Mamurdi MHADA North

Ravet, Pune · Residential / Group Housing by Godrej Skyline Developers Limited

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Mamurdi MHADA North in Ravet is MahaRERA-registered (P52100024142) and still under construction, with possession filed for March 2027. Buyers have already registered 203 sales here at a median ₹3,944 per sq ft of carpet — not an asking price. About 99% of the 205 units are sold. 23 complaints sit on the filing. Godrej Skyline Developers Limited is the promoter.

Stock image, not a photograph of Mamurdi MHADA North Stock image
Where
Ravet
pincode 412101
Sold here at
₹3,944
per sq ft, 203 registered sales
Available
1 BHK
2 left · 429–457 sq ft
Now due
Mar 2027
3 years later than first promised
A stock photograph, not Mamurdi MHADA North. We have no picture of this site yet.

Where this is

Ravet, PCMC, Pune, 412101

Taluka
Haveli
Pincode
412101
Coordinates
18.670000, 73.710000

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 205 flats are filed unit by unit with the authority, the highest on floor 17. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 205 units · 2 available

77 units 429 sq ft 39.81–39.89 sq m as filed
32 units 430 sq ft 39.97 sq m as filed
32 units 456 sq ft 42.41 sq m as filed
64 units 457 sq ft 42.47–42.48 sq m as filed
Units sold

203 / 205

Nearly sold out

99% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 205 flats · 2 available

429 sq ft carpet as drawn, from 429–457 sq ft filed in this configuration

Carpet, filed
429 sq ft
Built-up
about 515 sq ft
Super built-up
about 601 sq ft
Every room in this flat

Living and dining about 161 sq ft, Master bedroom about 107 sq ft, Kitchen about 64 sq ft, Bath about 38 sq ft, Balcony about 38 sq ft, Passage about 21 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹3,944 per sq ft of carpet, median of 203 registered sales
Range across those sales ₹3,923 to ₹3,958 per sq ft
Sold and booked 203 sold, 0 booked
Still available 2 flats, 429–457 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Mar 2024
Current status Due Mar 2027

Revised projection

The completion date has moved from March 2024 to March 2027, 3 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

PLOT NO 1 BEARING SURVEY NO 10/1A/3, 10/1B, 11/1A, 11/2A PART, 11/3, 11/4 PART, 11/4/2, 11/1B, 12/1, 12/2/1, 12/2/2, 12/2/3, 13/2, 13/1B PART IN VILLAGE MAMURDI is the plot this project is built on, as filed
TalukaHaveli
Street, as filed SERVICE ROAD TO PUNE MUMBAI EXPRESSWAY
Bounded north by 18 METER WIDE DP ROAD AND PART LAND OF S NO 13
Bounded east by SURVEY NO 2
Bounded south by PART LAND OF S NO 13 AND 12 - GODREJ PARK GREENS
Bounded west by 18 METER WIDE DP ROAD

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerGodrej Skyline Developers Limited
Registered office5th Floor, Godrej One, Eastern Express Highway, Pirojsha Nagar, Vikhroli, Mumbai Suburban 400079

Professionals named on the filing

Architect Studio Thirty Architect And Planners
Engineer Bricklane
Chartered Accountant B S R & Co. LLP 129402
Chartered Accountant Md Deshpande And Co

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

23 cases against this project, 3 with an order on record, filed between Dec 2022 and Aug 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12604971 Aug 2026 No order on record
CC12604843 Aug 2026 No order on record
CC12604834 Jul 2026 No order on record
CC12604805 Jul 2026 No order on record
CC12604806 Jul 2026 No order on record
CC12604763 Jul 2026 No order on record
CC12604717 Jul 2026 No order on record
CC12604673 Jul 2026 No order on record
CC12604685 Jul 2026 No order on record
CC12604690 Jul 2026 No order on record
Show the remaining 13 cases
CC12604654 Jul 2026 No order on record
CC12604658 Jul 2026 No order on record
CC12604653 Jul 2026 No order on record
CC12604644 Jul 2026 No order on record
CC12604443 Jul 2026 No order on record
CC12601931 Apr 2026 No order on record
CC12601930 Apr 2026 No order on record
CC12601927 Apr 2026 No order on record
CC12601929 Apr 2026 No order on record
CC12601928 Apr 2026 No order on record
CC12503502 Oct 2025 Order passed Oct 2025
CC005000000290008 Jan 2024 Order passed Jan 2024
CC005000000177886 Dec 2022 Order passed Dec 2022

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

20 December 2019 is when an advocate last certified the title to this land
Title report Mamurdi_Supplemental title report.pdf 20 December 2019
Promoter's declaration, Form B Form B_compressed (1).pdf 19 March 2024 1 older version on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100024142
Promoter Godrej Skyline Developers Limited
Project typeResidential / Group Housing · Building development
LocalityRavet — Haveli taluka, pincode 412101
Applied on15 January 2020
Registered on21 January 2020
Completion, as first filed30 March 2024
Due30 March 2027 3 years later
Units declared205
Units sold 203 of 205 sold (99%), 2 still unsold
Complaints23 on record with MahaRERA
Certificate on file Original registration certificate, issued 15 May 2023
Application referenceREA52100068363
Current statusActive
Record last changed 16 June 2025 · 16 months ago

Where the sold count comes from, and whether it holds up. 203 of 205 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 205 flats and reaches the same answer — 203 sold, every one with money recorded as received against a named flat, and 2 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 16 June 2025.

Common questions

Is Mamurdi MHADA North registered with MahaRERA?
Yes. It is registered as P52100024142, filed on 21 January 2020, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Mamurdi MHADA North due to be handed over?
The promoter has told MahaRERA March 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Mamurdi MHADA North been delayed?
Yes. The first date filed was March 2024. It now stands at March 2027, 3 years later.
What did buyers actually pay in Mamurdi MHADA North?
A median of ₹3,944 per square foot of carpet, across 203 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Mamurdi MHADA North?
2 of 205 were still unsold at the promoter's last filing, in 1 BHK, from 429–457 sq ft of carpet.
Are there complaints against Mamurdi MHADA North?
23 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Mamurdi MHADA North?
Godrej Skyline Developers Limited, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100024142 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Ravet

Stock image, not a photograph of G.N. Heights Stock image
Registered here
₹5,123
On offer
2, 3 BHK
Under construction

G.N. Heights

Shitala Associates · Ravet

7 sold

1 complaint

Slipped 6.2 years
Due
Mar 2028
Units
144
Carpet
741–948
Sold at
₹44.5 lakh
P52100012993