Z Zomefy

RERA registered P52100032942 Completed

A R Imperia

Wakad, Pune · Residential / Group Housing by A R Realty

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

A R Imperia in Wakad is MahaRERA-registered (P52100032942) and was handed over in December 2024. Buyers have already registered 86 sales here at a median ₹7,947 per sq ft of carpet — not an asking price. About 100% of the 86 units are sold. 3 complaints sit on the filing. A R Realty is the promoter.

Stock image, not a photograph of A R Imperia Stock image
Where
Wakad
pincode 411057
Sold here at
₹7,947
per sq ft, 86 registered sales
Available
None left
every flat filed as sold or held
Possession
Dec 2024
as filed with MahaRERA
A stock photograph, not A R Imperia. We have no picture of this site yet.

Where this is

Wakad, PCMC, Pune, 411057

Street map of Wakad centred on the coordinate filed for A R Imperia, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Wakad
Taluka
Mulshi
Pincode
411057
Coordinates
18.597539, 73.805117

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 86 flats are filed unit by unit with the authority, the highest on floor 11. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 86 units · all sold

2 units 560 sq ft 52.0 sq m as filed
84 units 766 sq ft 71.16 sq m as filed
Units sold

86 / 86

Nearly sold out

100% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 86 flats · none available

766 sq ft carpet as drawn, from 560–766 sq ft filed in this configuration

Carpet, filed
766 sq ft
Built-up
about 919 sq ft
Super built-up
about 1,072 sq ft
Every room in this flat

Living and dining about 223 sq ft, Master bedroom about 149 sq ft, Second bedroom about 119 sq ft, Kitchen about 89 sq ft, Bath about 52 sq ft, Balcony about 52 sq ft, Second bath about 45 sq ft, Passage about 37 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹7,947 per sq ft of carpet, median of 86 registered sales
Range across those sales ₹7,479 to ₹9,444 per sq ft
Sold and booked 86 sold, 0 booked
Still available 0 flats, 560–766 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2024
Current status Handed over Dec 2024

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

SURVEY NO 113/4/2 P is the plot this project is built on, as filed
Revenue village Wakad
TalukaMulshi
Street, as filed WAKAD
Bounded north by REMAINING PROPERTY OUT OF S NO 113 4 2
Bounded east by PROPERTY OUT OF S NO 113 3B 3A
Bounded south by PROPERTY OUT OF S NO 113 3B 3A
Bounded west by PROPERTY OUT OF S NO 113 2 1

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerA R Realty
Registered officeH 101, La Vida Loca Commercial Building, Pimple Saudagar, Pune 411027

Professionals named on the filing

Architect Sachin Sutar CA/95/18039
Engineer Dhanaji Dattatray Shinde
Engineer Mr Siddharth Galgale
Chartered Accountant Ravi Talreja And Associates 140851
Chartered Accountant Ravi Talreja 132650

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

3 cases against this project, 3 with an order on record, filed between Sep 2024 and Sep 2024. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12400284 Sep 2024 Order passed Sep 2024
CC12400283 Sep 2024 Order passed Sep 2024
CC12400285 Sep 2024 Order passed Sep 2024

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

5 January 2022 is when an advocate last certified the title to this land
Title report Format A revised_compressed.pdf 5 January 2022 1 older version on file
Promoter's declaration, Form B Form B_compressed.pdf 27 December 2021

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100032942
Promoter A R Realty
Project typeResidential / Group Housing · Building development
LocalityWakad — Mulshi taluka, pincode 411057
Applied on31 December 2021
Registered on02 February 2022
Completion, as first filed31 December 2024
Handed over31 December 2024
Units declared86
Units sold All 86 sold
Complaints3 on record with MahaRERA
Certificate on file Original registration certificate, issued 07 November 2022
Application referenceREA52100101345
Current statusCompleted
Record last changed 21 October 2022 · over 3 years ago

Where the sold count comes from, and whether it holds up. 86 of 86 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 86 flats and reaches the same answer — 86 sold, every one with money recorded as received against a named flat, and 0 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 21 October 2022.

Common questions

Is A R Imperia registered with MahaRERA?
Yes. It is registered as P52100032942, filed on 02 February 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has A R Imperia been handed over?
Yes. The completion date on the register is December 2024.
Has A R Imperia been delayed?
No. December 2024 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in A R Imperia?
A median of ₹7,947 per square foot of carpet, across 86 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in A R Imperia?
None. All 86 are filed as sold or booked.
Are there complaints against A R Imperia?
3 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building A R Imperia?
A R Realty, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100032942 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Wakad