RERA registered PR1260002600598 Active
Florina Phase Ii
Varulwadi, Pune · Residential / Group Housing by Deepali Buildcon
Official record Updated from the register 21 November 2026. Anything filed since then is not here yet.
In short
Florina Phase Ii in Varulwadi is MahaRERA-registered (PR1260002600598) and still under construction, with possession filed for July 2028. Buyers have already registered 23 sales here at a median ₹4,308 per sq ft of carpet — not an asking price. About 32% of the 72 units are sold. Deepali Buildcon is the promoter.
- Sold here at
- ₹4,308
- per sq ft, 23 registered sales
- Available
- 1, 2 BHK
- 49 left · 569–794 sq ft
- Now due
- Jul 2028
- 4 months later than first promised
Varulwadi, Junnar, Pune, 410504
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 72 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK Residences
2 BHK Residences
Carpet Area vs. Loading Factor Arithmetic
How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)
| Unit Configuration | Statutory RERA Carpet (Actual) | Approx Built-up (+20%) | Super Built-up (+40% Loading) | Available Inventory |
|---|---|---|---|---|
| 1 BHK | 569 – 794 sq ft (52.86 – 73.74 sq m) | ~683 – 953 sq ft | ~797 – 1112 sq ft | 16 left of 30 |
| 2 BHK | 618 – 696 sq ft (57.4 – 64.7 sq m) | ~742 – 835 sq ft | ~865 – 974 sq ft | 33 left of 42 |
23 / 72
32% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 30 flats · 16 available
569 sq ft carpet as drawn, from 569–794 sq ft filed in this configuration
- Carpet, filed
- 569 sq ft
- Built-up
- about 683 sq ft
- Super built-up
- about 797 sq ft
Every room in this flat
Living and dining about 213 sq ft, Master bedroom about 142 sq ft, Kitchen about 85 sq ft, Bath about 50 sq ft, Balcony about 50 sq ft, Passage about 28 sq ft.
2 BHK 42 flats · 33 available
618 sq ft carpet as drawn, from 618–696 sq ft filed in this configuration
- Carpet, filed
- 618 sq ft
- Built-up
- about 742 sq ft
- Super built-up
- about 865 sq ft
Every room in this flat
Living and dining about 180 sq ft, Master bedroom about 120 sq ft, Second bedroom about 96 sq ft, Kitchen about 72 sq ft, Bath about 42 sq ft, Balcony about 42 sq ft, Second bath about 36 sq ft, Passage about 30 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹2,602 to ₹5,273 per sq ft |
|---|---|
| Sold and booked | 23 sold, 0 booked |
| Still available | 49 flats, 569–794 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Revised delivery projection
The completion date has moved from March 2028 to July 2028, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Varulwadi |
|---|---|
| Taluka | Junnar |
| Street, as filed | - |
| Bounded north by | PROPERTY OF SUDHA BALASAHEB MEHER |
| Bounded east by | REMAINING PROPERTY OF RAMESH MEHER AND RAJESH MEHER |
| Bounded south by | MSEB WALL |
| Bounded west by | ROAD |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Deepali Buildcon |
|---|---|
| Registered office | Khodad Road, Narayangaon, Pune 410504 |
Professionals named on the filing
| Architect | Swapnil Parashar CA/08/42879 |
|---|---|
| Engineer | Aniket Laxman Pawale 17019375 |
| Chartered Accountant | Amir Tamboli 162009 |
| Chartered Accountant | Shafioddin Shaikh 170495 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Updated Search and Title report dated 29-04-2026.pdf | 30 April 2026 1 older version on file |
|---|---|
| Conveyance deed Warulwadi 7-12 10-12-3.pdf | 21 March 2026 3 older versions on file |
| Promoter's declaration, Form B Notarized Form B.pdf | 4 February 2026 |
| Annexure A declaration Anex A Declaration Cum Undertaking.pdf | 4 February 2026 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PR1260002600598 |
| Promoter | Deepali Buildcon |
| Project type | Residential / Group Housing · Building development |
| Locality | Varulwadi — Junnar taluka, pincode 410504 |
| Applied on | 27 February 2026 |
| Registered on | 01 June 2026 |
| Completion, as first filed | 31 March 2028 |
| Due | 31 July 2028 4 months later |
| Units declared | 72 |
| Units sold | 23 of 72 sold (32%), 49 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 01 June 2026 |
| Application reference | ACK03022606426 |
| Current status | Active |
| Record last changed | 01 June 2026 · 6 months ago |
Where the sold count comes from, and whether it holds up. 23 of 72 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 72 flats and reaches the same answer — 23 sold, every one with money recorded as received against a named flat, and 49 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 01 June 2026.
- Is Florina Phase Ii registered with MahaRERA?
- Yes. It is registered as PR1260002600598, filed on 01 June 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Florina Phase Ii due to be handed over?
- The promoter has told MahaRERA July 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Florina Phase Ii been delayed?
- Yes. The first date filed was March 2028. It now stands at July 2028, 4 months later.
- What did buyers actually pay in Florina Phase Ii?
- A median of ₹4,308 per square foot of carpet, across 23 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Florina Phase Ii?
- 49 of 72 were still unsold at the promoter's last filing, in 1, 2 BHK, from 569–794 sq ft of carpet.
- Are there complaints against Florina Phase Ii?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Florina Phase Ii?
- Deepali Buildcon, as the promoter named on the registration.
Verify Government Filings Yourself
This dossier restates public records as filed on 21 November 2026. The authority's own registry page for PR1260002600598 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.
MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.
Other projects in Varulwadi
Stock image
- Locality median
- ₹4,308
- On offer
- Row Houses
- Due
- Dec 2026
- Units
- 22
- Carpet
- 854–860
- Typical flat
- ~₹36.9 lakh
Stock image
- Registered here
- ₹4,384
- On offer
- 1, 2 BHK + shops
- Due
- Apr 2028
- Units
- 98
- Carpet
- 141–568
- Sold at
- ₹17 lakh
Stock image
- Registered here
- ₹4,118
- On offer
- 2 BHK +2 more
- Done
- Nov 2027
- Units
- 37
- Carpet
- 198–720
- Sold at
- ₹28.8 lakh