Z Zomefy

RERA registered P52100050644 Completed

Eco City

Talegaon Dabhade, Pune · Residential / Group Housing by Namrata Promoters And Builders

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Eco City in Talegaon Dabhade is MahaRERA-registered (P52100050644) and was handed over in August 2026. Buyers have already registered 95 sales here at a median ₹5,609 per sq ft of carpet — not an asking price. About 100% of the 95 units are sold. Namrata Promoters And Builders is the promoter.

Stock image, not a photograph of Eco City Stock image
Where
Talegaon Dabhade
pincode 410507
Sold here at
₹5,609
per sq ft, 95 registered sales
Available
None left
every flat filed as sold or held
Now due
Aug 2026
7 months later than first promised
A stock photograph, not Eco City. We have no picture of this site yet.

Where this is

Talegaon Dabhade, Rural, Pune, 410507

Village
Varale
Taluka
Mawal
Pincode
410507
Coordinates
18.746847, 73.690016

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 95 flats are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 95 units · all sold

95 units 403 sq ft 37.4 sq m as filed
Units sold

95 / 95

Nearly sold out

100% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 95 flats · none available

403 sq ft carpet as drawn

Carpet, filed
403 sq ft
Built-up
about 484 sq ft
Super built-up
about 564 sq ft
Every room in this flat

Living and dining about 151 sq ft, Master bedroom about 101 sq ft, Kitchen about 60 sq ft, Bath about 35 sq ft, Balcony about 35 sq ft, Passage about 20 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹5,609 per sq ft of carpet, median of 95 registered sales
Range across those sales ₹5,220 to ₹6,218 per sq ft
Sold and booked 95 sold, 0 booked
Still available 0 flats, 403 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jan 2026
Current status Handed over Aug 2026

Revised projection

The completion date has moved from January 2026 to August 2026, 7 months later, on the promoter's own revised filing.

Buyers who took possession late here may still have had a claim under section 18 of the Real Estate (Regulation and Development) Act, which entitles them to interest for every month of delay beyond the date in their agreement. More usefully for anyone buying today, this is a record of how this promoter performed against their own filed date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

27/1/2B hissa No 5,6 & 7 is the plot this project is built on, as filed
Revenue village Varale · shown on this site as Talegaon Dabhade
TalukaMawal
Street, as filed Talegaon varale road
Bounded north by 12 mtr road
Bounded east by Eco City 2 residential project
Bounded south by open plot
Bounded west by club house

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerNamrata Promoters And Builders
Registered office301-303, Ashok Sankul Ii, Range Hills Road, Near Icici Bank, Ashok Nagar, Pune 411007

Professionals named on the filing

Architect Laxman Thite AOP CA/89/12285
Engineer Sanjivani Ade
Engineer Sumant Chorey
Chartered Accountant SSAP & Associates LLP 044132

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

13 February 2023 is when an advocate last certified the title to this land
Title report Ecocity_RERA_Legal_Title_Report_Compressed.pdf 13 February 2023 2 older versions on file
Promoter's declaration, Form B Form B_compressed.pdf 17 January 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100050644
Promoter Namrata Promoters And Builders
Project typeResidential / Group Housing · Building development
LocalityTalegaon Dabhade — Mawal taluka, pincode 410507
Applied on20 February 2023
Registered on21 April 2023
Completion, as first filed30 January 2026
Handed over30 August 2026 7 months later
Units declared95
Units sold All 95 sold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 19 August 2026
Application referenceREA52100132410
Current statusCompleted
Record last changed 15 April 2026 · 5 months ago

Where the sold count comes from, and whether it holds up. 95 of 95 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 95 flats and reaches the same answer — 95 sold, every one with money recorded as received against a named flat, and 0 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 15 April 2026.

Common questions

Is Eco City registered with MahaRERA?
Yes. It is registered as P52100050644, filed on 21 April 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has Eco City been handed over?
Yes. The completion date on the register is August 2026.
Has Eco City been delayed?
Yes. The first date filed was January 2026. It now stands at August 2026, 7 months later.
What did buyers actually pay in Eco City?
A median of ₹5,609 per square foot of carpet, across 95 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Eco City?
None. All 95 are filed as sold or booked.
Are there complaints against Eco City?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Eco City?
Namrata Promoters And Builders, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100050644 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Talegaon Dabhade