RERA registered P52100077052 Active
Aeternaa - C Wing Phase 1
Thergaon, Pune · Residential / Group Housing by Korelh Realltech LLP
Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.
In short
Aeternaa - C Wing Phase 1 in Thergaon is MahaRERA-registered (P52100077052) and still under construction, with possession filed for April 2029. Buyers have already registered 53 sales here at a median ₹11,864 per sq ft of carpet — not an asking price. About 70% of the 76 units are sold. Korelh Realltech LLP is the promoter.
- Sold here at
- ₹11,864
- per sq ft, 53 registered sales
- Available
- 2, 3 BHK
- 5 left · 611–916 sq ft
- Now due
- Apr 2029
- 16 months later than first promised
Where this is
Thergaon, PCMC, Pune, 411033
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Flat sizes on file
All 76 flats are filed unit by unit with the authority, the highest on floor 18. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 48 units · 3 available
3 BHK 28 units · 2 available
53 / 76
70% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 48 flats · 3 available
615 sq ft carpet as drawn, from 577–916 sq ft filed in this configuration
- Carpet, filed
- 615 sq ft
- Built-up
- about 738 sq ft
- Super built-up
- about 861 sq ft
Every room in this flat
Living and dining about 179 sq ft, Master bedroom about 119 sq ft, Second bedroom about 96 sq ft, Kitchen about 72 sq ft, Bath about 42 sq ft, Balcony about 42 sq ft, Second bath about 36 sq ft, Passage about 30 sq ft.
3 BHK 28 flats · 2 available
916 sq ft carpet as drawn
- Carpet, filed
- 916 sq ft
- Built-up
- about 1,099 sq ft
- Super built-up
- about 1,282 sq ft
Every room in this flat
Living and dining about 225 sq ft, Master bedroom about 150 sq ft, Second bedroom about 120 sq ft, Third bedroom about 98 sq ft, Kitchen about 90 sq ft, Bath about 53 sq ft, Balcony about 53 sq ft, Second bath about 45 sq ft, Passage about 45 sq ft, Third bath about 38 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹9,086 to ₹12,591 per sq ft |
|---|---|
| Sold and booked | 53 sold, 0 booked |
| Still available | 5 flats, 577–916 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2027 to April 2029, 16 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Thergaon |
|---|---|
| Taluka | Mulshi |
| Street, as filed | Thergaon, Pune |
| Bounded north by | 45 Meter Road |
| Bounded east by | CTS No 3480 P |
| Bounded south by | CTS 3564 P |
| Bounded west by | CTS No 2838 P |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Korelh Realltech LLP |
|---|---|
| Registered office | 12, Venu Banglow, Balaji Mandir Lane, Pashan, Opp Sus Road, Pune 411021 |
| Registered agents | 1 licensed agent may sell this project |
Professionals named on the filing
| Architect | I.P. Associates PCMC/LAS/0545/2017 |
|---|---|
| Engineer | Prashant Sharatchandra Kanawade |
| Engineer | Pravin Namdev Gunjal |
| Engineer | Spectrum Consultants NA |
| Chartered Accountant | Phule Wagh & Associates LLP 180704 |
| Chartered Accountant | Phule Wagh & Associates LLP 180704 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report 1 Copy of the legal title report (5).pdf | 24 June 2024 |
|---|---|
| Promoter's declaration, Form B Form B Letter.pdf | 15 January 2025 1 older version on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100077052 |
| Promoter | Korelh Realltech LLP |
| Project type | Residential / Group Housing · Building development |
| Locality | Thergaon — Mulshi taluka, pincode 411033 |
| Applied on | 15 June 2024 |
| Registered on | 16 July 2024 |
| Completion, as first filed | 30 December 2027 |
| Due | 30 April 2029 16 months later |
| Units declared | 76 |
| Units sold | 53 of 76 sold (70%), 23 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 16 July 2024 |
| Application reference | REA52100163104 |
| Current status | Active |
| Record last changed | 17 February 2025 · 19 months ago |
Where the sold count comes from, and whether it holds up. 53 of 76 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 76 flats and reaches the same answer — 53 sold, every one with money recorded as received against a named flat, and 5 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 17 February 2025.
Common questions
- Is Aeternaa - C Wing Phase 1 registered with MahaRERA?
- Yes. It is registered as P52100077052, filed on 16 July 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Aeternaa - C Wing Phase 1 due to be handed over?
- The promoter has told MahaRERA April 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Aeternaa - C Wing Phase 1 been delayed?
- Yes. The first date filed was December 2027. It now stands at April 2029, 16 months later.
- What did buyers actually pay in Aeternaa - C Wing Phase 1?
- A median of ₹11,864 per square foot of carpet, across 53 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Aeternaa - C Wing Phase 1?
- 5 of 76 were still unsold at the promoter's last filing, in 2, 3 BHK, from 611–916 sq ft of carpet.
- Are there complaints against Aeternaa - C Wing Phase 1?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Aeternaa - C Wing Phase 1?
- Korelh Realltech LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100077052 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Thergaon
Stock image
- Registered here
- ₹10,301
- On offer
- 2 BHK
- Due
- Apr 2027
- Units
- 35
- Carpet
- 718–726
- Sold at
- ₹74.5 lakh
Stock image
- Registered here
- ₹7,945
- On offer
- 2, 3 BHK +2 more
- Due
- Feb 2029
- Units
- 86
- Carpet
- 262–974
- Sold at
- ₹57 lakh
Stock image
- Registered here
- ₹11,562
- On offer
- 2 BHK
- Due
- Apr 2030
- Units
- 408
- Carpet
- 644–669
- Sold at
- ₹76.8 lakh