RERA registered P52100031515 Completed
Joyville Hadapsar Annexe Phase 14
Shewalewadi, Pune · Residential / Group Housing by Joyville Shapoorji Housing Private Limited
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Joyville Hadapsar Annexe Phase 14 in Shewalewadi is MahaRERA-registered (P52100031515) and was handed over in December 2025. Buyers have already registered 132 sales here at a median ₹9,518 per sq ft of carpet — not an asking price. About 100% of the 132 units are sold. Joyville Shapoorji Housing Private Limited is the promoter.
- Sold here at
- ₹9,518
- per sq ft, 132 registered sales
- Available
- None left
- every flat filed as sold or held
- Possession
- Dec 2025
- as filed with MahaRERA
Where this is
Shewalewadi, PMRDA, Pune, 412307
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 132 flats are filed unit by unit with the authority, the highest on floor 22. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 92 units · all sold
2 BHK 40 units · all sold
132 / 132
100% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 92 flats · none available
371 sq ft carpet as drawn, from 371–489 sq ft filed in this configuration
- Carpet, filed
- 371 sq ft
- Built-up
- about 445 sq ft
- Super built-up
- about 519 sq ft
Every room in this flat
Living and dining about 139 sq ft, Master bedroom about 93 sq ft, Kitchen about 56 sq ft, Bath about 32 sq ft, Balcony about 32 sq ft, Passage about 19 sq ft.
2 BHK 40 flats · none available
560 sq ft carpet as drawn
- Carpet, filed
- 560 sq ft
- Built-up
- about 672 sq ft
- Super built-up
- about 784 sq ft
Every room in this flat
Living and dining about 163 sq ft, Master bedroom about 109 sq ft, Second bedroom about 87 sq ft, Kitchen about 65 sq ft, Bath about 38 sq ft, Balcony about 38 sq ft, Second bath about 33 sq ft, Passage about 27 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹7,757 to ₹12,538 per sq ft |
|---|---|
| Sold and booked | 132 sold, 0 booked |
| Still available | 0 flats, 371–560 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Shewalewadi |
|---|---|
| Taluka | Haveli |
| Street, as filed | Off Pune Solapur Highway |
| Bounded north by | 10-1 to 10-8 10-10 to 10-16 |
| Bounded east by | 10-1 to 10-8 10-10 to 10-16 |
| Bounded south by | Building Number 15 |
| Bounded west by | 10-1 to 10-8 10-10 to 10-16 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Joyville Shapoorji Housing Private Limited |
|---|---|
| Registered office | 41/44, Sp Centre, Minoo Desai Marg, Radio Club, Colaba, Mumbai City 400005 |
| Registered agents | 12 licensed agents may sell this project |
Professionals named on the filing
| Architect | Amitvaa Spacces CA/2015/70787 |
|---|---|
| Architect | MSK Architects and Associates CA/2015/70787 |
| Engineer | Akshay Lalit Kasar EN10-04768 |
| Chartered Accountant | B R Nagda & Co 127270 |
| Chartered Accountant | Harshad Doshi 008099 |
| Chartered Accountant | Harshad Doshi & Co. 196528 |
| Chartered Accountant | M S K C and Associates LLP 122071 |
| Chartered Accountant | Pooja Rajendrakumar Boob 432287 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report RERA Title_Manjri-compressed_compressed.pdf | 18 October 2021 |
|---|---|
| Promoter's declaration, Form B Formb B - JSHPL - Ph 14-compressed.pdf | 7 October 2021 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100031515 |
| Promoter | Joyville Shapoorji Housing Private Limited |
| Project type | Residential / Group Housing · Building development |
| Locality | Shewalewadi — Haveli taluka, pincode 412307 |
| Applied on | 18 October 2021 |
| Registered on | 25 October 2021 |
| Completion, as first filed | 31 December 2025 |
| Handed over | 31 December 2025 |
| Units declared | 132 |
| Units sold | All 132 sold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 25 October 2021 |
| Application reference | REA52100096046 |
| Current status | Completed |
| Record last changed | 25 October 2021 · over 4 years ago |
Where the sold count comes from, and whether it holds up. 132 of 132 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 132 flats and reaches the same answer — 132 sold, every one with money recorded as received against a named flat, and 0 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 25 October 2021.
Common questions
- Is Joyville Hadapsar Annexe Phase 14 registered with MahaRERA?
- Yes. It is registered as P52100031515, filed on 25 October 2021, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- Has Joyville Hadapsar Annexe Phase 14 been handed over?
- Yes. The completion date on the register is December 2025.
- Has Joyville Hadapsar Annexe Phase 14 been delayed?
- No. December 2025 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Joyville Hadapsar Annexe Phase 14?
- A median of ₹9,518 per square foot of carpet, across 132 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Joyville Hadapsar Annexe Phase 14?
- None. All 132 are filed as sold or booked.
- Are there complaints against Joyville Hadapsar Annexe Phase 14?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Joyville Hadapsar Annexe Phase 14?
- Joyville Shapoorji Housing Private Limited, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100031515 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Shewalewadi
Stock image
- Nearby
- ₹9,683
- On offer
- 1 BHK
- Done
- Dec 2025
- Units
- 129
- Carpet
- 537
- Typical flat
- ~₹52 lakh
Stock image
- Registered here
- ₹10,534
- On offer
- 3 BHK
- Done
- Jun 2028
- Units
- 88
- Carpet
- 642–652
- Sold at
- ₹54.9 lakh
Stock image
- Registered here
- ₹10,534
- On offer
- 2, 3 BHK
Joyville Celestia Phase 1
- Due
- Mar 2028
- Units
- 160
- Carpet
- 544–827
- Sold at
- ₹86.1 lakh