RERA registered P52100029439 Active
Aryaa Dream Town
Amboli, Pune · Residential / Group Housing by Vini Builders And Developers
Official record Updated from the register 10 October 2026. Anything filed since then is not here yet.
In short
Aryaa Dream Town in Amboli is MahaRERA-registered (P52100029439) and still under construction, with possession filed for December 2026. Buyers have already registered 87 sales here at a median ₹3,767 per sq ft of carpet — not an asking price. About 59% of the 147 units are sold. Vini Builders And Developers is the promoter.
- Sold here at
- ₹3,767
- per sq ft, 87 registered sales
- Available
- 1 Room Kitchen, 1 BHK, 3 BHK
- 60 left · 213–946 sq ft
- Now due
- Dec 2026
- 2 years later than first promised
Where this is
Amboli, Pune, 410505
The promoter filed a coordinate that falls outside Pune district, so it is not used here. The link above searches Maps by name and locality instead.
Flat sizes on file
All 147 flats are filed unit by unit with the authority, the highest on floor 11. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 Room Kitchen 22 units · 12 available
1 BHK 109 units · 44 available
3 BHK 16 units · 4 available
87 / 147
59% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 Room Kitchen 22 flats · 12 available
213 sq ft carpet as drawn
- Carpet, filed
- 213 sq ft
- Built-up
- about 256 sq ft
- Super built-up
- about 298 sq ft
Every room in this flat
Living and sleeping about 128 sq ft, Kitchen about 43 sq ft, Bath about 23 sq ft, Balcony about 19 sq ft.
1 BHK 109 flats · 44 available
372 sq ft carpet as drawn, from 335–439 sq ft filed in this configuration
- Carpet, filed
- 372 sq ft
- Built-up
- about 446 sq ft
- Super built-up
- about 521 sq ft
Every room in this flat
Living and dining about 140 sq ft, Master bedroom about 93 sq ft, Kitchen about 56 sq ft, Bath about 33 sq ft, Balcony about 33 sq ft, Passage about 19 sq ft.
3 BHK 16 flats · 4 available
946 sq ft carpet as drawn
- Carpet, filed
- 946 sq ft
- Built-up
- about 1,135 sq ft
- Super built-up
- about 1,324 sq ft
Every room in this flat
Living and dining about 233 sq ft, Master bedroom about 155 sq ft, Second bedroom about 124 sq ft, Third bedroom about 101 sq ft, Kitchen about 93 sq ft, Bath about 54 sq ft, Balcony about 54 sq ft, Second bath about 47 sq ft, Passage about 47 sq ft, Third bath about 39 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹2,325 to ₹4,926 per sq ft |
|---|---|
| Sold and booked | 87 sold, 0 booked |
| Still available | 60 flats, 213–946 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2024 to December 2026, 2 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Chandoli · shown on this site as Amboli |
|---|---|
| Taluka | Khed |
| Street, as filed | CHANDOLI |
| Bounded north by | VILLAGE ROAD |
| Bounded east by | GAT NO 187 PART AGRICULTURAL LAND |
| Bounded south by | GAT NO 183 PART AGRICULTIRAL LANS |
| Bounded west by | GAT NO 189 AGRICULTURAL LAND |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Vini Builders And Developers |
|---|---|
| Registered office | Gat No 187,188, Aryaa Dream Town, Chandoli, Near Government Hospital, Rajgurunagar, Pune 410505 |
Professionals named on the filing
| Architect | Pratik Patole CA/015/67340 |
|---|---|
| Engineer | Atul Ramdas Chikane Associates STATE/R/2025/APL/19565 |
| Engineer | Ravindra Karnavat |
| Chartered Accountant | Yogesh Tanpure 167355 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report TITAL REPORT.pdf | 25 December 2020 |
|---|---|
| Promoter's declaration, Form B From B with 500 stamp.pdf | 20 February 2025 1 older version on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100029439 |
| Promoter | Vini Builders And Developers |
| Project type | Residential / Group Housing · Building development |
| Locality | Amboli — Khed taluka, pincode 410505 |
| Applied on | 25 December 2020 |
| Registered on | 29 May 2021 |
| Completion, as first filed | 31 December 2024 |
| Due | 31 December 2026 2 years later |
| Units declared | 147 |
| Units sold | 87 of 147 sold (59%), 60 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 27 March 2026 |
| Application reference | REA52100081834 |
| Current status | Active |
| Record last changed | 15 April 2026 · 6 months ago |
Where the sold count comes from, and whether it holds up. 87 of 147 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 147 flats and reaches the same answer — 87 sold, every one with money recorded as received against a named flat, and 60 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 15 April 2026.
Common questions
- Is Aryaa Dream Town registered with MahaRERA?
- Yes. It is registered as P52100029439, filed on 29 May 2021, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Aryaa Dream Town due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Aryaa Dream Town been delayed?
- Yes. The first date filed was December 2024. It now stands at December 2026, 2 years later.
- What did buyers actually pay in Aryaa Dream Town?
- A median of ₹3,767 per square foot of carpet, across 87 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Aryaa Dream Town?
- 60 of 147 were still unsold at the promoter's last filing, in 1, 3 BHK + 1 RK, from 213–946 sq ft of carpet.
- Are there complaints against Aryaa Dream Town?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Aryaa Dream Town?
- Vini Builders And Developers, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 10 October 2026. The authority's own page for P52100029439 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Amboli
Stock image
- Due
- Mar 2028
- Units
- —
- Carpet
- —
- Typical flat
- —
Stock image
- Registered here
- ₹3,508
- On offer
- 1 BHK
- Due
- Dec 2027
- Units
- 37
- Carpet
- 388–425
- Sold at
- ₹8.5 lakh
Stock image
- Registered here
- ₹4,515
- On offer
- 1, 2 BHK +2 more
- Due
- Dec 2026
- Units
- 219
- Carpet
- 198–2,595
- Sold at
- ₹20 lakh