Z Zomefy

RERA registered P52100019579 Completed

One Place - Wakad

Wakad, Pune · Commercial by Sai Mittal Associates

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

One Place - Wakad in Wakad is MahaRERA-registered (P52100019579) and was handed over in December 2024. No registered sale rate is on file for this project or its locality yet. About 96% of the 49 units are sold. 6 complaints sit on the filing. Sai Mittal Associates is the promoter.

Stock image, not a photograph of One Place - Wakad Stock image
Where
Wakad
pincode 411057
Price
Not filed
no agreement or valuation on the register
Available
2 units
2 left · 1,259–1,515 sq ft
Possession
Dec 2024
as filed with MahaRERA
A stock photograph, not One Place - Wakad. We have no picture of this site yet.

Where this is

Wakad, PCMC, Pune, 411057

Village
Pimpri Chinchawad (M Corp.)
Taluka
Haveli
Pincode
411057

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 49 units are filed unit by unit with the authority, the highest on floor 5. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Nothing filed here is a home. Every unit is registered as non-residential — shops, offices or similar — which is the promoter's own answer on the register rather than anything read off the areas below.

Configuration not filed 2 units · all available

1 unit 1259 sq ft 117.0 sq m as filed
1 unit 1515 sq ft 140.75 sq m as filed

Office Space 36 units · all sold

1 unit 147 sq ft 13.63 sq m as filed
1 unit 163 sq ft 15.17 sq m as filed
1 unit 164 sq ft 15.28 sq m as filed
6 units 165 sq ft 15.29 sq m as filed
3 units 167 sq ft 15.51–15.54 sq m as filed
7 units 216 sq ft 20.03–20.04 sq m as filed
2 units 219 sq ft 20.37–20.39 sq m as filed
2 units 220 sq ft 20.43–20.45 sq m as filed
1 unit 221 sq ft 20.57 sq m as filed
1 unit 227 sq ft 21.09 sq m as filed
1 unit 250 sq ft 23.22 sq m as filed
2 units 259 sq ft 24.02 sq m as filed
8 further sizes, 8 units between them
1 unit 257 sq ft 23.91 sq m as filed
1 unit 261 sq ft 24.29 sq m as filed
1 unit 461 sq ft 42.8 sq m as filed
1 unit 517 sq ft 48.03 sq m as filed
1 unit 542 sq ft 50.35 sq m as filed
1 unit 568 sq ft 52.74 sq m as filed
1 unit 694 sq ft 64.47 sq m as filed
1 unit 768 sq ft 71.34 sq m as filed

Shops 11 units · all sold

3 units 247 sq ft 22.97 sq m as filed
1 unit 267 sq ft 24.79 sq m as filed
3 units 326 sq ft 30.25 sq m as filed
1 unit 528 sq ft 49.07 sq m as filed
1 unit 659 sq ft 61.25 sq m as filed
1 unit 771 sq ft 71.6 sq m as filed
1 unit 786 sq ft 72.98 sq m as filed
Units sold

47 / 49

Nearly sold out

96% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.

Office Space 36 units · none available

216 sq ft carpet as drawn, from 147–768 sq ft filed in this configuration

Carpet, filed
216 sq ft
Built-up
about 259 sq ft
Super built-up
about 302 sq ft

Shops 11 units · none available

247 sq ft carpet as drawn, from 247–786 sq ft filed in this configuration

Carpet, filed
247 sq ft
Built-up
about 296 sq ft
Super built-up
about 346 sq ft

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

Timeline audit

Original proposed Dec 2024
Current status Handed over Dec 2024

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S no 194 is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Wakad
TalukaHaveli
Street, as filed Wakad Thergaon Road
Bounded north by S No 194 5 1
Bounded east by S No 206
Bounded south by S No 195 3
Bounded west by 24 mtr wide road s no 194

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerSai Mittal Associates
Registered officeS No. 194, 998, Petals, Kaspate Basti, Wakad, Wakad Thergaon Road, Pune 411057

Professionals named on the filing

Architect Solespace CA/92/14807
Engineer Manjri Desai
Chartered Accountant Priyanka Chordiya and Associates
Chartered Accountant SAC & Co LLP 154711

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

6 cases against this project, 6 with an order on record, filed between Jun 2023 and Aug 2025. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12502840 Aug 2025 Order passed Aug 2025
CC12502841 Aug 2025 Order passed Aug 2025
CC12502842 Aug 2025 Order passed Aug 2025
CC12502843 Aug 2025 Order passed Aug 2025
CC12502431 Jul 2025 Order passed Jul 2025
CC005000000258982 Jun 2023 Order passed Jun 2023

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

5 February 2019 is when an advocate last certified the title to this land
Title report Title Certificate Wakad.pdf 5 February 2019
Promoter's declaration, Form B Form B SAI MITTAL ASSOCIATES.pdf 14 November 2024 1 older version on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100019579
Promoter Sai Mittal Associates
Project typeCommercial · Building development
LocalityWakad — Haveli taluka, pincode 411057
Applied on06 February 2019
Registered on08 February 2019
Completion, as first filed30 December 2024
Handed over30 December 2024
Units declared49
Units sold 47 of 49 sold (96%), 2 still unsold
Complaints6 on record with MahaRERA
Certificate on file Original registration certificate, issued 09 September 2021
Application referenceREA52100049541
Current statusCompleted
Record last changed 08 February 2019 · over 7 years ago

Where the sold count comes from, and whether it holds up. 47 of 49 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 49 units and reaches the same answer — 47 sold, every one with money recorded as received against a named unit, and 2 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 08 February 2019.

Common questions

Is One Place - Wakad registered with MahaRERA?
Yes. It is registered as P52100019579, filed on 08 February 2019, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has One Place - Wakad been handed over?
Yes. The completion date on the register is December 2024.
Has One Place - Wakad been delayed?
No. December 2024 is the date first filed with the authority and it has not moved since.
How many units are left in One Place - Wakad?
2 of 49 were still unsold at the promoter's last filing, from 1,259–1,515 sq ft of carpet.
Are there complaints against One Place - Wakad?
6 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building One Place - Wakad?
Sai Mittal Associates, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100019579 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Wakad