Z Zomefy

RERA registered P52100015436 Completed

Excel Celestia Residency Wing B And C

Alandi, Pune · Residential / Group Housing by Excel Housing

Official record Updated from the register 02 October 2026. Anything filed since then is not here yet.

In short

Excel Celestia Residency Wing B And C in Alandi is MahaRERA-registered (P52100015436) and was handed over in December 2023. Buyers have already registered 79 sales here at a median ₹5,147 per sq ft of carpet — not an asking price. About 84% of the 94 units are sold. Excel Housing is the promoter.

Stock image, not a photograph of Excel Celestia Residency Wing B And C Stock image
Where
Alandi
pincode 412105
Sold here at
₹5,147
per sq ft, 79 registered sales
Available
1, 2 BHK
15 left · 442–659 sq ft
Now due
Dec 2023
a year later than first promised
A stock photograph, not Excel Celestia Residency Wing B And C. We have no picture of this site yet.

Where this is

Alandi, PCMC, Pune, 412105

Village
Pimpri Chinchawad (M Corp.)
Taluka
Haveli
Pincode
412105
Coordinates
18.679760, 73.866530

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 94 flats are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 47 units · 11 available

24 units 442 sq ft 41.07 sq m as filed
23 units 474 sq ft 44.04 sq m as filed

2 BHK 47 units · 4 available

23 units 659 sq ft 61.23 sq m as filed
24 units 684 sq ft 63.52 sq m as filed
Units sold

79 / 94

Nearly sold out

84% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 47 flats · 11 available

442 sq ft carpet as drawn, from 442–474 sq ft filed in this configuration

Carpet, filed
442 sq ft
Built-up
about 530 sq ft
Super built-up
about 619 sq ft
Every room in this flat

Living and dining about 166 sq ft, Master bedroom about 110 sq ft, Kitchen about 66 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Passage about 22 sq ft.

2 BHK 47 flats · 4 available

684 sq ft carpet as drawn, from 659–684 sq ft filed in this configuration

Carpet, filed
684 sq ft
Built-up
about 821 sq ft
Super built-up
about 958 sq ft
Every room in this flat

Living and dining about 199 sq ft, Master bedroom about 133 sq ft, Second bedroom about 106 sq ft, Kitchen about 80 sq ft, Bath about 46 sq ft, Balcony about 46 sq ft, Second bath about 40 sq ft, Passage about 33 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹5,147 per sq ft of carpet, median of 79 registered sales
Range across those sales ₹4,192 to ₹7,528 per sq ft
Sold and booked 79 sold, 0 booked
Still available 15 flats, 442–684 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2022
Current status Handed over Dec 2023

Revised projection

The completion date has moved from December 2022 to December 2023, a year later, on the promoter's own revised filing.

Buyers who took possession late here may still have had a claim under section 18 of the Real Estate (Regulation and Development) Act, which entitles them to interest for every month of delay beyond the date in their agreement. More usefully for anyone buying today, this is a record of how this promoter performed against their own filed date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

GAT NO 247 is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Alandi
TalukaHaveli
Street, as filed DEHU ALANDI ROAD
Bounded north by GAT NO 246
Bounded east by ROAD
Bounded south by GAT NO 246
Bounded west by PROPOSED WING A

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerExcel Housing
Registered officeS No 36 Flat No 203, Pratham Apartment, Kale Borate Nagar, Hadapsar, Pune 411028

Professionals named on the filing

Architect Mrs Usha Rangrajan CA/90/13423
Engineer Pravin B More 0900001203
Chartered Accountant Yashank Chaudhari 181603

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

16 February 2018 is when an advocate last certified the title to this land
Title report collective Search.pdf 16 February 2018
Promoter's declaration, Form B form b.pdf 16 February 2018

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100015436
Promoter Excel Housing
Project typeResidential / Group Housing · Building development
LocalityAlandi — Haveli taluka, pincode 412105
Applied on16 February 2018
Registered on23 February 2018
Completion, as first filed30 December 2022
Handed over30 December 2023 a year later
Units declared94
Units sold 79 of 94 sold (84%), 15 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 10 September 2021
Application referenceREA52100032642
Current statusCompleted
Record last changed 06 March 2023 · over 3 years ago

Where the sold count comes from, and whether it holds up. 79 of 94 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 94 flats and reaches the same answer — 79 sold, every one with money recorded as received against a named flat, and 15 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 06 March 2023.

Common questions

Is Excel Celestia Residency Wing B And C registered with MahaRERA?
Yes. It is registered as P52100015436, filed on 23 February 2018, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has Excel Celestia Residency Wing B And C been handed over?
Yes. The completion date on the register is December 2023.
Has Excel Celestia Residency Wing B And C been delayed?
Yes. The first date filed was December 2022. It now stands at December 2023, a year later.
What did buyers actually pay in Excel Celestia Residency Wing B And C?
A median of ₹5,147 per square foot of carpet, across 79 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Excel Celestia Residency Wing B And C?
15 of 94 were still unsold at the promoter's last filing, in 1, 2 BHK, from 442–659 sq ft of carpet.
Are there complaints against Excel Celestia Residency Wing B And C?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Excel Celestia Residency Wing B And C?
Excel Housing, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 02 October 2026. The authority's own page for P52100015436 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Alandi