Sky Tree Tower

Vadgaon Maval, Pune · Others by Kiran Buildcon

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Sky Tree Tower in Vadgaon Maval is MahaRERA-registered (P52100078260) and still under construction, with possession filed for May 2027. Buyers have already registered 3 sales here at a median ₹5,606 per sq ft of carpet — not an asking price. About 8% of the 40 units are sold. Kiran Buildcon is the promoter.

Stock image, not a photograph of Sky Tree Tower Stock image
Where
Vadgaon Maval
pincode 412106
Sold here at
₹5,606
per sq ft, 3 registered sales
Available
1 BHK, 2 BHK, Shops
37 left · 197–581 sq ft
Now due
May 2027
4 months later than first promised
A stock photograph, not Sky Tree Tower. We have no picture of this site yet.

Where this is

Vadgaon Maval, Maval, Pune, 412106

Village
Wadagaon (CT)
Taluka
Mawal
Pincode
412106
Coordinates
18.726120, 73.650915

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 40 units are filed unit by unit with the authority, the highest on floor 6. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 12 units · all available

12 units 331 sq ft 30.73 sq m as filed

2 BHK 24 units · 21 available

6 units 517 sq ft 48.06 sq m as filed
5 units 518 sq ft 48.14 sq m as filed
1 unit 528 sq ft 49.08 sq m as filed
6 units 549 sq ft 51.01 sq m as filed
5 units 571 sq ft 53.07 sq m as filed
1 unit 581 sq ft 53.97 sq m as filed

Shops 4 units · all available

4 units 197 sq ft 18.3 sq m as filed
Units sold

3 / 40

Early sales

8% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

1 BHK 12 units · 12 available

331 sq ft carpet as drawn

Carpet, filed
331 sq ft
Built-up
about 397 sq ft
Super built-up
about 463 sq ft
Every room in this unit

Living and dining about 124 sq ft, Master bedroom about 83 sq ft, Kitchen about 50 sq ft, Bath about 29 sq ft, Balcony about 29 sq ft, Passage about 17 sq ft.

2 BHK 24 units · 21 available

517 sq ft carpet as drawn, from 517–581 sq ft filed in this configuration

Carpet, filed
517 sq ft
Built-up
about 620 sq ft
Super built-up
about 724 sq ft
Every room in this unit

Living and dining about 151 sq ft, Master bedroom about 100 sq ft, Second bedroom about 80 sq ft, Kitchen about 60 sq ft, Bath about 35 sq ft, Balcony about 35 sq ft, Second bath about 30 sq ft, Passage about 25 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹5,606 per sq ft of carpet, median of 3 registered sales
Range across those sales ₹5,602 to ₹5,790 per sq ft
Sold and booked 3 sold, 0 booked
Still available 37 units, 197–581 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jan 2027
Current status Due May 2027

Revised projection

The completion date has moved from January 2027 to May 2027, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

284/1 is the plot this project is built on, as filed
Revenue village Wadagaon (CT) · shown on this site as Vadgaon Maval
TalukaMawal
Street, as filed Talegaon- Urse Road
Bounded north by Gat no 284-1 Part
Bounded east by Talegaon-Urse Road
Bounded south by Mark Buildcon
Bounded west by Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerKiran Buildcon
Registered officeSr No 383 Plot No 279, 279, Sarthak Bunglow, Talegaon Dabhade Nagarparishad Road, Fun Square Cinema, Kalokhewadi, Pune 410506

Professionals named on the filing

Architect Aniruddhe T Shinde CA/98/23512
Engineer Ganesh Bhalerao
Chartered Accountant MAHESH mALHOTRA 044913

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

16 October 2024 is when an advocate last certified the title to this land
Title report rera Search Report Gat No 284-signed_compressed.pdf 16 October 2024
Promoter's declaration, Form B FORM B.pdf 16 October 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100078260
Promoter Kiran Buildcon
Project typeOthers · Building development
LocalityVadgaon Maval — Mawal taluka, pincode 412106
Applied on23 October 2024
Registered on04 December 2024
Completion, as first filed31 January 2027
Due31 May 2027 4 months later
Units declared40
Units sold 3 of 40 sold (8%), 37 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 04 December 2024
Application referenceREA52100165318
Current statusActive
Record last changed 04 December 2024 · 22 months ago

Where the sold count comes from, and whether it holds up. 3 of 40 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 40 units and reaches the same answer — 3 sold, every one with money recorded as received against a named unit, and 37 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 04 December 2024.

Common questions

Is Sky Tree Tower registered with MahaRERA?
Yes. It is registered as P52100078260, filed on 04 December 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Sky Tree Tower due to be handed over?
The promoter has told MahaRERA May 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Sky Tree Tower been delayed?
Yes. The first date filed was January 2027. It now stands at May 2027, 4 months later.
What did buyers actually pay in Sky Tree Tower?
A median of ₹5,606 per square foot of carpet, across 3 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Sky Tree Tower?
37 of 40 were still unsold at the promoter's last filing, in 1, 2 BHK + shops, from 197–581 sq ft of carpet.
Are there complaints against Sky Tree Tower?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Sky Tree Tower?
Kiran Buildcon, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100078260 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Vadgaon Maval

Stock image, not a photograph of Rkl Indrayani City Stock image
Registered here
₹5,479
On offer
1, 2 BHK + shops
Under construction

Rkl Indrayani City

R K Lunkad Housing Company · Vadgaon Maval

7 sold
Slipped 4 months
Due
Apr 2032
Units
172
Carpet
204–630
Sold at
₹25.5 lakh
P52100080330