RERA registered P52100077450 Active
Indraprastha
Wagholi, Pune · Residential / Group Housing by Zenith Buildcon
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Indraprastha in Wagholi is MahaRERA-registered (P52100077450) and still under construction, with possession filed for April 2029. Buyers have already registered 32 sales here at a median ₹9,402 per sq ft of carpet — not an asking price. About 42% of the 77 units are sold. Zenith Buildcon is the promoter.
- Sold here at
- ₹9,402
- per sq ft, 32 registered sales
- Available
- 1, 2 BHK
- 18 left · 436–978 sq ft
- Now due
- Apr 2029
- 4 months later than first promised
Where this is
Wagholi, PMC, Pune, 412207
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 77 flats are filed unit by unit with the authority, the highest on floor 10. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 26 units · 9 available
2 BHK 43 units · 7 available
Configuration not filed 8 units · 2 available
32 / 77
42% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 26 flats · 9 available
461 sq ft carpet as drawn, from 436–600 sq ft filed in this configuration
- Carpet, filed
- 461 sq ft
- Built-up
- about 553 sq ft
- Super built-up
- about 645 sq ft
Every room in this flat
Living and dining about 173 sq ft, Master bedroom about 115 sq ft, Kitchen about 69 sq ft, Bath about 40 sq ft, Balcony about 40 sq ft, Passage about 23 sq ft.
2 BHK 43 flats · 7 available
604 sq ft carpet as drawn, from 456–783 sq ft filed in this configuration
- Carpet, filed
- 604 sq ft
- Built-up
- about 725 sq ft
- Super built-up
- about 846 sq ft
Every room in this flat
Living and dining about 176 sq ft, Master bedroom about 117 sq ft, Second bedroom about 94 sq ft, Kitchen about 70 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Second bath about 35 sq ft, Passage about 29 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹5,664 to ₹15,121 per sq ft |
|---|---|
| Sold and booked | 32 sold, 0 booked |
| Still available | 18 flats, 436–978 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2028 to April 2029, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | WAGHOLI · shown on this site as Wagholi |
|---|---|
| Taluka | Haveli |
| Street, as filed | KESANAND ROAD |
| Bounded north by | GAT NO 652 |
| Bounded east by | GAT NO 655 657 AND 659 |
| Bounded south by | KESNAND ROAD |
| Bounded west by | GAT NO 651 AND 653 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Zenith Buildcon |
|---|---|
| Registered office | Office No 04, 52, 1st Floor, Cts No 52, Near Yash Medical And Hdfc Bank, Koregaon Bhima, Pune 412208 |
Professionals named on the filing
| Architect | Santosh Raskar CA/97/21911 |
|---|---|
| Engineer | Tejas A Bhosure |
| Chartered Accountant | Dcrk And Associates 125061 |
| Chartered Accountant | Omkar U. Khude & Company 160795 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Title and Search_11zon (1).pdf | 28 June 2024 |
|---|---|
| Promoter's declaration, Form B Form B Zenith Buildcon_11zon.pdf | 23 May 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100077450 |
| Promoter | Zenith Buildcon |
| Project type | Residential / Group Housing · Building development |
| Locality | Wagholi — Haveli taluka, pincode 412207 |
| Applied on | 27 May 2024 |
| Registered on | 16 August 2024 |
| Completion, as first filed | 31 December 2028 |
| Due | 30 April 2029 4 months later |
| Units declared | 77 |
| Units sold | 32 of 77 sold (42%), 45 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 16 August 2024 |
| Application reference | REA52100160536 |
| Current status | Active |
| Record last changed | 16 August 2024 · over 2 years ago 2 years untouched |
Where the sold count comes from, and whether it holds up. 32 of 77 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 77 flats and reaches the same answer — 32 sold, every one with money recorded as received against a named flat, and 18 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 16 August 2024.
MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is Indraprastha registered with MahaRERA?
- Yes. It is registered as P52100077450, filed on 16 August 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Indraprastha due to be handed over?
- The promoter has told MahaRERA April 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Indraprastha been delayed?
- Yes. The first date filed was December 2028. It now stands at April 2029, 4 months later.
- What did buyers actually pay in Indraprastha?
- A median of ₹9,402 per square foot of carpet, across 32 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Indraprastha?
- 18 of 77 were still unsold at the promoter's last filing, in 1, 2 BHK, from 436–978 sq ft of carpet.
- Are there complaints against Indraprastha?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Indraprastha?
- Zenith Buildcon, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100077450 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Wagholi
Stock image
- Registered here
- ₹11,133
- On offer
- 2, 3 BHK
1 complaint
- Due
- May 2029
- Units
- 334
- Carpet
- 852–1,253
- Sold at
- ₹1.1 crore
Stock image
- Due
- Apr 2028
- Units
- —
- Carpet
- —
- Typical flat
- —
Stock image
- Nearby
- ₹9,339
- On offer
- 2 BHK
- Due
- Apr 2028
- Units
- 35
- Carpet
- 578–688
- Typical flat
- ~₹59.2 lakh