Z Zomefy

RERA registered P52100046437 Active

Shree Ram Residency

Ravet, Pune · Residential / Group Housing by Shree Ram Developer

Official record Updated from the register 23 October 2026. Anything filed since then is not here yet.

In short

Shree Ram Residency in Ravet is MahaRERA-registered (P52100046437) and still under construction, with possession filed for December 2027. Buyers have already registered 9 sales here at a median ₹6,277 per sq ft of carpet — not an asking price. About 45% of the 20 units are sold. Shree Ram Developer is the promoter.

Stock image, not a photograph of Shree Ram Residency Stock image
Where
Ravet
pincode 412101
Sold here at
₹6,277
per sq ft, 9 registered sales
Available
1 BHK
11 left · 346–358 sq ft
Now due
Dec 2027
4 years later than first promised
A stock photograph, not Shree Ram Residency. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Pimpri Chinchawad (M Corp.) · Haveli

Ravet, PCMC, Pune, 412101

Village Pimpri Chinchawad (M Corp.)
Taluka Haveli
Pincode 412101

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 20 flats are filed unit by unit with the authority, the highest on floor 5. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
20 Total Licenced Units
Residential Typology • 100.0% of tower

1 BHK Residences

11 Available 20 registered total
Estimated Market Window ₹21.7 lakh – ₹22.5 lakh
Locality Benchmark ₹6,277 / sq ft
Carpet Variations as Filed Span: 346 to 358 sq ft
346 sq ft 32.19 sq m 5 units
354 sq ft 32.92 sq m 10 units
358 sq ft 33.3 sq m 5 units
Govt ASR Base: ₹18.6 lakh – ₹19.2 lakh 11 of 20 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
1 BHK 346 – 358 sq ft (32.19 – 33.3 sq m) ~415 – 430 sq ft ~484 – 501 sq ft 11 left of 20
Units sold

9 / 20

Selling steadily

45% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 20 flats · 11 available

354 sq ft carpet as drawn, from 346–358 sq ft filed in this configuration

Carpet, filed
354 sq ft
Built-up
about 425 sq ft
Super built-up
about 496 sq ft
Every room in this flat

Living and dining about 133 sq ft, Master bedroom about 88 sq ft, Kitchen about 53 sq ft, Bath about 31 sq ft, Balcony about 31 sq ft, Passage about 18 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹6,277 per sq ft of carpet, median of 9 registered sales
Range across those sales ₹5,772 to ₹7,215 per sq ft
Sold and booked 7 sold, 2 booked
Still available 11 flats, 346–358 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State Revised (+4 years)
Original Baseline
Dec 2023
Declared at registration
Current Statutory Date
Due
Dec 2027
4 years later than filed

Revised delivery projection

The completion date has moved from December 2023 to December 2027, 4 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

7/3 is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Ravet
TalukaHaveli
Street, as filed KIWALE
Bounded north by OPEN PLOT NO 67
Bounded east by 7 AND HALF M WIDE ROAD
Bounded south by OPEN PLOT NO 64
Bounded west by OPEN PLOT NO 58 59 60

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerShree Ram Developer
Registered officeSr No 7/3, Near Symbiosis College, Mumbai Pune Expressway, Kiwale, Pune 412101

Professionals named on the filing

Architect Aditya Pungavkar CA/2013/61900
Engineer Nikesh Manware
Engineer Rahul kapse
Chartered Accountant CA Dolly Gandhi 635220
Chartered Accountant Navdeep Jindal and Associates 164075

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

7 July 2022 is when an advocate last certified the title to this land
Title report title search report.pdf 7 July 2022
Promoter's declaration, Form B Form B for extension.pdf 21 February 2025 2 older versions on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100046437
Promoter Shree Ram Developer
Project typeResidential / Group Housing · Building development
LocalityRavet — Haveli taluka, pincode 412101
Applied on18 June 2022
Registered on28 July 2022
Completion, as first filed31 December 2023
Due31 December 2027 4 years later
Units declared20
Units sold 9 of 20 sold (45%), 11 still unsold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 21 April 2026
Application referenceREA52100114089
Current statusActive
Record last changed 28 May 2026 · 5 months ago

Where the sold count comes from, and whether it holds up. 9 of 20 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 20 flats and reaches the same answer — 7 sold, every one with money recorded as received against a named flat, 2 booked with a price agreed but nothing received yet, and 11 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 28 May 2026.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Shree Ram Residency registered with MahaRERA?
Yes. It is registered as P52100046437, filed on 28 July 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Shree Ram Residency due to be handed over?
The promoter has told MahaRERA December 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Shree Ram Residency been delayed?
Yes. The first date filed was December 2023. It now stands at December 2027, 4 years later.
What did buyers actually pay in Shree Ram Residency?
A median of ₹6,277 per square foot of carpet, across 9 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Shree Ram Residency?
11 of 20 were still unsold at the promoter's last filing, in 1 BHK, from 346–358 sq ft of carpet.
Are there complaints against Shree Ram Residency?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Shree Ram Residency?
Shree Ram Developer, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 23 October 2026. The authority's own registry page for P52100046437 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Ravet

Stock image, not a photograph of Elementis Oro Stock image
Nearby
₹8,147–8,691
On offer
2, 3 BHK
Under construction

Elementis Oro

Adi Homes · Ravet

0 sold
Due
Dec 2030
Units
66
Carpet
966–1,190
Typical flat
~₹98.8 lakh
PR1260002601161
Stock image, not a photograph of Elite Crown Stock image
Nearby
₹8,147
On offer
2 BHK
Under construction

Elite Crown

Proelite Realtech LLP · Ravet

5 sold
Due
Dec 2028
Units
20
Carpet
561–630
Typical flat
~₹36.6 lakh
PR1260002502244