Z Zomefy

RERA registered P52100028378 Active

VTP Sierra Phase1

Sus, Pune · Others by Prasanna Developers

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

VTP Sierra Phase1 in Sus is MahaRERA-registered (P52100028378) and still under construction, with possession filed for June 2027. Buyers have already registered 504 sales here at a median ₹8,696 per sq ft of carpet — not an asking price. About 98% of the 515 units are sold. 22 complaints sit on the filing. Prasanna Developers is the promoter.

Stock image, not a photograph of VTP Sierra Phase1 Stock image
Where
Sus
pincode 411045
Sold here at
₹8,696
per sq ft, 504 registered sales
Available
2 BHK, Shops
10 left · 571–1,190 sq ft
Now due
Jun 2027
a year later than first promised
A stock photograph, not VTP Sierra Phase1. We have no picture of this site yet.

Where this is

Sus, PMRDA, Pune, 411045

Village
Sus
Taluka
Mulshi
Pincode
411045
Coordinates
18.553490, 73.760760

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 515 units are filed unit by unit with the authority, the highest on floor 26. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 378 units · 4 available

100 units 571 sq ft 53.09 sq m as filed
52 units 618 sq ft 57.46 sq m as filed
52 units 666 sq ft 61.84 sq m as filed
48 units 699 sq ft 64.94 sq m as filed
48 units 715 sq ft 66.44 sq m as filed
52 units 754 sq ft 70.06 sq m as filed
22 units 763 sq ft 70.9 sq m as filed
4 units 1109 sq ft 103.05 sq m as filed

3 BHK 130 units · all sold

4 units 763 sq ft 70.9 sq m as filed
26 units 988 sq ft 91.83 sq m as filed
52 units 1087 sq ft 101.03 sq m as filed
48 units 1109 sq ft 103.05 sq m as filed

Shops 7 units · 6 available

1 unit 365 sq ft 33.93 sq m as filed
1 unit 911 sq ft 84.61 sq m as filed
1 unit 1069 sq ft 99.33 sq m as filed
1 unit 1116 sq ft 103.69 sq m as filed
1 unit 1161 sq ft 107.85 sq m as filed
1 unit 1174 sq ft 109.08 sq m as filed
1 unit 1190 sq ft 110.54 sq m as filed
Units sold

505 / 515

Nearly sold out

98% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

2 BHK 378 units · 4 available

571 sq ft carpet as drawn, from 571–1,109 sq ft filed in this configuration

Carpet, filed
571 sq ft
Built-up
about 685 sq ft
Super built-up
about 799 sq ft
Every room in this unit

Living and dining about 166 sq ft, Master bedroom about 111 sq ft, Second bedroom about 89 sq ft, Kitchen about 67 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Second bath about 33 sq ft, Passage about 28 sq ft.

3 BHK 130 units · none available

1,087 sq ft carpet as drawn, from 763–1,109 sq ft filed in this configuration

Carpet, filed
1,087 sq ft
Built-up
about 1,304 sq ft
Super built-up
about 1,522 sq ft
Every room in this unit

Living and dining about 267 sq ft, Master bedroom about 178 sq ft, Second bedroom about 143 sq ft, Third bedroom about 116 sq ft, Kitchen about 107 sq ft, Bath about 62 sq ft, Balcony about 62 sq ft, Second bath about 53 sq ft, Passage about 53 sq ft, Third bath about 45 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹8,696 per sq ft of carpet, median of 504 registered sales
Range across those sales ₹7,874 to ₹12,966 per sq ft
Sold and booked 503 sold, 2 booked
Still available 10 units, 365–1190 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

1 further sale is set aside. It divides out beyond ₹21,741 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.

