes from, and whether it holds up. 46 of 80 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 80 flats and reaches the same answer — 45 sold, 41 of them with money recorded as received against a named flat, 1 booked with a price agreed but nothing received yet, and 3 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 02 June 2025.

Common questions

Is Mahalaxmi Heights registered with MahaRERA?
Yes. It is registered as P52100010556, filed on 31 August 2017, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has Mahalaxmi Heights been handed over?
Yes. The completion date on the register is December 2026.
Has Mahalaxmi Heights been delayed?
Yes. The first date filed was December 2024. It now stands at December 2026, 2 years later.
What did buyers actually pay in Mahalaxmi Heights?
A median of ₹3,867 per square foot of carpet, across 42 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Mahalaxmi Heights?
3 of 80 were still unsold at the promoter's last filing, in 1 BHK, from 480 sq ft of carpet.
Are there complaints against Mahalaxmi Heights?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Mahalaxmi Heights?
Mahalaxmi Developers, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 10 October 2026. The authority's own page for P52100010556 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Amboli

Stock image, not a photograph of Gulmohar Society Stock image
Registered here
₹3,508
On offer
1 BHK
Under construction

Gulmohar Society

Nitin Sitaram Kulkarni · Amboli

51 sold
Slipped 2 years
Due
Dec 2027
Units
37
Carpet
388–425
Sold at
₹8.5 lakh
P52100020640
Stock image, not a photograph of Suryaprastha Stock image
Registered here
₹3,010
On offer
2 BHK
Under construction

Suryaprastha

Suryaputra Developers · Amboli

90 sold
Slipped 4 months
Due
Apr 2027
Units
40
Carpet
772–775
Sold at
₹16 lakh
P52100078727