RERA registered P52100053069 Active

Panache Flora

Ravet, Pune · Residential / Group Housing by Shree Bhagwati Construction

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Panache Flora in Ravet is MahaRERA-registered (P52100053069) and still under construction, with possession filed for February 2027. Buyers have already registered 35 sales here at a median ₹6,411 per sq ft of carpet — not an asking price. Shree Bhagwati Construction is the promoter.

Stock image, not a photograph of Panache Flora Stock image
Where
Ravet
pincode 412101
Sold here at
₹6,411
per sq ft, 35 registered sales
Available
2 BHK
1 left · 756 sq ft
Now due
Feb 2027
14 months later than first promised
A stock photograph, not Panache Flora. We have no picture of this site yet.

Where this is

Ravet, PCMC, Pune, 412101

Village
Ravet
Taluka
Haveli
Pincode
412101
Coordinates
18.645672, 73.748784

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 54 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 54 units · 1 available

8 units 696 sq ft 64.64 sq m as filed
25 units 700 sq ft 65.07 sq m as filed
1 unit 707 sq ft 65.67 sq m as filed
20 units 756 sq ft 70.28 sq m as filed
Units sold

36 / 54

Selling steadily

67% absorption rate · the promoter's two filings disagree

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 54 flats · 1 available

700 sq ft carpet as drawn, from 696–756 sq ft filed in this configuration

Carpet, filed
700 sq ft
Built-up
about 840 sq ft
Super built-up
about 980 sq ft
Every room in this flat

Living and dining about 204 sq ft, Master bedroom about 136 sq ft, Second bedroom about 109 sq ft, Kitchen about 82 sq ft, Bath about 48 sq ft, Balcony about 48 sq ft, Second bath about 41 sq ft, Passage about 34 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹6,411 per sq ft of carpet, median of 35 registered sales
Range across those sales ₹5,288 to ₹7,799 per sq ft
Sold and booked 35 sold, 0 booked
Still available 1 flat, 696–756 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2025
Current status Due Feb 2027

Revised projection

The completion date has moved from December 2025 to February 2027, 14 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

SURVEY NO 129, HISSA NO 3 is the plot this project is built on, as filed
Revenue village Ravet
TalukaHaveli
Street, as filed PIPE LINE ROAD
Bounded north by ROAD
Bounded east by BY PROPERTY OF MRS SWARUP BHONDVE
Bounded south by BY PROPERTY OF MR POPAT BHONDVE
Bounded west by BY PROPERTY OF MRS PRIYANKA BHONDVE

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerShree Bhagwati Construction
Registered officeF 703,, 703, Bhondve Tower, Spine Road, Plot No 93/104, Moshi Pradhikaran, Pune 412105

Professionals named on the filing

Architect Kunal Dilip Chaudhari CA/2008/43862
Engineer Gaurav D Patel
Engineer Vaibhav Umrao Shelwane
Chartered Accountant H. V. Patel And Associates 126701
Chartered Accountant S V S V And Accociates 149245

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

26 September 2023 is when an advocate last certified the title to this land
Title report Search Report.pdf 26 September 2023
Promoter's declaration, Form B DocScanner 26 Sep 2023 3-58 pm.pdf 26 September 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100053069
Promoter Shree Bhagwati Construction
Project typeResidential / Group Housing · Building development
LocalityRavet — Haveli taluka, pincode 412101
Applied on27 September 2023
Registered on12 October 2023
Completion, as first filed25 December 2025
Due28 February 2027 14 months later
Units declared54
Units sold 36 of 54 sold (67%), 18 still unsoldfilings disagree
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 11 September 2026
Application referenceREA52100147085
Current statusActive
Record last changed 20 May 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 36 of 54 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 36 of 54 sold, leaving 18. The unit-by-unit list they file separately covers 54 flats and marks 35 sold with 1 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 20 May 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Panache Flora registered with MahaRERA?
Yes. It is registered as P52100053069, filed on 12 October 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Panache Flora due to be handed over?
The promoter has told MahaRERA February 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Panache Flora been delayed?
Yes. The first date filed was December 2025. It now stands at February 2027, 14 months later.
What did buyers actually pay in Panache Flora?
A median of ₹6,411 per square foot of carpet, across 35 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Panache Flora?
1 of 54 were still unsold at the promoter's last filing, in 2 BHK, from 756 sq ft of carpet.
Are there complaints against Panache Flora?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Panache Flora?
Shree Bhagwati Construction, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100053069 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Ravet

Stock image, not a photograph of Prabha Heights Stock image
Locality median
₹8,260
Under construction

Prabha Heights

Advait Developers · Ravet

33 sold
Slipped 4 months
Due
Apr 2027
Units
6
Carpet
1199–1234
Typical flat
~₹1 crore
P52100078099
Stock image, not a photograph of Presidential Towers Stock image
Registered here
₹10,187
On offer
1, 2, 3 BHK + row houses
Under construction

Presidential Towers

Ceratec Construction · Ravet

85 sold

1 complaint

Slipped 6 months
Due
Jun 2028
Units
655
Carpet
474–2,415
Sold at
₹75.5 lakh
P52100046807
Stock image, not a photograph of Prima Imperia Stock image
Registered here
₹8,174
On offer
2 BHK
Under construction

Prima Imperia

Prima Landmarks · Ravet

60 sold
Slipped 4 months
Due
Apr 2027
Units
45
Carpet
726
Sold at
₹61 lakh
P52100053359