Timeline audit

Original proposed Jun 2026
Current status Due Jun 2027

Revised projection

The completion date has moved from June 2026 to June 2027, a year later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S.No.4 part ,43 1,44 1,44 2,45 1,45 2,46 1,46 2 is the plot this project is built on, as filed
Revenue village Sus
TalukaMulshi
Street, as filed Baner Sus Road
Bounded north by Compound wall
Bounded east by part of same layout
Bounded south by 9 m wide Road
Bounded west by 30m wide road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerPrasanna Developers
Registered officeLevel 8, Solitaire World, Mumbai Pune Highway, Regency Classic, Baner, Pune 411045

Professionals named on the filing

Architect VK design & projects Pvt. Ltd. CA/2002/29235
Engineer Strudcom Consultants Private Limited. NA
Engineer Vinayak NA
Chartered Accountant Gmks & Co. 134685
Chartered Accountant Kvmds & Associates 145312
Chartered Accountant Spak & Co. 172292

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

22 cases against this project, 7 with an order on record, filed between Sep 2024 and Aug 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12605135 Aug 2026 No order on record
CC12605084 Aug 2026 No order on record
CC12605037 Aug 2026 No order on record
CC12605009 Aug 2026 No order on record
CC12604947 Aug 2026 No order on record
CC12604945 Aug 2026 No order on record
CC12604794 Jul 2026 No order on record
CC12604195 Jul 2026 No order on record
CC12604101 Jul 2026 No order on record
CC12603519 Jun 2026 No order on record
Show the remaining 12 cases
CC12603178 May 2026 No order on record
CC12602988 May 2026 No order on record
CC12602590 May 2026 No order on record
CC12602193 Apr 2026 No order on record
CC12504042 Nov 2025 No order on record
CC12504043 Nov 2025 Order passed Nov 2025
CC12504041 Nov 2025 Order passed Nov 2025
CC12503600 Oct 2025 Order passed Oct 2025
CC12400611 Oct 2024 Order passed Oct 2024
CC12400612 Oct 2024 Order passed Oct 2024
CC12400148 Sep 2024 Order passed Sep 2024
CC12400124 Sep 2024 Order passed Sep 2024

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

7 January 2022 is when an advocate last certified the title to this land
Title report L.pdf 7 January 2022 3 older versions on file
Promoter's declaration, Form B Form B VTP Sierra (Notarized).pdf 15 February 2021

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100028378
Promoter Prasanna Developers
Project typeOthers · Building development
LocalitySus — Mulshi taluka, pincode 411045
Applied on15 February 2021
Registered on22 February 2021
Completion, as first filed30 June 2026
Due30 June 2027 a year later
Units declared515
Units sold 505 of 515 sold (98%), 10 still unsold
Complaints22 on record with MahaRERA
Certificate on file Extension certificate, issued 31 July 2026
Application referenceREA52100085234
Current statusActive
Record last changed 05 August 2026 · 2 months ago

Where the sold count comes from, and whether it holds up. 505 of 515 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 515 units and reaches the same answer — 503 sold, every one with money recorded as received against a named unit, 2 booked with a price agreed but nothing received yet, and 10 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 05 August 2026.

Common questions

Is VTP Sierra Phase1 registered with MahaRERA?
Yes. It is registered as P52100028378, filed on 22 February 2021, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is VTP Sierra Phase1 due to be handed over?
The promoter has told MahaRERA June 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has VTP Sierra Phase1 been delayed?
Yes. The first date filed was June 2026. It now stands at June 2027, a year later.
What did buyers actually pay in VTP Sierra Phase1?
A median of ₹8,696 per square foot of carpet, across 504 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in VTP Sierra Phase1?
10 of 515 were still unsold at the promoter's last filing, in 2 BHK + shops, from 571–1,190 sq ft of carpet.
Are there complaints against VTP Sierra Phase1?
22 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building VTP Sierra Phase1?
Prasanna Developers, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100028378 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Sus

Stock image, not a photograph of Sahajeevan Stock image
Nearby
₹8,988–9,339
On offer
2, 3 BHK
Under construction

Sahajeevan

West Pune Constructions LLP · Sus

0 sold
Slipped 4 months
Due
Apr 2030
Units
56
Carpet
664–971
Typical flat
~₹63.1 lakh
PR1260002600468
Stock image, not a photograph of Shree Mangalam Stock image
Registered here
₹7,866
On offer
2 BHK
Under construction

Shree Mangalam

Shree Developers And Builders · Sus

39 sold
Slipped 4 months
Due
Jul 2027
Units
28
Carpet
550–553
Sold at
₹31.2 lakh
P52100079100