RERA registered P52100080199 Active
Sonigara Concord
Ravet, Pune · Others by Madanlal Kesrimal Sonigra
Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.
In short
Sonigara Concord in Ravet is MahaRERA-registered (P52100080199) and still under construction, with possession filed for April 2030. Buyers have already registered 31 sales here at a median ₹10,946 per sq ft of carpet — not an asking price. About 14% of the 248 units are sold. Madanlal Kesrimal Sonigra is the promoter.
- Sold here at
- ₹10,946
- per sq ft, 31 registered sales
- Available
- 1 BHK, 2 BHK, 3 BHK, Office Space, Shops
- 213 left · 276–987 sq ft
- Now due
- Apr 2030
- 4 months later than first promised
Where this is
Ravet, PCMC, Pune, 412101
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Unit sizes on file
All 248 units are filed unit by unit with the authority, the highest on floor 9. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 105 units · 82 available
2 BHK 47 units · 39 available
3 BHK 50 units · all available
Office Space 23 units · 22 available
6 further sizes, 6 units between them
Shops 23 units · 20 available
6 further sizes, 6 units between them
35 / 248
14% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 105 units · 82 available
406 sq ft carpet as drawn
- Carpet, filed
- 406 sq ft
- Built-up
- about 487 sq ft
- Super built-up
- about 568 sq ft
Every room in this unit
Living and dining about 152 sq ft, Master bedroom about 102 sq ft, Kitchen about 61 sq ft, Bath about 36 sq ft, Balcony about 36 sq ft, Passage about 20 sq ft.
2 BHK 47 units · 39 available
601 sq ft carpet as drawn, from 601–616 sq ft filed in this configuration
- Carpet, filed
- 601 sq ft
- Built-up
- about 721 sq ft
- Super built-up
- about 841 sq ft
Every room in this unit
Living and dining about 175 sq ft, Master bedroom about 117 sq ft, Second bedroom about 93 sq ft, Kitchen about 70 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Second bath about 35 sq ft, Passage about 29 sq ft.
3 BHK 50 units · 50 available
987 sq ft carpet as drawn, from 919–987 sq ft filed in this configuration
- Carpet, filed
- 987 sq ft
- Built-up
- about 1,184 sq ft
- Super built-up
- about 1,382 sq ft
Every room in this unit
Living and dining about 243 sq ft, Master bedroom about 162 sq ft, Second bedroom about 129 sq ft, Third bedroom about 105 sq ft, Kitchen about 97 sq ft, Bath about 57 sq ft, Balcony about 57 sq ft, Second bath about 49 sq ft, Passage about 49 sq ft, Third bath about 40 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹8,647 to ₹12,381 per sq ft |
|---|---|
| Sold and booked | 35 sold, 0 booked |
| Still available | 213 units, 265–987 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
1 further sale is set aside. It divides out beyond ₹27,364 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.
Timeline audit
Revised projection
The completion date has moved from December 2029 to April 2030, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Ravet |
|---|---|
| Taluka | Haveli |
| Street, as filed | RAVET |
| Bounded north by | RAILWAY LINE |
| Bounded east by | REMAINING PART OF S NO 179 |
| Bounded south by | ROAD |
| Bounded west by | 45 MTR WIDE ROAD |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Madanlal Kesrimal Sonigra |
|---|---|
| Registered office | 97, P Cts. No-95/P To 104/P, Kesarimal House, Nigdi, Mumbai Pune Road, Pradhikaran, Pune 412101 |
Professionals named on the filing
| Architect | Yojana Architects CA/87/10510 |
|---|---|
| Engineer | Vikas Krishna Kolhe |
| Chartered Accountant | CA Dolly Gandhi 635220 |
| Chartered Accountant | Navdeep Jinda&Associates 164075 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report legal title final (2 files merged) - converted.pdf | 2 May 2025 |
|---|---|
| Promoter's declaration, Form B FORMB.pdf | 15 March 2025 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100080199 |
| Promoter | Madanlal Kesrimal Sonigra |
| Project type | Others · Building development |
| Locality | Ravet — Haveli taluka, pincode 412101 |
| Applied on | 04 March 2025 |
| Registered on | 06 May 2025 |
| Completion, as first filed | 31 December 2029 |
| Due | 30 April 2030 4 months later |
| Units declared | 248 |
| Units sold | 35 of 248 sold (14%), 213 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 31 August 2026 |
| Application reference | REA52100168080 |
| Current status | Active |
| Record last changed | 28 May 2026 · 4 months ago |
Where the sold count comes from, and whether it holds up. 35 of 248 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 248 units and reaches the same answer — 35 sold, every one with money recorded as received against a named unit, and 213 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 28 May 2026.
Common questions
- Is Sonigara Concord registered with MahaRERA?
- Yes. It is registered as P52100080199, filed on 06 May 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Sonigara Concord due to be handed over?
- The promoter has told MahaRERA April 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Sonigara Concord been delayed?
- Yes. The first date filed was December 2029. It now stands at April 2030, 4 months later.
- What did buyers actually pay in Sonigara Concord?
- A median of ₹10,946 per square foot of carpet, across 31 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Sonigara Concord?
- 213 of 248 were still unsold at the promoter's last filing, in 1, 2, 3 BHK +2 more, from 276–987 sq ft of carpet.
- Are there complaints against Sonigara Concord?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Sonigara Concord?
- Madanlal Kesrimal Sonigra, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100080199 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Ravet
Stock image
- Registered here
- ₹9,533
- On offer
- 1, 2 BHK
- Due
- Apr 2027
- Units
- 124
- Carpet
- 285–456
- Sold at
- ₹33.5 lakh
Stock image
- Locality median
- ₹8,258
- Due
- Apr 2027
- Units
- 6
- Carpet
- 1199–1234
- Typical flat
- ~₹1 crore
Stock image
- Registered here
- ₹10,187
- On offer
- 1, 2, 3 BHK + row houses
1 complaint
- Due
- Jun 2028
- Units
- 655
- Carpet
- 474–2,415
- Sold at
- ₹75.5 lakh