Z Zomefy

RERA registered P52100052170 Active

Rajnakshatra Palace

Rui, Pune · Others by Devgiri Buildcon

Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.

In short

Rajnakshatra Palace in Rui is MahaRERA-registered (P52100052170) and still under construction, with possession filed for March 2027. Buyers have already registered 8 sales here at a median ₹3,378 per sq ft of carpet — not an asking price. About 26% of the 38 units are sold. Devgiri Buildcon is the promoter.

Stock image, not a photograph of Rajnakshatra Palace Stock image
Where
Rui
pincode 413133
Sold here at
₹3,378
per sq ft, 8 registered sales
Available
1 BHK, 2 BHK, Shops
22 left · 160–567 sq ft
Possession
Mar 2027
as filed with MahaRERA
A stock photograph, not Rajnakshatra Palace. We have no picture of this site yet.

Where this is

Rui, Baramati, Pune, 413133

Village
Rui
Taluka
Baramati
Pincode
413133
Coordinates
18.173489, 74.612538

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 38 units are filed unit by unit with the authority, the highest on floor 5. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 2 units · all available

2 units 332 sq ft 30.84 sq m as filed

2 BHK 20 units · 9 available

20 units 567 sq ft 52.68 sq m as filed

Shops 16 units · 11 available

2 units 115 sq ft 10.71 sq m as filed
2 units 160 sq ft 14.85 sq m as filed
2 units 168 sq ft 15.58 sq m as filed
2 units 169 sq ft 15.73 sq m as filed
2 units 173 sq ft 16.08 sq m as filed
2 units 240 sq ft 22.28 sq m as filed
1 unit 252 sq ft 23.37 sq m as filed
2 units 254 sq ft 23.6 sq m as filed

1 unit has no usable carpet area on file, so it is counted above but not drawn.

Units sold

10 / 38

Early sales

26% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

1 BHK 2 units · 2 available

332 sq ft carpet as drawn

Carpet, filed
332 sq ft
Built-up
about 398 sq ft
Super built-up
about 465 sq ft
Every room in this unit

Living and dining about 124 sq ft, Master bedroom about 83 sq ft, Kitchen about 50 sq ft, Bath about 29 sq ft, Balcony about 29 sq ft, Passage about 17 sq ft.

2 BHK 20 units · 9 available

567 sq ft carpet as drawn

Carpet, filed
567 sq ft
Built-up
about 680 sq ft
Super built-up
about 794 sq ft
Every room in this unit

Living and dining about 165 sq ft, Master bedroom about 110 sq ft, Second bedroom about 88 sq ft, Kitchen about 66 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Second bath about 33 sq ft, Passage about 28 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹3,378 per sq ft of carpet, median of 8 registered sales
Range across those sales ₹2,645 to ₹5,996 per sq ft
Sold and booked 10 sold, 0 booked
Still available 22 units, 115–567 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

1 further sale is set aside. It divides out beyond ₹8,445 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.

Timeline audit

Original proposed Mar 2027
Current status Due Mar 2027

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Gat No. 36/1, Plot No. 44, 45, 46 is the plot this project is built on, as filed
Revenue village Rui
TalukaBaramati
Street, as filed Behind Nakshatra Garden
Bounded north by Plot No 43
Bounded east by Plot No 34 35 36
Bounded south by Plot No 1
Bounded west by 12 Meter Wide Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerDevgiri Buildcon
Registered officePlot No 44, 45, 46, Gat No 36/1, Behind Nakshatra Garden, Rui, Pune 413133

Professionals named on the filing

Architect Bhosale Consultants STATE/R/2025/APL/15961
Engineer Aniket Bansilal Pawar 375034629
Engineer Bhosale Consultants STATE/R/2025/APL/15961
Chartered Accountant N N Salunke and Co
Chartered Accountant S N P S & Co LLP 160043

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

21 July 2023 is when an advocate last certified the title to this land
Title report Search Final Upload 1_compressed.pdf 21 July 2023
Promoter's declaration, Form B Form B.pdf 22 April 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100052170
Promoter Devgiri Buildcon
Project typeOthers · Building development
LocalityRui — Baramati taluka, pincode 413133
Applied on22 April 2023
Registered on27 July 2023
Completion, as first filed31 March 2027
Due31 March 2027
Units declared38
Units sold 10 of 38 sold (26%), 28 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 27 July 2023
Application referenceREA52100136696
Current statusActive
Record last changed 27 July 2023 · over 3 years ago 3 years untouched

Where the sold count comes from, and whether it holds up. 10 of 38 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 38 units and reaches the same answer — 10 sold, 8 of them with money recorded as received against a named unit, and 22 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 27 July 2023.

MahaRERA has not recorded a change to this project's record in 3 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Rajnakshatra Palace registered with MahaRERA?
Yes. It is registered as P52100052170, filed on 27 July 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Rajnakshatra Palace due to be handed over?
The promoter has told MahaRERA March 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Rajnakshatra Palace been delayed?
No. March 2027 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Rajnakshatra Palace?
A median of ₹3,378 per square foot of carpet, across 8 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Rajnakshatra Palace?
22 of 38 were still unsold at the promoter's last filing, in 1, 2 BHK + shops, from 160–567 sq ft of carpet.
Are there complaints against Rajnakshatra Palace?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Rajnakshatra Palace?
Devgiri Buildcon, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100052170 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Rui

Stock image, not a photograph of Vamika Stock image
Under construction

Vamika

Tusti Nidhi Properties · Rui

Due
Dec 2027
Units
Carpet
Typical flat
P52100078246
Stock image, not a photograph of Subhadra Phase 3 Stock image
Registered here
₹3,331
On offer
1 BHK + shops
Ready to move

Subhadra Phase 3

Subhadra Constructions · Rui

67 sold
Done
Dec 2026
Units
30
Carpet
88–456
Sold at
₹17.2 lakh
P52100066501