Z Zomefy

RERA registered P52100054567 Active

Stella F1

Alandi, Pune · Others by Dmk Infrastructure Pvt Ltd

Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.

In short

Stella F1 in Alandi is MahaRERA-registered (P52100054567) and still under construction, with possession filed for May 2027. Buyers have already registered 32 sales here at a median ₹6,174 per sq ft of carpet — not an asking price. About 61% of the 62 units are sold. 1 complaint sits on the filing. Dmk Infrastructure Pvt Ltd is the promoter.

Stock image, not a photograph of Stella F1 Stock image
Where
Alandi
pincode 412105
Sold here at
₹6,174
per sq ft, 32 registered sales
Available
2, 3 BHK
24 left · 634–993 sq ft
Now due
May 2027
4 months later than first promised
A stock photograph, not Stella F1. We have no picture of this site yet.

Where this is

Alandi, PCMC, Pune, 412105

Taluka
Mulshi
Pincode
412105

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 62 units are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 2 units · all available

2 units 634 sq ft 58.87 sq m as filed

3 BHK 54 units · 22 available

54 units 993 sq ft 92.23 sq m as filed

Shops 6 units · all sold

1 unit 251 sq ft 23.33 sq m as filed
1 unit 291 sq ft 27.02 sq m as filed
1 unit 325 sq ft 30.17 sq m as filed
1 unit 399 sq ft 37.09 sq m as filed
1 unit 400 sq ft 37.16 sq m as filed
1 unit 419 sq ft 38.95 sq m as filed
Units sold

38 / 62

Selling steadily

61% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

2 BHK 2 units · 2 available

634 sq ft carpet as drawn

Carpet, filed
634 sq ft
Built-up
about 761 sq ft
Super built-up
about 888 sq ft
Every room in this unit

Living and dining about 185 sq ft, Master bedroom about 123 sq ft, Second bedroom about 98 sq ft, Kitchen about 74 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.

3 BHK 54 units · 22 available

993 sq ft carpet as drawn

Carpet, filed
993 sq ft
Built-up
about 1,192 sq ft
Super built-up
about 1,390 sq ft
Every room in this unit

Living and dining about 244 sq ft, Master bedroom about 163 sq ft, Second bedroom about 130 sq ft, Third bedroom about 106 sq ft, Kitchen about 98 sq ft, Bath about 57 sq ft, Balcony about 57 sq ft, Second bath about 49 sq ft, Passage about 49 sq ft, Third bath about 41 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹6,174 per sq ft of carpet, median of 32 registered sales
Range across those sales ₹5,414 to ₹6,298 per sq ft
Sold and booked 38 sold, 0 booked
Still available 24 units, 251–993 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jan 2027
Current status Due May 2027

Revised projection

The completion date has moved from January 2027 to May 2027, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S. No./Gat No.216/2 (P), Dudulgaon is the plot this project is built on, as filed
TalukaMulshi
Street, as filed Moshi Alandi Road
Bounded north by Tanaji D Pawarand remaining portion of Gat No 216
Bounded east by Property out of Gat No 215
Bounded south by Property of Mr Nivrutti G Saste
Bounded west by DP Road and Moshi - Dudulgaon Boundry

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerDmk Infrastructure Pvt Ltd
Registered office216 2, 66, Project Stella, Moshi Alandi Road, Behind Ostia, Moshi, Pune 412105

Professionals named on the filing

Architect Ar Sunil Nawale 15738
Engineer Mr. Vishal Ingle
Engineer swapnil bondar
Chartered Accountant DAPNS & Co. Chartered Accountants
Chartered Accountant Gandhi Kale 168354

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC005000000340740 Apr 2024 Order passed Apr 2024

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

24 January 2024 is when an advocate last certified the title to this land
Title report Search Report-1-5_11zon.pdf 24 January 2024 3 older versions on file
Promoter's declaration, Form B Stella F1 - Form B (1).pdf 8 January 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100054567
Promoter Dmk Infrastructure Pvt Ltd
Project typeOthers · Building development
LocalityAlandi — Mulshi taluka, pincode 412105
Applied on11 January 2024
Registered on31 January 2024
Completion, as first filed09 January 2027
Due09 May 2027 4 months later
Units declared62
Units sold 38 of 62 sold (61%), 24 still unsold
Complaints1 on record with MahaRERA
Certificate on file Original registration certificate, issued 31 January 2024
Application referenceREA52100152101
Current statusActive
Record last changed 31 January 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 38 of 62 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 62 units and reaches the same answer — 38 sold, every one with money recorded as received against a named unit, and 24 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 31 January 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Stella F1 registered with MahaRERA?
Yes. It is registered as P52100054567, filed on 31 January 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Stella F1 due to be handed over?
The promoter has told MahaRERA May 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Stella F1 been delayed?
Yes. The first date filed was January 2027. It now stands at May 2027, 4 months later.
What did buyers actually pay in Stella F1?
A median of ₹6,174 per square foot of carpet, across 32 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Stella F1?
24 of 62 were still unsold at the promoter's last filing, in 2, 3 BHK, from 634–993 sq ft of carpet.
Are there complaints against Stella F1?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Stella F1?
Dmk Infrastructure Pvt Ltd, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100054567 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Alandi

Stock image, not a photograph of Lotus Plaza Stock image
Registered here
₹6,377
On offer
1, 2, 3 BHK +2 more
Under construction

Lotus Plaza

Ekvira Properties · Alandi

11 sold
Slipped 4 months
Due
Apr 2028
Units
134
Carpet
137–1,541
Sold at
₹40 lakh
P52100055293
Stock image, not a photograph of Matoshri Prime Stock image
Registered here
₹7,537
On offer
Offices + shops
Under construction

Matoshri Prime

Shrimatoshri Infrabuild LLP · Alandi

71 sold
Slipped 17 months
Due
Nov 2026
Units
51
Carpet
248–847
Sold at
₹39.6 lakh
P52100051338