RERA registered P52100028315 Active
Mansha Phase-Ii
Wagholi, Pune · Residential / Group Housing by M/S Mangal Shanti Developement
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Mansha Phase-Ii in Wagholi is MahaRERA-registered (P52100028315) and still under construction, with possession filed for June 2027. Buyers have already registered 65 sales here at a median ₹7,002 per sq ft of carpet — not an asking price. About 86% of the 78 units are sold. 1 complaint sits on the filing. M/S Mangal Shanti Developement is the promoter.
- Sold here at
- ₹7,002
- per sq ft, 65 registered sales
- Available
- 2 BHK, Shops
- 11 left · 301–700 sq ft
- Now due
- Jun 2027
- 2 years later than first promised
Where this is
Wagholi, PMC, Pune, 412207
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 78 units are filed unit by unit with the authority, the highest on floor 15. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 70 units · 5 available
Shops 8 units · 6 available
67 / 78
86% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 70 units · 5 available
640 sq ft carpet as drawn, from 640–700 sq ft filed in this configuration
- Carpet, filed
- 640 sq ft
- Built-up
- about 768 sq ft
- Super built-up
- about 896 sq ft
Every room in this unit
Living and dining about 186 sq ft, Master bedroom about 124 sq ft, Second bedroom about 99 sq ft, Kitchen about 75 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹6,109 to ₹8,693 per sq ft |
|---|---|
| Sold and booked | 67 sold, 0 booked |
| Still available | 11 units, 301–700 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from June 2025 to June 2027, 2 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | WAGHOLI · shown on this site as Wagholi |
|---|---|
| Taluka | Haveli |
| Street, as filed | Opp Wagheshwar Temple, Near Shankar Parvati Karyalay , PMC |
| Bounded north by | MANSHA AMENITY PLOT |
| Bounded east by | CLUB HOUSE |
| Bounded south by | B-BUILDING MANSHA |
| Bounded west by | OPEN PLOT |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | M/S Mangal Shanti Developement |
|---|---|
| Registered office | Flat No 2 & 3, Mangal House, Vasant Bautg Society, Bibewadi, Pune 411037 |
Professionals named on the filing
| Architect | MrJay Aeram CA-93/15811 |
|---|---|
| Engineer | Pro Construction Management NA |
| Chartered Accountant | A N J K & Co LLP 182099 |
| Chartered Accountant | Agrawal Dhannawat Poddar & Co. 117624 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
1 case against this project, 0 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC12602253 | Apr 2026 | No order on record |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report TITLE SERCH REPORT-1.pdf | 25 January 2021 |
|---|---|
| Promoter's declaration, Form B Form B -Declaration by Promoter.pdf | 15 October 2024 1 older version on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100028315 |
| Promoter | M/S Mangal Shanti Developement |
| Project type | Residential / Group Housing · Building development |
| Locality | Wagholi — Haveli taluka, pincode 412207 |
| Applied on | 11 February 2021 |
| Registered on | 18 February 2021 |
| Completion, as first filed | 30 June 2025 |
| Due | 30 June 2027 2 years later |
| Units declared | 78 |
| Units sold | 67 of 78 sold (86%), 11 still unsold |
| Complaints | 1 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 21 July 2026 |
| Application reference | REA52100085040 |
| Current status | Active |
| Record last changed | 27 July 2026 · 2 months ago |
Where the sold count comes from, and whether it holds up. 67 of 78 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 78 units and reaches the same answer — 67 sold, every one with money recorded as received against a named unit, and 11 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 27 July 2026.
Common questions
- Is Mansha Phase-Ii registered with MahaRERA?
- Yes. It is registered as P52100028315, filed on 18 February 2021, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Mansha Phase-Ii due to be handed over?
- The promoter has told MahaRERA June 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Mansha Phase-Ii been delayed?
- Yes. The first date filed was June 2025. It now stands at June 2027, 2 years later.
- What did buyers actually pay in Mansha Phase-Ii?
- A median of ₹7,002 per square foot of carpet, across 65 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Mansha Phase-Ii?
- 11 of 78 were still unsold at the promoter's last filing, in 2 BHK + shops, from 301–700 sq ft of carpet.
- Are there complaints against Mansha Phase-Ii?
- 1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Mansha Phase-Ii?
- M/S Mangal Shanti Developement, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100028315 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Wagholi
Stock image
- Nearby
- ₹6,638–9,339
- On offer
- 1, 2 BHK
- Due
- Dec 2028
- Units
- 23
- Carpet
- 464–673
- Typical flat
- ~₹52 lakh
Stock image
- Nearby
- ₹6,638–9,339
- On offer
- 1, 2 BHK + shops
- Due
- Mar 2031
- Units
- 20
- Carpet
- 197–738
- Typical unit
- ~₹38.6 lakh
Stock image
- Registered here
- ₹7,631
- On offer
- 1, 2, 3 BHK
- Due
- Dec 2027
- Units
- 72
- Carpet
- 503–851
- Sold at
- ₹49.9 lakh