In short

Ganga Orrion in Yerawada is MahaRERA-registered (P52100018964) and still under construction, with possession filed for December 2032. No registered sales are on file here yet. The government values the units from ₹14,394 per sq ft of carpet, a stamp-duty floor rather than a market price. None of the units are filed as sold yet. 1 complaint sits on the filing. Goel Eisha Developers is the promoter.

Stock image, not a photograph of Ganga Orrion Stock image
Where
Yerawada
pincode 411006
Valued from
₹14,394
per sq ft, the government’s floor
Available
Shops
31 left · 938–2,836 sq ft
Now due
Dec 2032
9.4 years later than first promised
A stock photograph, not Ganga Orrion. We have no picture of this site yet.

Where this is

Yerawada, PMC, Pune, 411006

Village
Pune (M Corp.)
Taluka
Pune City
Pincode
411006

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 31 units are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Nothing filed here is a home. Every unit is registered as non-residential — shops, offices or similar — which is the promoter's own answer on the register rather than anything read off the areas below.

Configuration not filed 5 units · all available

1 unit 938 sq ft 87.12 sq m as filed
1 unit 1068 sq ft 99.19 sq m as filed
1 unit 1760 sq ft 163.52 sq m as filed
1 unit 2070 sq ft 192.3 sq m as filed
1 unit 2726 sq ft 253.24 sq m as filed

Shops 26 units · all available

3 units 2454 sq ft 228.0 sq m as filed
3 units 2625 sq ft 243.84 sq m as filed
10 units 2668 sq ft 247.86 sq m as filed
10 units 2836 sq ft 263.48 sq m as filed
Units sold

0 / 31

Pre-launch / early phase

0% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.

Shops 26 units · 26 available

2,668 sq ft carpet as drawn, from 2,454–2,836 sq ft filed in this configuration

Carpet, filed
2,668 sq ft
Built-up
about 3,202 sq ft
Super built-up
about 3,735 sq ft

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What these units are valued at

No sale has been registered at Ganga Orrion yet. The promoter has filed no agreement values, so nothing below is this project's own price.

On sale here Carpet Valued at no less than
Not named 5 unsold 938–2,726 sq ft ₹2 crore–₹5.8 crore ₹21,279/sq ft
Shops 26 unsold 2,454–2,836 sq ft ₹3.5 crore–₹4.1 crore ₹14,394/sq ft

This is the Annual Statement of Rates value the promoter filed against each unsold unit — the state's valuation, not an asking price and not a discount. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Timeline audit

Original proposed Jul 2023
Current status Due Dec 2032

Revised projection

The completion date has moved from July 2023 to December 2032, 9.4 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

PLOT NO 8 & 23, FP NO 77, SR NO 209, HISSA NO 4, KALYANINAGAR is the plot this project is built on, as filed
Revenue village Pune (M Corp.) · shown on this site as Yerawada
TalukaPune City
Street, as filed PLOT NO.8+23, FINAL PLOT NO.77, SR NO.209/4, T.P SCHEME
Bounded north by BY 40 FT WIDE T P SCHEME ROAD
Bounded east by BY 80 T P SCHEME ROAD
Bounded south by BY 30 FT WIDE ROAD
Bounded west by BY PLOT NO 715 WIDE ROAD And

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerGoel Eisha Developers
Registered office604, 6th Floor, 5, San Mahu Complex, Bund Garden Road, Opp Poona Club, Camp, Pune 411001

Professionals named on the filing

Architect Ajit Bhagat CA/93/16460
Architect Sunil Chinchwade And Associates
Engineer Vinod Phadatare
Chartered Accountant A W Hattagre 135888
Chartered Accountant Mahesh Chandorkar 164374

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC005000000022366 Dec 2018 Order passed Dec 2018

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

11 December 2018 is when an advocate last certified the title to this land
Title report Search and Title.pdf 11 December 2018
Promoter's declaration, Form B Form B compressed.pdf 12 December 2018

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100018964
Promoter Goel Eisha Developers
Project typeCommercial · Building development
LocalityYerawada — Pune City taluka, pincode 411006
Applied on12 December 2018
Registered on17 December 2018
Completion, as first filed30 July 2023
Due31 December 2032 9.4 years later
Units declared31
Units sold None sold yet, all 31 on the market
Complaints1 on record with MahaRERA
Certificate on file Extension certificate, issued 09 July 2026
Application referenceREA52100047436
Current statusActive
Record last changed 09 July 2026 · 2 months ago

Nothing has sold yet. The promoter's quarterly progress report says none of the 31 units are gone, and the unit-by-unit list they file separately says the same: all 31 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 09 July 2026.

Common questions

Is Ganga Orrion registered with MahaRERA?
Yes. It is registered as P52100018964, filed on 17 December 2018, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Ganga Orrion due to be handed over?
The promoter has told MahaRERA December 2032. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Ganga Orrion been delayed?
Yes. The first date filed was July 2023. It now stands at December 2032, 9.4 years later.
What does a unit in Ganga Orrion cost?
Nothing has been registered here yet. The government values the units at ₹14,394 per square foot of carpet, which is the floor stamp duty is charged on and is normally below what anyone pays.
How many units are left in Ganga Orrion?
31 of 31 were still unsold at the promoter's last filing, in Shops, from 938–2,836 sq ft of carpet.
Are there complaints against Ganga Orrion?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Ganga Orrion?
Goel Eisha Developers, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100018964 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.