RERA registered P52100016541 Active
Green Fantasy Phase-I
Uruli Kanchan, Pune · Others by Shree Mangalmurti Associates Phase-I
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Green Fantasy Phase-I in Uruli Kanchan is MahaRERA-registered (P52100016541) and still under construction, with possession filed for December 2027. Buyers have already registered 91 sales here at a median ₹6,280 per sq ft of carpet — not an asking price. About 40% of the 278 units are sold. 2 complaints sit on the filing. Shree Mangalmurti Associates Phase-I is the promoter.
- Sold here at
- ₹6,280
- per sq ft, 91 registered sales
- Available
- 1 BHK, 2 BHK, Shops
- 67 left · 229–434 sq ft
- Now due
- Dec 2027
- 4.8 years later than first promised
Where this is
Uruli Kanchan, PMRDA, Pune, 412202
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 278 units are filed unit by unit with the authority, the highest on floor 10. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 179 units · 48 available
12 further sizes, 45 units between them
2 BHK 78 units · 18 available
3 BHK 1 unit · all sold
Shops 20 units · 1 available
110 / 278
40% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 179 units · 48 available
304 sq ft carpet as drawn, from 218–304 sq ft filed in this configuration
- Carpet, filed
- 304 sq ft
- Built-up
- about 365 sq ft
- Super built-up
- about 426 sq ft
Every room in this unit
Living and dining about 114 sq ft, Master bedroom about 76 sq ft, Kitchen about 46 sq ft, Bath about 27 sq ft, Balcony about 27 sq ft, Passage about 15 sq ft.
2 BHK 78 units · 18 available
434 sq ft carpet as drawn, from 358–434 sq ft filed in this configuration
- Carpet, filed
- 434 sq ft
- Built-up
- about 521 sq ft
- Super built-up
- about 608 sq ft
Every room in this unit
Living and dining about 126 sq ft, Master bedroom about 84 sq ft, Second bedroom about 67 sq ft, Kitchen about 51 sq ft, Bath about 29 sq ft, Balcony about 29 sq ft, Second bath about 25 sq ft, Passage about 21 sq ft.
3 BHK 1 unit · none available
382 sq ft carpet as drawn
- Carpet, filed
- 382 sq ft
- Built-up
- about 458 sq ft
- Super built-up
- about 535 sq ft
Every room in this unit
Living and dining about 94 sq ft, Master bedroom about 63 sq ft, Second bedroom about 50 sq ft, Third bedroom about 41 sq ft, Kitchen about 38 sq ft, Bath about 22 sq ft, Balcony about 22 sq ft, Second bath about 19 sq ft, Passage about 19 sq ft, Third bath about 16 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹4,435 to ₹9,213 per sq ft |
|---|---|
| Sold and booked | 110 sold, 0 booked |
| Still available | 67 units, 147–434 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from March 2023 to December 2027, 4.8 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Uruli Kanchan |
|---|---|
| Taluka | Haveli |
| Street, as filed | Pune Solapur Road |
| Bounded north by | Gat No- 514 |
| Bounded east by | 30 mtr Road |
| Bounded south by | Gat No- 504 and 505 |
| Bounded west by | Gat No-521 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Shree Mangalmurti Associates Phase-I |
|---|---|
| Registered office | 118, South B, Fortune Estate, Pune Solapur Road, Hadapsar, 15. No., Pune 411028 |
Professionals named on the filing
| Architect | Atit Admulwar CA/2008/41887 |
|---|---|
| Engineer | vaibhav mane 14078387 |
| Chartered Accountant | Ritesh Shah 122547 |
| Chartered Accountant | Yogesh D Mali 194796 |
| Advocate | Adv. Anil Tambe |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
2 cases against this project, 2 with an order on record, filed between Nov 2022 and Aug 2024. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC005000000471522 | Aug 2024 | Order passed Aug 2024 |
| CC005000000177873 | Nov 2022 | Order passed Nov 2022 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report 123.pdf | 16 May 2018 |
|---|---|
| Promoter's declaration, Form B Form B Developers (P-I) 10-04-2024.pdf | 10 April 2024 1 older version on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100016541 |
| Promoter | Shree Mangalmurti Associates Phase-I |
| Project type | Others · Building development |
| Locality | Uruli Kanchan — Haveli taluka, pincode 412202 |
| Applied on | 16 May 2018 |
| Registered on | 23 May 2018 |
| Completion, as first filed | 30 March 2023 |
| Due | 31 December 2027 4.8 years later |
| Units declared | 278 |
| Units sold | 110 of 278 sold (40%), 168 still unsold |
| Complaints | 2 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 11 May 2026 |
| Application reference | REA52100037369 |
| Current status | Active |
| Record last changed | 13 May 2026 · 4 months ago |
Where the sold count comes from, and whether it holds up. 110 of 278 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 278 units and reaches the same answer — 110 sold, 109 of them with money recorded as received against a named unit, and 67 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 13 May 2026.
Common questions
- Is Green Fantasy Phase-I registered with MahaRERA?
- Yes. It is registered as P52100016541, filed on 23 May 2018, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Green Fantasy Phase-I due to be handed over?
- The promoter has told MahaRERA December 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Green Fantasy Phase-I been delayed?
- Yes. The first date filed was March 2023. It now stands at December 2027, 4.8 years later.
- What did buyers actually pay in Green Fantasy Phase-I?
- A median of ₹6,280 per square foot of carpet, across 91 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Green Fantasy Phase-I?
- 67 of 278 were still unsold at the promoter's last filing, in 1, 2 BHK + shops, from 229–434 sq ft of carpet.
- Are there complaints against Green Fantasy Phase-I?
- 2 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Green Fantasy Phase-I?
- Shree Mangalmurti Associates Phase-I, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100016541 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Uruli Kanchan
Stock image
- Due
- Feb 2028
- Units
- 32
- Carpet
- —
- Typical unit
- —
Stock image
- Due
- Dec 2027
- Units
- —
- Carpet
- —
- Typical flat
- —
Stock image
- Valued from
- ₹5,064
- On offer
- Offices + shops
- Due
- Jan 2027
- Units
- 7
- Carpet
- 294–1,603
- Typical unit
- ~₹25.3 lakh