Z Zomefy

RERA registered P52100035136 Active

Ace Abode Phase 2B

Ravet, Pune · Residential / Group Housing by Ace Global Realty

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Ace Abode Phase 2B in Ravet is MahaRERA-registered (P52100035136) and still under construction, with possession filed for June 2027. Buyers have already registered 78 sales here at a median ₹7,436 per sq ft of carpet — not an asking price. About 100% of the 78 units are sold. Ace Global Realty is the promoter.

Stock image, not a photograph of Ace Abode Phase 2B Stock image
Where
Ravet
pincode 412101
Sold here at
₹7,436
per sq ft, 78 registered sales
Available
None left
every flat filed as sold or held
Possession
Jun 2027
as filed with MahaRERA
A stock photograph, not Ace Abode Phase 2B. We have no picture of this site yet.

Where this is

Ravet, PCMC, Pune, 412101

Taluka
Haveli
Pincode
412101
Coordinates
18.653575, 73.724845

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 78 flats are filed unit by unit with the authority, the highest on floor 13. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 46 units · all sold

12 units 604 sq ft 56.08 sq m as filed
6 units 606 sq ft 56.28 sq m as filed
9 units 656 sq ft 60.93–60.97 sq m as filed
11 units 657 sq ft 61.0–61.03 sq m as filed
2 units 660 sq ft 61.29 sq m as filed
4 units 666 sq ft 61.88 sq m as filed
2 units 734 sq ft 68.22 sq m as filed

3 BHK 32 units · all sold

8 units 817 sq ft 75.9 sq m as filed
2 units 826 sq ft 76.77 sq m as filed
8 units 870 sq ft 80.82 sq m as filed
4 units 880 sq ft 81.8 sq m as filed
8 units 915 sq ft 85.03 sq m as filed
2 units 923 sq ft 85.71 sq m as filed
Units sold

78 / 78

Nearly sold out

100% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 46 flats · none available

604 sq ft carpet as drawn, from 604–734 sq ft filed in this configuration

Carpet, filed
604 sq ft
Built-up
about 725 sq ft
Super built-up
about 846 sq ft
Every room in this flat

Living and dining about 176 sq ft, Master bedroom about 117 sq ft, Second bedroom about 94 sq ft, Kitchen about 70 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Second bath about 35 sq ft, Passage about 29 sq ft.

3 BHK 32 flats · none available

817 sq ft carpet as drawn, from 817–923 sq ft filed in this configuration

Carpet, filed
817 sq ft
Built-up
about 980 sq ft
Super built-up
about 1,144 sq ft
Every room in this flat

Living and dining about 201 sq ft, Master bedroom about 134 sq ft, Second bedroom about 107 sq ft, Third bedroom about 87 sq ft, Kitchen about 80 sq ft, Bath about 47 sq ft, Balcony about 47 sq ft, Second bath about 40 sq ft, Passage about 40 sq ft, Third bath about 33 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹7,436 per sq ft of carpet, median of 78 registered sales
Range across those sales ₹6,605 to ₹9,084 per sq ft
Sold and booked 78 sold, 0 booked
Still available 0 flats, 604–923 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jun 2027
Current status Due Jun 2027

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

87/B, 88/10/1, 88/10/2, 88/4, 88/11, 88/16+17+18 KIWALE is the plot this project is built on, as filed
TalukaHaveli
Street, as filed Kiwale Road
Bounded north by Proposed Ace Abode Wing D
Bounded east by Part of S No 88
Bounded south by Part of S No 87B Ace Abode Wing B
Bounded west by Part of S No 88 and Ace Abode Wing A and B

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerAce Global Realty
Registered officeS. No. 17/2, Jhamtani House, Aundh Ravet Brts Road, Oppo D Prabhag, Pcmc Building, Near Hp Petrol Pump, Rahatani, Pune 411017
Registered agents 1 licensed agent may sell this project

Professionals named on the filing

Architect VKa Architecture CA/2002/29235
Engineer Bhausaheb Jangale PCMC/SE/0179/2025
Engineer Narendra Bhagwan Gosavi PCMC/LE/1232/2026
Engineer Pranav Shantaram Patil PCMC/SE/0181/2025
Chartered Accountant Ravi Talreja And Associates 140851

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

3 March 2022 is when an advocate last certified the title to this land
Title report Ace_Abode_Phase_2B - Legal Title Report_Compressed-1-5.pdf 3 March 2022 5 older versions on file
Promoter's declaration, Form B Ace_Abode_Phase_2B - Form B Affidavit Cum Declaration_Compressed.pdf 3 March 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100035136
Promoter Ace Global Realty
Project typeResidential / Group Housing · Building development
LocalityRavet — Haveli taluka, pincode 412101
Applied on25 April 2022
Registered on10 May 2022
Completion, as first filed30 June 2027
Due30 June 2027
Units declared78
Units sold All 78 sold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 30 January 2023
Application referenceREA52100107249
Current statusActive
Record last changed 10 June 2026 · 4 months ago

Where the sold count comes from, and whether it holds up. 78 of 78 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 78 flats and reaches the same answer — 78 sold, every one with money recorded as received against a named flat, and 0 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 10 June 2026.

Common questions

Is Ace Abode Phase 2B registered with MahaRERA?
Yes. It is registered as P52100035136, filed on 10 May 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Ace Abode Phase 2B due to be handed over?
The promoter has told MahaRERA June 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Ace Abode Phase 2B been delayed?
No. June 2027 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Ace Abode Phase 2B?
A median of ₹7,436 per square foot of carpet, across 78 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Ace Abode Phase 2B?
None. All 78 are filed as sold or booked.
Are there complaints against Ace Abode Phase 2B?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Ace Abode Phase 2B?
Ace Global Realty, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100035136 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Ravet

Stock image, not a photograph of Capri Stock image
Registered here
₹8,721
On offer
2, 3 BHK +2 more
Under construction

Capri

Knest Constructions LLP · Ravet

18 sold
Slipped 4 months
Due
Nov 2030
Units
350
Carpet
287–1,220
Sold at
₹36.9 lakh
P52100077412