In short

Fab Icon in Raviwar Peth is MahaRERA-registered (PC1260002601257) and still under construction, with possession filed for April 2031. No registered sale rate is on file for this project or its locality yet. None of the units are filed as sold yet. M/s Iconstruct Fab Landmarks LLP is the promoter.

Stock image, not a photograph of Fab Icon Stock image
Where
Raviwar Peth
pincode 411002
Price
Not filed
no agreement or valuation on the register
Available
Shops
2 left · 770–813 sq ft
Now due
Apr 2031
4 months later than first promised
A stock photograph, not Fab Icon. We have no picture of this site yet.

Where this is

Raviwar Peth, Pune, 411002

Street map of Raviwar Peth centred on the coordinate filed for Fab Icon, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Peth
Taluka
Haveli
Pincode
411002
Coordinates
18.511826, 73.878847

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 4 units are filed unit by unit with the authority, the highest on floor 3. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Nothing filed here is a home. Every unit is registered as non-residential — shops, offices or similar — which is the promoter's own answer on the register rather than anything read off the areas below.

Office Space 2 units · not for sale

1 unit 750 sq ft 69.7 sq m as filed
1 unit 813 sq ft 75.53 sq m as filed

Shops 2 units · all available

1 unit 770 sq ft 71.51 sq m as filed
1 unit 813 sq ft 75.53 sq m as filed
Units sold

0 / 4

Pre-launch / early phase

0% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.

Office Space 2 units · none available

750 sq ft carpet as drawn, from 750–813 sq ft filed in this configuration

Carpet, filed
750 sq ft
Built-up
about 900 sq ft
Super built-up
about 1,050 sq ft

Shops 2 units · 2 available

770 sq ft carpet as drawn, from 770–813 sq ft filed in this configuration

Carpet, filed
770 sq ft
Built-up
about 924 sq ft
Super built-up
about 1,078 sq ft

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

Timeline audit

Original proposed Dec 2030
Current status Due Apr 2031

Revised projection

The completion date has moved from December 2030 to April 2031, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Survey No. 23, CTS No. 1028, Plot No. 35, Shukrawar Peth, Pune 411002 is the plot this project is built on, as filed
Revenue village Peth · shown on this site as Raviwar Peth
TalukaHaveli
Street, as filed Shukrawar Peth
Bounded north by CTS 1088 and CTS 1090A
Bounded east by CTS 1027
Bounded south by 24m wide road(Tilak Road)
Bounded west by CTS 1029

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerM/s Iconstruct Fab Landmarks LLP
Registered officeD-605/606, Building No.-D, Office No. 605/606, Business Court, Mukund Nagar, Swargate Police Station, Pune 411037

Professionals named on the filing

Architect Mangesh Gotal CA/2005/36501
Engineer Prem Dilip Kankariya REG/PMC/STE/1069/17
Chartered Accountant Priyesh Prakash Jain 194983

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

29 June 2026 is when an advocate last certified the title to this land
Title report Final Legal Title report (1).pdf 29 June 2026
Conveyance deed Development Agreement.pdf 2 April 2026
Promoter's declaration, Form B Form B- Developer.pdf 22 May 2026
Annexure A declaration Annexure A_Declaration-cum Undertaking.pdf 22 May 2026

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPC1260002601257
Promoter M/s Iconstruct Fab Landmarks LLP
Project typeCommercial · Building development
LocalityRaviwar Peth — Haveli taluka, pincode 411002
Applied on10 June 2026
Registered on20 July 2026
Completion, as first filed31 December 2030
Due30 April 2031 4 months later
Units declared4
Units sold None sold yet, all 4 on the market
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 20 July 2026
Application referenceACK25022606936
Current statusActive
Record last changed 20 July 2026 · 2 months ago

Nothing has sold yet. The promoter's quarterly progress report says none of the 4 units are gone, and the unit-by-unit list they file separately says the same: all 4 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 20 July 2026.

Common questions

Is Fab Icon registered with MahaRERA?
Yes. It is registered as PC1260002601257, filed on 20 July 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Fab Icon due to be handed over?
The promoter has told MahaRERA April 2031. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Fab Icon been delayed?
Yes. The first date filed was December 2030. It now stands at April 2031, 4 months later.
How many units are left in Fab Icon?
2 of 4 were still unsold at the promoter's last filing, in Shops, from 770–813 sq ft of carpet.
Are there complaints against Fab Icon?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Fab Icon?
M/s Iconstruct Fab Landmarks LLP, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 23 September 2026. The authority's own page for PC1260002601257 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Raviwar Peth