RERA registered P52100052014 Active
Asha Paradise
Alandi, Pune · Residential / Group Housing by G T Buildcon
Official record Updated from the register 14 October 2026. Anything filed since then is not here yet.
In short
Asha Paradise in Alandi is MahaRERA-registered (P52100052014) and still under construction, with possession filed for November 2026. Buyers have already registered 6 sales here at a median ₹7,630 per sq ft of carpet — not an asking price. About 50% of the 12 units are sold. G T Buildcon is the promoter.
- Sold here at
- ₹7,630
- per sq ft, 6 registered sales
- Available
- 1 BHK
- 1 left · 328 sq ft
- Now due
- Nov 2026
- 4 months later than first promised
Alandi, PCMC, Pune, 412105
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 12 flats are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK Residences
2 BHK Residences
Carpet Area vs. Loading Factor Arithmetic
How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)
| Unit Configuration | Statutory RERA Carpet (Actual) | Approx Built-up (+20%) | Super Built-up (+40% Loading) | Available Inventory |
|---|---|---|---|---|
| 1 BHK | 328 sq ft (30.5 sq m) | ~394 sq ft | ~459 sq ft | 1 left of 8 |
| 2 BHK | 530 sq ft (49.22 sq m) | ~636 sq ft | ~742 sq ft | 0 left of 4 |
6 / 12
50% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 8 flats · 1 available
328 sq ft carpet as drawn
- Carpet, filed
- 328 sq ft
- Built-up
- about 394 sq ft
- Super built-up
- about 459 sq ft
Every room in this flat
Living and dining about 123 sq ft, Master bedroom about 82 sq ft, Kitchen about 49 sq ft, Bath about 29 sq ft, Balcony about 29 sq ft, Passage about 16 sq ft.
2 BHK 4 flats · none available
530 sq ft carpet as drawn
- Carpet, filed
- 530 sq ft
- Built-up
- about 636 sq ft
- Super built-up
- about 742 sq ft
Every room in this flat
Living and dining about 154 sq ft, Master bedroom about 103 sq ft, Second bedroom about 82 sq ft, Kitchen about 62 sq ft, Bath about 36 sq ft, Balcony about 36 sq ft, Second bath about 31 sq ft, Passage about 26 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹6,134 to ₹8,681 per sq ft |
|---|---|
| Sold and booked | 6 sold, 0 booked |
| Still available | 1 flat, 328–530 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Revised delivery projection
The completion date has moved from July 2026 to November 2026, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Street, as filed | CHOWISAWADI |
|---|---|
| Bounded north by | BY 20 FT ROAD |
| Bounded east by | BY PROPERTY OF MR KISAN PANDURANGVASANT ARJUN AND |
| Bounded south by | BY 12 FT ROAD |
| Bounded west by | BY PROPERTY OF MR SUDHAKAR HARIBHAU PANHALE |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | G T Buildcon |
|---|---|
| Registered office | Survey No 228/2, Nishigandha Niwas, Khandobamal, Bhosari, Pune 411039 |
Professionals named on the filing
| Architect | Patil Bugade Associates CA/2018/95970 |
|---|---|
| Engineer | Shubham Hadawale |
| Chartered Accountant | A. R. MUTHA & Co 630407 |
| Chartered Accountant | Pgmj And Associates 134039 |
| Chartered Accountant | R B Waghire And Company 640088 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report legal title.pdf | 21 June 2023 |
|---|---|
| Promoter's declaration, Form B Promoter Form B.pdf | 21 June 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100052014 |
| Promoter | G T Buildcon |
| Project type | Residential / Group Housing · Building development |
| Locality | Alandi — Haveli taluka, pincode 412105 |
| Applied on | 26 June 2023 |
| Registered on | 19 July 2023 |
| Completion, as first filed | 31 July 2026 |
| Due | 30 November 2026 4 months later |
| Units declared | 12 |
| Units sold | 6 of 12 sold (50%), 6 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 19 July 2023 |
| Application reference | REA52100141360 |
| Current status | Active |
| Record last changed | 19 July 2023 · over 3 years ago 3 years untouched |
Where the sold count comes from, and whether it holds up. 6 of 12 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 12 flats and reaches the same answer — 6 sold, every one with money recorded as received against a named flat, and 1 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 19 July 2023.
MahaRERA has not recorded a change to this project's record in 3 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
- Is Asha Paradise registered with MahaRERA?
- Yes. It is registered as P52100052014, filed on 19 July 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Asha Paradise due to be handed over?
- The promoter has told MahaRERA November 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Asha Paradise been delayed?
- Yes. The first date filed was July 2026. It now stands at November 2026, 4 months later.
- What did buyers actually pay in Asha Paradise?
- A median of ₹7,630 per square foot of carpet, across 6 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Asha Paradise?
- 1 of 12 were still unsold at the promoter's last filing, in 1 BHK, from 328 sq ft of carpet.
- Are there complaints against Asha Paradise?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Asha Paradise?
- G T Buildcon, as the promoter named on the registration.
Verify Government Filings Yourself
This dossier restates public records as filed on 14 October 2026. The authority's own registry page for P52100052014 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.
MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.
Other projects in Alandi
Stock image
- Nearby
- ₹5,762–6,585
- On offer
- 1, 2 BHK +2 more
- Due
- Sep 2031
- Units
- 197
- Carpet
- 106–775
- Typical unit
- ~₹29.7 lakh
Stock image
- Registered here
- ₹3,986
- On offer
- 1 BHK + shops
- Due
- Dec 2027
- Units
- 58
- Carpet
- 139–389
- Sold at
- ₹12.5 lakh
Stock image
- Due
- Jul 2033
- Units
- —
- Carpet
- —
- Typical unit
- —