RERA registered P52100077863 Active
Rajveer Garima Phase 1
Wakad, Pune · Residential / Group Housing by Waghere Associates
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Rajveer Garima Phase 1 in Wakad is MahaRERA-registered (P52100077863) and still under construction, with possession filed for April 2030. Buyers have already registered 80 sales here at a median ₹11,836 per sq ft of carpet — not an asking price. Waghere Associates is the promoter.
- Sold here at
- ₹11,836
- per sq ft, 80 registered sales
- Available
- 2, 3 BHK
- 8 left · 756–916 sq ft
- Now due
- Apr 2030
- 4 months later than first promised
Where this is
Wakad, PCMC, Pune, 411057
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 88 flats are filed unit by unit with the authority, the highest on floor 11. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 66 units · 7 available
3 BHK 22 units · 1 available
78 / 88
89% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 66 flats · 7 available
756 sq ft carpet as drawn, from 648–841 sq ft filed in this configuration
- Carpet, filed
- 756 sq ft
- Built-up
- about 907 sq ft
- Super built-up
- about 1,058 sq ft
Every room in this flat
Living and dining about 220 sq ft, Master bedroom about 147 sq ft, Second bedroom about 117 sq ft, Kitchen about 88 sq ft, Bath about 51 sq ft, Balcony about 51 sq ft, Second bath about 44 sq ft, Passage about 37 sq ft.
3 BHK 22 flats · 1 available
916 sq ft carpet as drawn, from 854–1,006 sq ft filed in this configuration
- Carpet, filed
- 916 sq ft
- Built-up
- about 1,099 sq ft
- Super built-up
- about 1,282 sq ft
Every room in this flat
Living and dining about 225 sq ft, Master bedroom about 150 sq ft, Second bedroom about 120 sq ft, Third bedroom about 98 sq ft, Kitchen about 90 sq ft, Bath about 53 sq ft, Balcony about 53 sq ft, Second bath about 45 sq ft, Passage about 45 sq ft, Third bath about 38 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹9,126 to ₹14,080 per sq ft |
|---|---|
| Sold and booked | 80 sold, 0 booked |
| Still available | 8 flats, 648–1006 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2029 to April 2030, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Wakad |
|---|---|
| Taluka | Mulshi |
| Street, as filed | Mulshi |
| Bounded north by | Property of Aura Real Estate Pvt Ltd |
| Bounded east by | Property belongs to Sunil Dilip and Asha Kaspate |
| Bounded south by | Property belongs to Gopal Vitthal Kaspate |
| Bounded west by | 24 Mtrs D P Road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Waghere Associates |
|---|---|
| Registered office | 960/1/19, B. R. Waghere Building, Tapovan Road, Pimprigaon, Pune 411017 |
Professionals named on the filing
| Architect | Manik Buchade CA/03/32518 |
|---|---|
| Engineer | Nitin Ashok Basode 7226606 |
| Chartered Accountant | A N J K & Co LLP 182099 |
| Chartered Accountant | G N Mantri & Associates 198137 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Legal title report_Highlighted_11zon.pdf | 28 October 2024 |
|---|---|
| Promoter's declaration, Form B Form B Declaration by Promoter_Highlighted.pdf | 28 October 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100077863 |
| Promoter | Waghere Associates |
| Project type | Residential / Group Housing · Building development |
| Locality | Wakad — Mulshi taluka, pincode 411057 |
| Applied on | 19 October 2024 |
| Registered on | 07 November 2024 |
| Completion, as first filed | 31 December 2029 |
| Due | 30 April 2030 4 months later |
| Units declared | 88 |
| Units sold | 78 of 88 sold (89%), 10 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 12 August 2026 |
| Application reference | REA52100165238 |
| Current status | Active |
| Record last changed | 09 June 2025 · 16 months ago |
Where the sold count comes from, and whether it holds up. 78 of 88 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 78 of 88 sold, leaving 10. The unit-by-unit list they file separately covers 88 flats and marks 80 sold with 8 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 09 June 2025.
Common questions
- Is Rajveer Garima Phase 1 registered with MahaRERA?
- Yes. It is registered as P52100077863, filed on 07 November 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Rajveer Garima Phase 1 due to be handed over?
- The promoter has told MahaRERA April 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Rajveer Garima Phase 1 been delayed?
- Yes. The first date filed was December 2029. It now stands at April 2030, 4 months later.
- What did buyers actually pay in Rajveer Garima Phase 1?
- A median of ₹11,836 per square foot of carpet, across 80 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Rajveer Garima Phase 1?
- 8 of 88 were still unsold at the promoter's last filing, in 2, 3 BHK, from 756–916 sq ft of carpet.
- Are there complaints against Rajveer Garima Phase 1?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Rajveer Garima Phase 1?
- Waghere Associates, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100077863 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Wakad
Stock image
- Nearby
- ₹10,653
- On offer
- 3 BHK + shops
1 complaint
- Due
- Apr 2028
- Units
- 108
- Carpet
- 349–1,243
- Typical unit
- ~₹90.8 lakh
Stock image
- Registered here
- ₹9,296
- On offer
- Multi-purpose + offices
- Due
- Apr 2027
- Units
- 49
- Carpet
- 122–1,379
- Sold at
- ₹17.3 lakh
Stock image
- Registered here
- ₹19,195
- On offer
- Showroom
- Due
- Apr 2027
- Units
- 81
- Carpet
- 122–784
- Sold at
- ₹32.1 lakh