RERA registered P52100077792 Active
Santiago Sunrise
Sangvi, Pune · Others by Santiago Realtech Ventures
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Santiago Sunrise in Sangvi is MahaRERA-registered (P52100077792) and still under construction, with possession filed for April 2028. Buyers have already registered 34 sales here at a median ₹10,709 per sq ft of carpet — not an asking price. About 81% of the 48 units are sold. Santiago Realtech Ventures is the promoter.
- Sold here at
- ₹10,709
- per sq ft, 34 registered sales
- Available
- 3 BHK, Shops
- 9 left · 286–795 sq ft
- Now due
- Apr 2028
- 4 months later than first promised
Where this is
Sangvi, PCMC, Pune, 411027
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Unit sizes on file
All 48 units are filed unit by unit with the authority, the highest on floor 5. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 15 units · all sold
3 BHK 20 units · 1 available
Shops 13 units · 8 available
39 / 48
81% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 15 units · none available
573 sq ft carpet as drawn, from 573–586 sq ft filed in this configuration
- Carpet, filed
- 573 sq ft
- Built-up
- about 688 sq ft
- Super built-up
- about 802 sq ft
Every room in this unit
Living and dining about 167 sq ft, Master bedroom about 111 sq ft, Second bedroom about 89 sq ft, Kitchen about 67 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Second bath about 33 sq ft, Passage about 28 sq ft.
3 BHK 20 units · 1 available
719 sq ft carpet as drawn, from 719–795 sq ft filed in this configuration
- Carpet, filed
- 719 sq ft
- Built-up
- about 863 sq ft
- Super built-up
- about 1,007 sq ft
Every room in this unit
Living and dining about 177 sq ft, Master bedroom about 118 sq ft, Second bedroom about 94 sq ft, Third bedroom about 77 sq ft, Kitchen about 71 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Second bath about 35 sq ft, Passage about 35 sq ft, Third bath about 29 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹6,843 to ₹12,576 per sq ft |
|---|---|
| Sold and booked | 34 sold, 5 booked |
| Still available | 9 units, 275–795 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2027 to April 2028, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Sangavi · shown on this site as Sangvi |
|---|---|
| Taluka | Haveli |
| Street, as filed | Haveli |
| Bounded north by | by Plot No 68 to 73 |
| Bounded east by | by Property of Survey No 12 2 |
| Bounded south by | by 18 Mtrs D P Road |
| Bounded west by | by 9 Mtrs Internal Road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Santiago Realtech Ventures |
|---|---|
| Registered office | S. No. 28/2K/25, Office No. 2, Milind Society, Samarth Colony, Jagtap Dairy, Pimple Saudagar, Pune 411027 |
Professionals named on the filing
| Architect | Mahendra Thakur & Associates CA/2004/34769 |
|---|---|
| Engineer | Sonali B Amrutkar NA |
| Chartered Accountant | Akshay Lad & Associates 148903 |
| Chartered Accountant | B S Ghadage 126234 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Search Title Report.pdf | 9 October 2024 |
|---|---|
| Promoter's declaration, Form B Form B -Declaration by promoter.PDF | 9 October 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100077792 |
| Promoter | Santiago Realtech Ventures |
| Project type | Others · Building development |
| Locality | Sangvi — Haveli taluka, pincode 411027 |
| Applied on | 09 October 2024 |
| Registered on | 30 October 2024 |
| Completion, as first filed | 31 December 2027 |
| Due | 30 April 2028 4 months later |
| Units declared | 48 |
| Units sold | 39 of 48 sold (81%), 9 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 04 December 2024 |
| Application reference | REA52100164964 |
| Current status | Active |
| Record last changed | 06 November 2024 · 22 months ago |
Where the sold count comes from, and whether it holds up. 39 of 48 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 48 units and reaches the same answer — 34 sold, every one with money recorded as received against a named unit, 5 booked with a price agreed but nothing received yet, and 9 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 06 November 2024.
Common questions
- Is Santiago Sunrise registered with MahaRERA?
- Yes. It is registered as P52100077792, filed on 30 October 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Santiago Sunrise due to be handed over?
- The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Santiago Sunrise been delayed?
- Yes. The first date filed was December 2027. It now stands at April 2028, 4 months later.
- What did buyers actually pay in Santiago Sunrise?
- A median of ₹10,709 per square foot of carpet, across 34 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Santiago Sunrise?
- 9 of 48 were still unsold at the promoter's last filing, in 3 BHK + shops, from 286–795 sq ft of carpet.
- Are there complaints against Santiago Sunrise?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Santiago Sunrise?
- Santiago Realtech Ventures, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100077792 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Sangvi
Stock image
- Due
- Jul 2027
- Units
- 19
- Carpet
- —
- Typical unit
- —
Stock image
- Due
- Jul 2027
- Units
- 14
- Carpet
- —
- Typical unit
- —
Stock image
- Due
- Jul 2027
- Units
- 15
- Carpet
- —
- Typical unit
- —