Z Zomefy

RERA registered P52100054457 Active

Micasaa Phase III

Wagholi, Pune · Residential / Group Housing by Gagan Global Developers

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Micasaa Phase III in Wagholi is MahaRERA-registered (P52100054457) and still under construction, with possession filed for October 2028. Buyers have already registered 89 sales here at a median ₹7,322 per sq ft of carpet — not an asking price. About 38% of the 234 units are sold. Gagan Global Developers is the promoter.

Stock image, not a photograph of Micasaa Phase III Stock image
Where
Wagholi
pincode 412207
Sold here at
₹7,322
per sq ft, 89 registered sales
Available
2 BHK, Duplex
145 left · 588–614 sq ft
Now due
Oct 2028
4 months later than first promised
A stock photograph, not Micasaa Phase III. We have no picture of this site yet.

Where this is

Wagholi, Rural, Pune, 412207

Street map of Wagholi centred on the coordinate filed for Micasaa Phase III, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Pune (M Corp.)
Taluka
Pune City
Pincode
412207
Coordinates
18.575207, 74.000416

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 234 flats are filed unit by unit with the authority, the highest on floor 15. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 233 units · 144 available

114 units 588 sq ft 54.59 sq m as filed
119 units 614 sq ft 57.0–57.08 sq m as filed

Duplex 1 unit · all available

1 unit 614 sq ft 57.08 sq m as filed
Units sold

89 / 234

Early sales

38% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 233 flats · 144 available

614 sq ft carpet as drawn, from 588–614 sq ft filed in this configuration

Carpet, filed
614 sq ft
Built-up
about 737 sq ft
Super built-up
about 860 sq ft
Every room in this flat

Living and dining about 179 sq ft, Master bedroom about 119 sq ft, Second bedroom about 95 sq ft, Kitchen about 72 sq ft, Bath about 42 sq ft, Balcony about 42 sq ft, Second bath about 36 sq ft, Passage about 30 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹7,322 per sq ft of carpet, median of 89 registered sales
Range across those sales ₹6,673 to ₹7,960 per sq ft
Sold and booked 71 sold, 18 booked
Still available 145 flats, 588–614 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jun 2028
Current status Due Oct 2028

Revised projection

The completion date has moved from June 2028 to October 2028, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

GAT NO 878P 879P is the plot this project is built on, as filed
Revenue village Pune (M Corp.) · shown on this site as Wagholi
TalukaPune City
Street, as filed Kesnand Road
Bounded north by Adj Gat No 879P proposed 36M wide Road to North
Bounded east by Adj Gat No 877 878P to the East
Bounded south by Adj Gat No 879P and 880 to South
Bounded west by Adj Gat No885 886 and 887 to the West

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerGagan Global Developers
Registered office308, A/B, A/B City Point, Dholepatilroad, Opposite To Railway Station, Pune 411001
Registered agents 1 licensed agent may sell this project

Professionals named on the filing

Architect Parvej Jamadar & Associates 356
Engineer Shivkumar Shetty
Chartered Accountant CA Sunny Thawani 161385

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

21 September 2023 is when an advocate last certified the title to this land
Title report RERA_Legal_Title_Report - GGD_compressed.pdf 21 September 2023
Promoter's declaration, Form B Form B Affidavit_compressed.pdf 25 October 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100054457
Promoter Gagan Global Developers
Project typeResidential / Group Housing · Building development
LocalityWagholi — Pune City taluka, pincode 412207
Applied on25 September 2023
Registered on25 January 2024
Completion, as first filed30 June 2028
Due30 October 2028 4 months later
Units declared234
Units sold 89 of 234 sold (38%), 145 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 25 January 2024
Application referenceREA52100147009
Current statusActive
Record last changed 25 January 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 89 of 234 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 234 flats and reaches the same answer — 71 sold, every one with money recorded as received against a named flat, 18 booked with a price agreed but nothing received yet, and 145 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 25 January 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Micasaa Phase III registered with MahaRERA?
Yes. It is registered as P52100054457, filed on 25 January 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Micasaa Phase III due to be handed over?
The promoter has told MahaRERA October 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Micasaa Phase III been delayed?
Yes. The first date filed was June 2028. It now stands at October 2028, 4 months later.
What did buyers actually pay in Micasaa Phase III?
A median of ₹7,322 per square foot of carpet, across 89 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Micasaa Phase III?
145 of 234 were still unsold at the promoter's last filing, in 2 BHK + duplex, from 588–614 sq ft of carpet.
Are there complaints against Micasaa Phase III?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Micasaa Phase III?
Gagan Global Developers, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100054457 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Wagholi

Stock image, not a photograph of Tulsi Villa Stock image
Under construction

Tulsi Villa

Vinod Chandrakant Magar ( Prop. YASHODA PROPERTIES C) · Wagholi

100 sold
Due
Dec 2026
Units
20
Carpet
Typical unit
P52100055180
Stock image, not a photograph of Tulsi Vrindavan Stock image
Registered here
₹7,649
On offer
2 BHK
Under construction

Tulsi Vrindavan

Yashodha Associates And Company · Wagholi

26 sold
Slipped 4 months
Due
Apr 2030
Units
54
Carpet
623–678
Sold at
₹49.9 lakh
P52100080737