RERA registered P52100080938 Active
Azalea
Yerawada, Pune · Residential / Group Housing by Bkr Lifespaces LLP
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Azalea in Yerawada is MahaRERA-registered (P52100080938) and still under construction, with possession filed for October 2028. Buyers have already registered 10 sales here at a median ₹23,032 per sq ft of carpet — not an asking price. About 36% of the 28 units are sold. Bkr Lifespaces LLP is the promoter.
- Sold here at
- ₹23,032
- per sq ft, 10 registered sales
- Available
- 2, 4 BHK
- 18 left · 1,124–1,487 sq ft
- Now due
- Oct 2028
- 4 months later than first promised
Where this is
Yerawada, PMC, Pune, 411006
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Flat sizes on file
All 28 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 14 units · 9 available
4 BHK 14 units · 9 available
10 / 28
36% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 14 flats · 9 available
1,140 sq ft carpet as drawn, from 1,124–1,305 sq ft filed in this configuration
- Carpet, filed
- 1,140 sq ft
- Built-up
- about 1,368 sq ft
- Super built-up
- about 1,596 sq ft
Every room in this flat
Living and dining about 332 sq ft, Master bedroom about 221 sq ft, Second bedroom about 177 sq ft, Kitchen about 133 sq ft, Bath about 77 sq ft, Balcony about 77 sq ft, Second bath about 66 sq ft, Passage about 55 sq ft.
4 BHK 14 flats · 9 available
1,487 sq ft carpet as drawn, from 1,461–1,487 sq ft filed in this configuration
- Carpet, filed
- 1,487 sq ft
- Built-up
- about 1,784 sq ft
- Super built-up
- about 2,082 sq ft
Every room in this flat
Living and dining about 330 sq ft, Master bedroom about 220 sq ft, Second bedroom about 176 sq ft, Third bedroom about 143 sq ft, Kitchen about 132 sq ft, Fourth bedroom about 132 sq ft, Bath about 77 sq ft, Balcony about 77 sq ft, Passage about 77 sq ft, Second bath about 66 sq ft, Third bath about 55 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹16,644 to ₹27,235 per sq ft |
|---|---|
| Sold and booked | 10 sold, 0 booked |
| Still available | 18 flats, 1124–1487 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from June 2028 to October 2028, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Street, as filed | Azalea Road |
|---|---|
| Bounded north by | 9 Meter Road |
| Bounded east by | Final Plot No 54 |
| Bounded south by | Final Plot No 57 |
| Bounded west by | Final Plot No 26 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Bkr Lifespaces LLP |
|---|---|
| Registered office | 101, Vastushilpa, Mangala, Near Pmc Hq, Shivaji Nagar, Pune 411005 |
Professionals named on the filing
| Architect | GNA Architects CA/2011/51343 |
|---|---|
| Architect | Karan Darda Architects |
| Engineer | Er Sammedh Bankar reg/pmc/ste/2469/24 |
| Chartered Accountant | JPNR and Associates 193944 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report title report AZALEA.pdf | 23 April 2025 |
|---|---|
| Promoter's declaration, Form B 9 Declaration B Promoters.pdf | 24 March 2025 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100080938 |
| Promoter | Bkr Lifespaces LLP |
| Project type | Residential / Group Housing · Building development |
| Locality | Yerawada — Haveli taluka, pincode 411006 |
| Applied on | 29 March 2025 |
| Registered on | 25 August 2025 |
| Completion, as first filed | 30 June 2028 |
| Due | 30 October 2028 4 months later |
| Units declared | 28 |
| Units sold | 10 of 28 sold (36%), 18 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 25 August 2025 |
| Application reference | REA52100168462 |
| Current status | Active |
| Record last changed | 25 August 2025 · 13 months ago |
Where the sold count comes from, and whether it holds up. 10 of 28 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 28 flats and reaches the same answer — 10 sold, every one with money recorded as received against a named flat, and 18 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 25 August 2025.
Common questions
- Is Azalea registered with MahaRERA?
- Yes. It is registered as P52100080938, filed on 25 August 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Azalea due to be handed over?
- The promoter has told MahaRERA October 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Azalea been delayed?
- Yes. The first date filed was June 2028. It now stands at October 2028, 4 months later.
- What did buyers actually pay in Azalea?
- A median of ₹23,032 per square foot of carpet, across 10 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Azalea?
- 18 of 28 were still unsold at the promoter's last filing, in 2, 4 BHK, from 1,124–1,487 sq ft of carpet.
- Are there complaints against Azalea?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Azalea?
- Bkr Lifespaces LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100080938 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Yerawada
Stock image
- Nearby
- ₹9,936–21,204
- On offer
- 2, 3 BHK
- Due
- Dec 2031
- Units
- 152
- Carpet
- 534–1,030
- Typical flat
- ~₹1.1 crore
Stock image
- Due
- Apr 2029
- Units
- —
- Carpet
- —
- Typical unit
- —
Stock image
- Registered here
- ₹9,924
- On offer
- 1, 2, 3 BHK
- Due
- Apr 2029
- Units
- 193
- Carpet
- 456–1,111
- Sold at
- ₹82.5 lakh