RERA registered P52100076743 Active
Springshire
Wagholi, Pune · Residential / Group Housing by Kolte-Patil Developers Limited
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Springshire in Wagholi is MahaRERA-registered (P52100076743) and still under construction, with possession filed for July 2028. Buyers have already registered 438 sales here at a median ₹9,478 per sq ft of carpet — not an asking price. About 70% of the 632 units are sold. Kolte-Patil Developers Limited is the promoter.
- Sold here at
- ₹9,478
- per sq ft, 438 registered sales
- Available
- 3 BHK, Shops
- 187 left · 245–870 sq ft
- Now due
- Jul 2028
- 4 months later than first promised
Where this is
Wagholi, PMC, Pune, 412207
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 632 units are filed unit by unit with the authority, the highest on floor 13. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
3 BHK 574 units · 136 available
Shops 58 units · 51 available
445 / 632
70% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
3 BHK 574 units · 136 available
870 sq ft carpet as drawn, from 665–870 sq ft filed in this configuration
- Carpet, filed
- 870 sq ft
- Built-up
- about 1,044 sq ft
- Super built-up
- about 1,218 sq ft
Every room in this unit
Living and dining about 214 sq ft, Master bedroom about 143 sq ft, Second bedroom about 114 sq ft, Third bedroom about 93 sq ft, Kitchen about 86 sq ft, Bath about 50 sq ft, Balcony about 50 sq ft, Second bath about 43 sq ft, Passage about 43 sq ft, Third bath about 36 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹8,911 to ₹10,983 per sq ft |
|---|---|
| Sold and booked | 0 sold, 445 booked |
| Still available | 187 units, 245–870 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
5 further sales are set aside. They divide out beyond ₹23,696 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.
Timeline audit
Revised projection
The completion date has moved from March 2028 to July 2028, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | WAGHOLI · shown on this site as Wagholi |
|---|---|
| Taluka | Haveli |
| Street, as filed | Wagholi |
| Bounded north by | 15 Mtr wide road |
| Bounded east by | School building in amenity plot |
| Bounded south by | GAT no 621 and 624 |
| Bounded west by | 12 Mtr wide road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Kolte-Patil Developers Limited |
|---|---|
| Registered office | 7th Floor And 8th Floor, Cts No. 14 (P), City Bay, Dhole Patil Road, 17 Boat Club Road, Pune 411001 |
| Registered agents | 1 licensed agent may sell this project |
Professionals named on the filing
| Architect | Jagadish P Deshpande |
|---|---|
| Engineer | Gaurang Joshi |
| Engineer | Tushar Patil |
| Chartered Accountant | SPCM & Associates 157271 |
| Chartered Accountant | Vidhi S Shah& Associates |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report TSR dtd 31-05-2024_compressed.pdf | 12 June 2024 |
|---|---|
| Promoter's declaration, Form B Form B - KPDL - Sprinhshire - 01062024.pdf | 12 June 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100076743 |
| Promoter | Kolte-Patil Developers Limited |
| Project type | Residential / Group Housing · Building development |
| Locality | Wagholi — Haveli taluka, pincode 412207 |
| Applied on | 12 June 2024 |
| Registered on | 25 June 2024 |
| Completion, as first filed | 31 March 2028 |
| Due | 31 July 2028 4 months later |
| Units declared | 632 |
| Units sold | 445 of 632 sold (70%), 187 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 26 June 2024 |
| Application reference | REA52100163009 |
| Current status | Active |
| Record last changed | 25 June 2024 · over 2 years ago 2 years untouched |
Where the sold count comes from, and whether it holds up. 445 of 632 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 632 units and reaches the same answer — 0 sold, 445 booked with a price agreed but nothing received yet, and 187 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 25 June 2024.
MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is Springshire registered with MahaRERA?
- Yes. It is registered as P52100076743, filed on 25 June 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Springshire due to be handed over?
- The promoter has told MahaRERA July 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Springshire been delayed?
- Yes. The first date filed was March 2028. It now stands at July 2028, 4 months later.
- What did buyers actually pay in Springshire?
- A median of ₹9,478 per square foot of carpet, across 438 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Springshire?
- 187 of 632 were still unsold at the promoter's last filing, in 3 BHK + shops, from 245–870 sq ft of carpet.
- Are there complaints against Springshire?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Springshire?
- Kolte-Patil Developers Limited, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100076743 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Wagholi
Stock image
- Registered here
- ₹7,002
- On offer
- 2 BHK + shops
1 complaint
- Due
- Jun 2027
- Units
- 78
- Carpet
- 301–700
- Sold at
- ₹47.7 lakh
Stock image
- Due
- Apr 2028
- Units
- 505
- Carpet
- —
- Typical unit
- —
Stock image
- Registered here
- ₹6,424
- On offer
- 2 BHK
- Due
- Dec 2026
- Units
- 110
- Carpet
- 617
- Sold at
- ₹38 lakh