RERA registered P52100051396 Active
Trio Alpha
Tathawade, Pune · Residential / Group Housing by Trio Spaces
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Trio Alpha in Tathawade is MahaRERA-registered (P52100051396) and still under construction, with possession filed for December 2026. Buyers have already registered 100 sales here at a median ₹9,215 per sq ft of carpet — not an asking price. About 86% of the 116 units are sold. Trio Spaces is the promoter.
- Sold here at
- ₹9,215
- per sq ft, 100 registered sales
- Available
- 3, 4 BHK
- 3 left · 932–1,566 sq ft
- Now due
- Dec 2026
- a year later than first promised
Where this is
Tathawade, PCMC, Pune, 411033
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 116 flats are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 52 units · none available
3 BHK 44 units · 1 available
4 BHK 20 units · 2 available
100 / 116
86% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 52 flats · none available
741 sq ft carpet as drawn, from 741–763 sq ft filed in this configuration
- Carpet, filed
- 741 sq ft
- Built-up
- about 889 sq ft
- Super built-up
- about 1,037 sq ft
Every room in this flat
Living and dining about 216 sq ft, Master bedroom about 144 sq ft, Second bedroom about 115 sq ft, Kitchen about 86 sq ft, Bath about 50 sq ft, Balcony about 50 sq ft, Second bath about 43 sq ft, Passage about 36 sq ft.
3 BHK 44 flats · 1 available
932 sq ft carpet as drawn
- Carpet, filed
- 932 sq ft
- Built-up
- about 1,118 sq ft
- Super built-up
- about 1,305 sq ft
Every room in this flat
Living and dining about 229 sq ft, Master bedroom about 153 sq ft, Second bedroom about 122 sq ft, Third bedroom about 99 sq ft, Kitchen about 92 sq ft, Bath about 53 sq ft, Balcony about 53 sq ft, Second bath about 46 sq ft, Passage about 46 sq ft, Third bath about 38 sq ft.
4 BHK 20 flats · 2 available
1,566 sq ft carpet as drawn
- Carpet, filed
- 1,566 sq ft
- Built-up
- about 1,879 sq ft
- Super built-up
- about 2,192 sq ft
Every room in this flat
Living and dining about 348 sq ft, Master bedroom about 232 sq ft, Second bedroom about 186 sq ft, Third bedroom about 151 sq ft, Kitchen about 139 sq ft, Fourth bedroom about 139 sq ft, Bath about 81 sq ft, Balcony about 81 sq ft, Passage about 81 sq ft, Second bath about 70 sq ft, Third bath about 58 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹7,153 to ₹10,676 per sq ft |
|---|---|
| Sold and booked | 86 sold, 14 booked |
| Still available | 3 flats, 741–1566 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2025 to December 2026, a year later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Tathwade · shown on this site as Tathawade |
|---|---|
| Taluka | Mulshi |
| Street, as filed | AUNDH RAVET BRTS ROAD |
| Bounded north by | PROPERTY BEARING SR NO 6 |
| Bounded east by | PROPERTY BEARING SR NO 5 |
| Bounded south by | AUNDH RAVET BRTS ROAD |
| Bounded west by | PROPERTY BEARING SR NO 6 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Trio Spaces |
|---|---|
| Registered office | C Block 8/23, 411017, Pamnani Group, Near Vaishno Devi Temple, Vaishno Devi Temple, Pimpri, Pune 411017 |
| Registered agents | 1 licensed agent may sell this project |
Professionals named on the filing
| Architect | Sangram Salunkhe CA/18/91601 |
|---|---|
| Engineer | Arvind Jadhav |
| Engineer | Kamesh R Pamnani NA |
| Chartered Accountant | CA Trilok Ahuja and Company 104650 |
| Chartered Accountant | Gad 177608 |
| Chartered Accountant | Masulkar and Associates 615245 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report 3.pdf | 29 May 2023 7 older versions on file |
|---|---|
| Promoter's declaration, Form B Affidavit cum Declaration (Trio Spaces).pdf | 6 May 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100051396 |
| Promoter | Trio Spaces |
| Project type | Residential / Group Housing · Building development |
| Locality | Tathawade — Mulshi taluka, pincode 411033 |
| Applied on | 06 May 2023 |
| Registered on | 08 June 2023 |
| Completion, as first filed | 31 December 2025 |
| Due | 31 December 2026 a year later |
| Units declared | 116 |
| Units sold | 100 of 116 sold (86%), 16 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 17 August 2026 |
| Application reference | REA52100138535 |
| Current status | Active |
| Record last changed | 17 August 2026 · 30 days ago |
Where the sold count comes from, and whether it holds up. 100 of 116 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 116 flats and reaches the same answer — 86 sold, every one with money recorded as received against a named flat, 14 booked with a price agreed but nothing received yet, and 3 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 17 August 2026.
Common questions
- Is Trio Alpha registered with MahaRERA?
- Yes. It is registered as P52100051396, filed on 08 June 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Trio Alpha due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Trio Alpha been delayed?
- Yes. The first date filed was December 2025. It now stands at December 2026, a year later.
- What did buyers actually pay in Trio Alpha?
- A median of ₹9,215 per square foot of carpet, across 100 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Trio Alpha?
- 3 of 116 were still unsold at the promoter's last filing, in 3, 4 BHK, from 932–1,566 sq ft of carpet.
- Are there complaints against Trio Alpha?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Trio Alpha?
- Trio Spaces, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100051396 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Tathawade
Stock image
- Registered here
- ₹11,267
- On offer
- 3 BHK
- Due
- Dec 2029
- Units
- 99
- Carpet
- 1,172
- Sold at
- ₹1.3 crore
Stock image
- Locality median
- ₹9,820
- On offer
- Offices + shops
- Due
- Dec 2027
- Units
- 143
- Carpet
- 258–1,358
- Typical unit
- ~₹38.9 lakh
Stock image
- Registered here
- ₹10,526
- On offer
- 2, 3 BHK + shops
- Due
- Jun 2027
- Units
- 694
- Carpet
- 658–1,763
- Sold at
- ₹80.4 lakh