Z Zomefy

RERA registered P52100049452 Active

Destination El Progreso B Building

Alandi, Pune · Others by El Progreso Landmarks

Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

Destination El Progreso B Building in Alandi is MahaRERA-registered (P52100049452) and still under construction, with possession filed for December 2026. Buyers have already registered 128 sales here at a median ₹8,376 per sq ft of carpet — not an asking price. About 78% of the 170 units are sold. El Progreso Landmarks is the promoter.

Stock image, not a photograph of Destination El Progreso B Building Stock image
Where
Alandi
pincode 412105
Sold here at
₹8,376
per sq ft, 128 registered sales
Available
2, 3 BHK
4 left · 598–685 sq ft
Possession
Dec 2026
as filed with MahaRERA
A stock photograph, not Destination El Progreso B Building. We have no picture of this site yet.

Where this is

Alandi, PCMC, Pune, 412105

Street map of Alandi centred on the coordinate filed for Destination El Progreso B Building, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Pimpri Chinchawad (M Corp.)
Taluka
Haveli
Pincode
412105
Coordinates
18.619108, 73.804796

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 170 units are filed unit by unit with the authority, the highest on floor 13. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 74 units · 3 available

4 units 598 sq ft 55.57 sq m as filed
3 units 605 sq ft 56.23–56.24 sq m as filed
10 units 618 sq ft 57.41–57.44 sq m as filed
20 units 624 sq ft 57.95 sq m as filed
10 units 632 sq ft 58.71 sq m as filed
1 unit 639 sq ft 59.41 sq m as filed
26 units 644 sq ft 59.81 sq m as filed

3 BHK 82 units · 1 available

1 unit 598 sq ft 55.56 sq m as filed
1 unit 644 sq ft 59.81 sq m as filed
9 units 684 sq ft 63.58 sq m as filed
4 units 685 sq ft 63.6 sq m as filed
5 units 688 sq ft 63.91–63.93 sq m as filed
6 units 726 sq ft 67.43–67.44 sq m as filed
21 units 754 sq ft 70.05 sq m as filed
35 units 788 sq ft 73.19 sq m as filed

Shops 14 units · none available

6 units 176 sq ft 16.37 sq m as filed
2 units 207 sq ft 19.19 sq m as filed
4 units 208 sq ft 19.37 sq m as filed
1 unit 247 sq ft 22.92 sq m as filed
1 unit 301 sq ft 28.0 sq m as filed
Units sold

132 / 170

Selling steadily

78% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

2 BHK 74 units · 3 available

644 sq ft carpet as drawn, from 598–644 sq ft filed in this configuration

Carpet, filed
644 sq ft
Built-up
about 773 sq ft
Super built-up
about 902 sq ft
Every room in this unit

Living and dining about 188 sq ft, Master bedroom about 125 sq ft, Second bedroom about 100 sq ft, Kitchen about 75 sq ft, Bath about 44 sq ft, Balcony about 44 sq ft, Second bath about 38 sq ft, Passage about 31 sq ft.

3 BHK 82 units · 1 available

788 sq ft carpet as drawn, from 598–788 sq ft filed in this configuration

Carpet, filed
788 sq ft
Built-up
about 946 sq ft
Super built-up
about 1,103 sq ft
Every room in this unit

Living and dining about 194 sq ft, Master bedroom about 129 sq ft, Second bedroom about 103 sq ft, Third bedroom about 84 sq ft, Kitchen about 78 sq ft, Bath about 45 sq ft, Balcony about 45 sq ft, Second bath about 39 sq ft, Passage about 39 sq ft, Third bath about 32 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹8,376 per sq ft of carpet, median of 128 registered sales
Range across those sales ₹5,688 to ₹10,688 per sq ft
Sold and booked 132 sold, 0 booked
Still available 4 units, 176–788 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

1 further sale is set aside. It divides out beyond ₹20,941 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.

Timeline audit

Original proposed Dec 2026
Current status Due Dec 2026

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

GAT NO 75 BORHADEWADI is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Alandi
TalukaHaveli
Street, as filed BORHADEWADI
Bounded north by BY DESTINATION EL PROGRESO A BUILDING
Bounded east by BY BOUNDARY OF PCNTDA
Bounded south by BY BOUNDARY OF PCNTDA
Bounded west by BY GAT NO 79 OLD GAT NO 1199

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerEl Progreso Landmarks
Registered officeGat No 75, 75, Sharada Borhade Estate, Borhadewadi Moshi, Borhadewadi, Pune 412105

Professionals named on the filing

Architect Patil And Bugde Associates CA/2018/95970
Engineer Hanmant Nimbal
Engineer Kishor Sohandas Vaishanav NA
Engineer Mr Pravin More
Engineer Rohinee Badgujar PCMC/LE/0651/2017
Chartered Accountant CA Parag S Savale And Associates 604593
Chartered Accountant Cmrs & Associates LLP 212175

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

10 January 2023 is when an advocate last certified the title to this land
Title report R1 Rera Search Report.pdf 10 January 2023 2 older versions on file
Promoter's declaration, Form B AMIT GAVHANE.pdf 10 January 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100049452
Promoter El Progreso Landmarks
Project typeOthers · Building development
LocalityAlandi — Haveli taluka, pincode 412105
Applied on11 January 2023
Registered on14 February 2023
Completion, as first filed31 December 2026
Due31 December 2026
Units declared170
Units sold 132 of 170 sold (78%), 38 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 14 February 2023
Application referenceREA52100128674
Current statusActive
Record last changed 14 February 2023 · over 3 years ago 3 years untouched

Where the sold count comes from, and whether it holds up. 132 of 170 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 170 units and reaches the same answer — 132 sold, every one with money recorded as received against a named unit, and 4 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 14 February 2023.

MahaRERA has not recorded a change to this project's record in 3 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Destination El Progreso B Building registered with MahaRERA?
Yes. It is registered as P52100049452, filed on 14 February 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Destination El Progreso B Building due to be handed over?
The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Destination El Progreso B Building been delayed?
No. December 2026 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Destination El Progreso B Building?
A median of ₹8,376 per square foot of carpet, across 128 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Destination El Progreso B Building?
4 of 170 were still unsold at the promoter's last filing, in 2, 3 BHK, from 598–685 sq ft of carpet.
Are there complaints against Destination El Progreso B Building?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Destination El Progreso B Building?
El Progreso Landmarks, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100049452 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Alandi

Stock image, not a photograph of Lotus Plaza Stock image
Registered here
₹6,377
On offer
1, 2, 3 BHK +2 more
Under construction

Lotus Plaza

Ekvira Properties · Alandi

11 sold
Due
Dec 2027
Units
134
Carpet
137–1,541
Sold at
₹40 lakh
P52100055293
Stock image, not a photograph of Madhuban Stock image
Registered here
₹5,390
On offer
1, 2 BHK
Under construction

Madhuban

Pass Developers · Alandi

91 sold
Slipped 5 years
Due
Dec 2026
Units
35
Carpet
469–705
Sold at
₹26.5 lakh
P52100007662